You are on page 1of 5

NATIONAL POWER CORPORATION

Small Power Utilities Group


Western Mindanao Operations Division
BONGAO DIESEL POWER PLANT

POWER INTERRUPTION REPORT


For the Period: October 25 to November 25, 2016

TIME NAPOCOR DISTRIBUTION LINE


(H) AFFECTED PLANT TROUBLE LINE TROUBLE
DATE UNIT NO.
Interrupted Restored FREQ. OUTAGE FREQ. OUTAGE
HRS. HRS.
26-Nov-16 0848H 0923H U8 1 0.58
30-Nov-16 1405H 1420H U7 1 0.25
1-Dec-16 1002H 1017H U6, U7 1 0.25
1-Dec-16 1552H 1748H 1.93
2-Dec-16 1038H 1138H U6,U8 1 1.00
7-Dec-16 0505H 0531H U8 1 0.43
11-Dec-16 1647H 1650H U4,U7 1 0.05
15-Dec-16 0735H 0808H U4,U5, U7 1 0.55
15-Dec-16 1031H 1103H U5, U6 1 0.53
16-Dec-16 0811H 0831H U6 1 0.33
16-Dec-16 0842H 0906H U6, U7 1 0.40
16-Dec-16 0927H 0943H U5, U7 1 0.27
18-Dec-16 2025H 2035H U5, U6 1 0.16
18-Dec-16 2144H 2154H U5 1 0.16
0 0.00 13 6.89
TOTAL PLANT OUTAGE (BROWNOUT)
Note:

Submitted by: Reviewed by:

LINGCATAN A. BASARI MARVIN L. MADJAD


Plant Head, Bongao DPP Designated Result Enginee
RPORATION
es Group
ations Division
WER PLANT

ON REPORT
November 25, 2016

DISTRIBUTION LINE
LINE FORCE MAJEURE PLANT
MAINTENANCE 4 5 6
SHUTDOWN REMARKS
FREQ. OUTAGE FREQ. OUTAGE (1-Yes / 0-No)
HRS. HRS. lf pf lf pf lf
1 A/T, Over Currentx
1 A/T, Over Currentx
1 A/T, Line Maintena x 0.25
1 A/T, Installation of x
1 A/T, Line Fault Lin x 1
1 A/T, Over Current x
1 A/T, Line Fault Low x 0.05
1 A/T, Line Fault Lowex 0.55 0.55
1 A/T, Line Fault Low x 0.53 0.53
1 A/T, Line Fault U6 x 0.33
1 A/T, Line Fault U6, x 0.40
1 A/T, Over Curren x 0.27
1 A/T, LINE FAULT x 0.16 0.16
1 A/T, Line Fault x 0.16
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Line Fault Uppe x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Line Fault Lowe x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
FULL SHUTDOWN, Rx
AT, Over Current 5 x
AT, Over Current 5 x

0.00 0.00 0.00 0.00 14.00


0
A/T - Auto breaker trip E.S.- Economic Shutdown
M/T - Manually open breaker

Approved by:

MARVIN L. MADJAD YAHCOB H. DARAYAN


Designated Result Engineer Manager, WMOD
7 8 p

pf lf pf lf pf lf pf
0.58
0.25
0.25

1
0.43
0.05
0.55

0.40
0.27