ON REPORT
November 25, 2016
DISTRIBUTION LINE
LINE FORCE MAJEURE PLANT
MAINTENANCE 4 5 6
SHUTDOWN REMARKS
FREQ. OUTAGE FREQ. OUTAGE (1-Yes / 0-No)
HRS. HRS. lf pf lf pf lf
1 A/T, Over Currentx
1 A/T, Over Currentx
1 A/T, Line Maintena x 0.25
1 A/T, Installation of x
1 A/T, Line Fault Lin x 1
1 A/T, Over Current x
1 A/T, Line Fault Low x 0.05
1 A/T, Line Fault Lowex 0.55 0.55
1 A/T, Line Fault Low x 0.53 0.53
1 A/T, Line Fault U6 x 0.33
1 A/T, Line Fault U6, x 0.40
1 A/T, Over Curren x 0.27
1 A/T, LINE FAULT x 0.16 0.16
1 A/T, Line Fault x 0.16
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Line Fault Uppe x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Line Fault Lowe x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
AT, Over Current 5 x
FULL SHUTDOWN, Rx
AT, Over Current 5 x
AT, Over Current 5 x
Approved by:
pf lf pf lf pf lf pf
0.58
0.25
0.25
1
0.43
0.05
0.55
0.40
0.27