You are on page 1of 1

E

S
N

W
NOTE:

1-ALL DRAWINGS ARE IN MILLIMETRES.


2-DRAWING ARE NOT TO BE SCALED.
3-ALL LEVELS ARE IN METRES.

HATCH INDEX

DATUM 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000
CUTTING
CHAINAGE 30 25 20 15 10 5 0 5 10 15 20 25 30
REDUCED LEVEL 86.500
FILLING
83.690 83.960 84.580 84.835 85.340 85.945 86.000 86.000 86.200 86.165 86.600 86.590
FORMATION
LEVEL
- 84.300 86.200 88.200 90.200 92.200 93.600 92.000 87.200 - - - -
DEPTH OF -
- - - - - - - - - - - -
CUTTING PROJECT TITLE EXTENSIVE SURVEY -20.17
DEPTH OF 0.340 1.620 3.365 6.255 7.600 6.000 3.300
- 4.860 1.035 - - - 6TH SEMESTER ,BE(CIVIL)
FILLING

C/S AT CBL
LOCATION
RAMAKUNJA, PUTTUR
TALUK, D.K.

COLLEGE VIVEKANANDA COLLEGE OF


ENGINEERING AND TECHNOLOGY

DEPARTMENT OF CIVIL ENGINEERING


VIVEKANANDA COLLEGE OF ENGINEERING
& TECHNOLOGY. PUTTUR (D.K)

DRAWING TITLE CROSS SECTION OF


PROPOSED BUND
DATUM 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000 70.000
CHAINAGE 30 25 20 15 10 5 0 5 10 15 20 25 30
REDUCED LEVEL 86.165
82.850 83.010 83.635 83.695 83.885 84.300 85.600 85.510 85.920 86.170 86.405 86.440 PROJECT NAME : NEW TANK PROJECT
FORMATION
LEVEL
- 84.000 86.000 88.100 90.100 92.200 93.600 91.900 89.500 87.200 - - -
DEPTH OF -
CUTTING
- - - - - - - - - - - - Dr. SANDEEP J. NAYAK
HEAD OF DEPT. :
DEPTH OF 0.990 2.365 4.405 7.900 8.000 6.390 3.580
- 6.215 1.030 - - -
FILLING
BATCH NO. : A4 DATE : 17.1.17

C/S AT LWL CHECK/APPROVED Mr. SHIVANAND ACHARYA

SCALE : 1 : 100

DRAWING NO. REVISION NO. SHEET NO.


NTP-3 01 5

You might also like