Professional Documents
Culture Documents
trainees.
2. Learns line and staff functions, operations, management viewpoints and company
opportunities.
8. Work with and through management to develop and implement actions that protect
- This will help to determine two things which are what needs to be learned by the
- Able to get the staff properly motivated, or effectively describe the reasons
behind the need for the training that recommending to the employees.
- Effective managers should develop their people skills and actually enjoy relating
to people. They should love to talk, interact with people, love listening to their
problems, love coming up with solutions to these problems, and enjoy motivating
- They need to keep themselves abreast of the latest developments in their field.
- A passion for learning will make this less of a chore and more of a spirited
endeavor.
2.2 Interview Activities
the same time by one interviewer. In this group interview task, candidates will be
given a brief, based on a scenario they are likely to face as an employee of the
company they are interviewing for. The brief will outline certain problems, which
Group interview with multiple candidates are very efficient.This allow the
interviewer to observe multiple candidates at the same time. Case study interview
activity is designed to test the candidates ability to work as part of a team, as well as
their leadership and problem solving skills. As is the case in real life, there is usually
no single correct answer to standard case interview questions. Through this activity,
we will know whether the candidates able to prove their case, using sound analysis
and by demonstrating an understanding of the main case issues or not. We also can
know they have treat others competitors as colleagues or not and their ability to take
the lead but do not talk over people. We also can observe their leadership by
including any introverts in the group discussion and how much they know about our
company.
B. The Role Play Exercise
This group interview activity places the candidates in a situation they are
likely to face in their prospective role and test their ability to perform well in it. The
candidates will have several minutes to prepare for their roles after being given a
short brief of the scenario at hand, which will often mirror something that could occur
in the job that they are applying for. Every role will be essential in solving the given
situation. These roles will have a hierarchy system and will be assigned randomly to
the candidates. Appropriate time will be provided to the candidates to discuss and
work together in solving the situation according to their roles given. Interviewer will
monitor the performance of the candidates throughout the period. Afterwards, they
will present their solution to the situation to ensure whether they understand their
roles and have contributed to their group in accordance to their roles fairly and
responsibly.
depending on the job role. For example, leadership qualities, the ability to provide
good service and problem solving under pressure. In addition, the role play helps
assess whether the candidates can be flexible in adapting to what they are assigned
to do or work with different people and adapt to group dynamics. On the other hand,
the hierarchy system determines whether the candidates with low tier roles have the
patience and obedience to work under someone while carrying out their
responsibilities whereas for the high tier roles, it determines whether the candidates
is dictatorial or delicate to the people work below them and have enough qualification
to be a leader.
C. The Practical Task
problem. The practical task may or may not be relevant to the job. For example,
candidates may be asked to build the highest structure with the least amount of
bricks or something similar. They also may get to play Lego during the interview, but
they are actually being tested on their ability to contribute their ideas, listen to others
and value their ideas, creativity, and communicate and work as part of a team.
2.2.2 Individual Assessment
A. Face-to-face Interview
Individual, face-to-face interviews are by far the most popular and efficient
form of assessment. Allowing interviewer to get up close and personal with each
candidate while keeping an eye on their body language is far more effective than any
other interviewing format. The interviewer will see how the candidate will fit into the
company and will ask questions to test the candidate listed skills and experience in
the resume. Through this interview, interviewer also can thoroughly assess the
individual, have opportunity to dig deeper and test the candidates commitment.
B. Dining Interview
their table manner and ability to mix business with pleasure. It also helps the
employer further gets to know how the candidate fit in with additional members of the
team and gets an insight on how the candidate behave in more relax surroundings.
The sense of time of the candidate also can determine during the interview. All these
Construction technology in the industry today have reach to its peak, the invention of 3D
printing, BIM, drones and more has benefit a lots to the industry by providing safer working
environment , shorter design and construction period as well as lower the spent of cost. Yet
still many of the developers resist to committing their time and money on the advance
technologies, without the adoption of advance technologies, they are less likely to be
Apart from saving time and cost, creating safer working environment, with proper
management and implement of these advance technology it can help to develop the core
competency for a company. From the study of Cost-quality trade-off triangle, a competitive
advantages can be focusing on the development of either sector (cost ,quality or time) and
come out with own unique working method .Below we will be explaining how each of this
software can help in developing the competitive advantages in the construction industry.
devices, infrastructure and processes to create, process, store, protect and exchange all
forms of electronic data. Information technology includes several layers of physical devices
applications (software) used for performing essential functions. In the construction industry,
employees must adopt new forms of technology to achieve the construction project's time,
cost and quality objectives. In the construction phase and the life cycle, the construction
industry depends on a lot of information. Its important that the information provided to the
construction site enables task control, data integration, material and resource control, and
communication between the company and the suppliers. Information technology systems
make the staff more flexible in their work by allowing remote access to the companys
electronic network. Basically, the role of information technology is to monitor processes and
IT is a main requirement for improving the way to manage and run the organization.
3.1.1 Building Information Modeling (BIM)
Building Information Modeling (BIM) is a set of digital tools that can manage effectiveness of
construction projects. BIM has been used by the Architecture, Engineering and Construction
(AEC) industries with the insight and tools to more efficiently plan, design, construct, and
manage buildings and infrastructure. However, the technology is still relative new in
Malaysia due to it just been introduced few year back. The different BIM platforms that
available in the market includes Revit, Bentley Aecosim, Glodon, Cost-X, ArchiCAD and
Tekla. Currently, many players in the construction industry is progressively taking lead in the
positive adoption of BIM because BIM can be one of the conditions required of a company to
qualify for government and private projects, similar to what is practiced in some other
construction projects because it can overcome construction project problems such as delay,
The reason why our company has chosen BIM for our organization is because it
construction players. Besides, work can be reduced due to reduce error and omissions. As a
result, the construction cost will be lowered due to better cost control and predictability.
Moreover, the overall duration of construction also will be shortened due to reduction of
efficiency, productivity and job satisfaction which will result in reduction in operating cost.
These advantages enable our company to complete a higher quality project with shorter
construction duration. This will provide opportunity to our company in order to involved in
line in a project. Whether it is access to emails, texts, websites documents, social media or
phone calls using devices such as tablets and smartphone have become the main mean of
With the mobile device management software, our company can optimize the
functionality of mobile devices while protecting the configuration and data of mobile devices
in the network. This reduces the overall business security risks and support costs. Mobile
devices management is becoming more and more important as amount of mobile devices
Apart from that, there are many applications in the market that available for
smartphones and tablets which can be used to improve our business productivity either from
maps to project management. With the use Smartphone and tablet apps our employees can
access to information quickly and easily. By using some of the applications, we can view and
edit document, there are also apps which is a perfect replacement for face to face meeting
such as Skype that allow us to communicate with our client, supplier and contractor who
information from one or more sources, the custodianship and the distribution of that
information to those who need it, and its ultimate disposition through archiving or deletion.
storing, exploiting and distribute to the related department. Well organized and professional
data administration will enhance hierarchical effectiveness as well as providing high security
Cloud computing has a strong appeal in the construction industry, resulting in many benefits
due to changing staff and setting up new site locations. Often, construction workers need to
obtain company data to provide timely decision-making and reporting capabilities when
Construction companies from any location (such as job site, customer location and
satellite office) at any time can provide more freedom and easy access to information.
Project management is one of the most important factor to ensure a success of a project.
budget control, materials supplying and more. Managing is project is not an easy task, hence
having one of the project management software will cut down the work load of the project
Co-Construct is one of the best project management software in the market, its
function to assist project manager to curb cost, overseeing the working process, file hosting
for the tender and building owner documents, supervision of site progress and even detail
calculation of budget. The best part of Co-construct is once the project manager enter a
piece of information about the project, the data in it will flow from estimating, specifications,
advising in selection of materials, bids, change orders, budgets and finally to form a Quick
Book, all of the process is interrelated, and all the information in every of this single part can
be track and it will definitely lower down the work load of Quantity Surveyor or the finance
managers. To lower the budget co-construct even can act as a streamline bidding platform
for all of the interested supplier to come and bid for the work!
Apart from budgeting and financial control, if the Project Manager handle more than 1
project, there must be some confusion and complexity within different project , and he or she
will hardly visit to every of the project site to check on the progress. Co-construct can
coordinate schedules with the field office and make sure everything is working well on plan.
If there is a delay of work, Co-construct will report to the project manager and even provide
Furthermore, Co-construct can act as a communication platform for the client and
minimize the works needed, and it will probably lower down the time needed to complete the
task, and when the working period is lower, the spent cost will be lower as well!
Local area network LANS is no new tech, but still it efficiently provide the user with a highly
secure platform for the seamless flow of information. Local area network is a computer
network, which is limited in a enclose space, which is very suitable for field office or
Local area network also known as the private network ,which is host by a mother computer
(the central sever).The users in the enclose space can access to the sever freely, and share
or obtain the resources and information that is needed by them. As this is an private sever ,
it is hardly to be track or hack by the intruder , all the information will be directly store into the
central server and can be track only though the mother comp, this will probably make the
information management work easy as all the information can be remove or track in just one
server. An example for the Local area network is the POD system in Taylors
university(some known it as follow your print system) , POD is a printer server system that
interconnected to Taylors University Wifi .This system allow students who access to the
Taylors Wifi to send their documents and works up to the private server, for them to print it
After several detail study of information technology and information managing software , we
have understood how every of this software can bring benefits to the company, but how all
The basic tool for understanding the role of technology in competitive advantages is the
value supply chain. Value chain is a process or a set of activities that deliver value to the
products
Every value activities use some technology to combine purchase inputs and human
resources to produce some input. For an example, there are many sub-technology exist to
support the material handling process to move the materials from the storage area to the
construction site. Technology embodied not only for primary activities (construction and
transportation) but also supportive activities such as Computer-aided design which only
ability that differentiate an organization from others .Since the technology embodied every
each of the value activities of the construction supply chain and involved in achieving
linkages among activities, it can have a very powerful effect on both cost and differentiation.
Information systems technology is particularly pervasive in the value chain, since every
value activity creates and uses information. Information management systems are used in
For an example of how this link work is, both Company A and Company B wish to
experienced field managers to supervise the work progress ,but they still fail to complete the
task within 15 days because of the unexpected rain condition and mislocated of the
construction materials. Company B decide to manage the schedule time line with the project
management software: Co-Construction and before they start with the work, the software
alert them that there will be a heavy rains in the morning , so they switch the construction
period to the late afternoon ,and with the assist of the software , their construction materials
are arriving on time , and finally they manage to get their work done at the 13th days.
One of our company core competencies is to provide our customers with fast and high
quality construction method with a reasonable price. Comparing our company to Eco World
and IJM land, our company require shorter time to complete the same amount of task, this is
Our company developed measures to lean-up construction practice to reduce the material
waste, maximize efficiency and shorten the construction time. With the invention of precast
technology, our worker will precast most of the building components in a control environment
and the pre-measured material is cut to order and erected on site. Precast do brings tons of
benefits to us, the quality of the components is guarantee and at the same time it shorten the
construction time. Our company use modularization or mold to standardize the size of
buildings components such as single room unit, double room unit and bath room.
4.0 Reference
1. Construction Company Organizational Chart Introduction and Example. (n.d.). Retrieved July
2. 6 Essential Qualities Training Managers Need. (2017, March 07). Retrieved June 16,
2017, from https://www.getadministrate.com/blog/6-qualities-managers-need-for-team-
learning-development/
3. Group interview tasks and activities. (2016, September 16). Retrieved June 16, 2017,
from https://www.reed.co.uk/career-advice/group-interview-tasks-and-activities/
4. The 6 Different Types of Interview (And Their Pros and Cons). (2017, January 31).
Retrieved June 16, 2017, from https://www.coburgbanks.co.uk/blog/assessing-
applicants/6-different-types-of-interview/