Deliverable

Pipeline design basis


Wall thickness and material grade selection report
Pipeline pre commissioning, commissioning and start up
procedures (Specification)
Type and quality of pigs for pre-commissioning

Anti-buoyancy design calculation report


Crossing calculation / analysis
Pipeline stress analysis report
Cathodic protection design report
Support/Foundation design report
Resistance to penetration calculation

MTO FOR LINE PIPE


MTO FOR ANTICORROSION COATING
MTO FOR FIELD JOINT COATING
MTO FOR CONCRETE WEIGHT COATING
MTO FOR PIPELINE FLANGES
MTO FOR PIPELINE VALVES
MTO FOR ISOLATION JOINT
MTO FOR HOT INDUCTION BENDS
MTO for CASING PIPES
BULK MTO FOR PIPE AND FITTINGS
BULK MTO FOR CONCRETE
BULK MTO FOR STEEL
BULK MTO FOR ANCHOR BOLTS
ANODE QUANTITY FOR CP SYSTEM
TYPES AND QTY OF PIGS FOR PRECOMMISSIONING

COST ESTIMATE FOR THE ENTIRE PIPELINES (MATERIAL


PLUS CONSTRUCTION
COST WITH +/- 20% ACCURACY