OPRP * 1.0 Pasteurized 4.1 1st Calandria E1E01 4.

2 Milk Transfer
#02 Milk Storage Stage # 04 Pump (F1E1G04)

2.0 Milk Pump 4.0 Milk Transfer Pump 4.3 1st


F-1A1G01 F1E1G03 CalandriaE1E01
Stage # 05

2.1 SWB B1X01 3.11 1st Calandria E1E01


Stage # 03

4.4 Milk Transfer


2.2 Balance Tank Pump (F1E1G05)
B1C01 3.10 Milk Transfer Pump
F1E1G02

2.6 2.3 Feed Pump


Culinary B1G01 3.9 1st Calandria E1E01 4.5 2nd Calandria
steam Stage # 02 E2E01

2.4 PHE (C1E01)


2.7 3.8 Milk Transfer Pump
Steam F1E1G01
filter 4.6 Milk Transfer
2.5 Low Pump F1E2G01
Thermophile Direct 3.7 1st Calandria E1E01
Contact Pre-heater Stage # 01
D5E01

4.7 3rd Calandria


2.8 Milk transport 3.6 Hydro Cyclone F1E3E01
pump D5G01 B3V01

2.9 Configuration
Panel 3.5 Product Transfer
D3X01 Pump F1D3G02
4.8 Milk Transfer
Pump (F1E3G01)
3.4 Hygienic Flash Vessel
D3E01
Operator selection

3.3Temperature Treatment
Configuration 03 Holder
step
Configuration
D2E01, D2E02, D2E03 &
To A
1 step
D2E04

2.10 Direct
Contact Configuration 03 step
Regenerator
Heater D3E01
Configuration 1 step

2.11 Product 3.0 Direct Steam


Transfer Pump Tangential swirl Heater 3.2 steam 3.1 Culinary
F1D3G01 D1E01 & D1E02 filter steam
5.2 Hipex 5.1 Dryer 5.0 Buffer
Heater Feed Pump
G251
Tank A
02 (1000L)

5.3 5.6 Sugar


Duplex
Filter
sieving
5.9 Hot 6.1 Pre- Low Risk Area
V211 & Air from Heated Air
HCP
V216 5.7 Sugar Steam from Air HCP2
1
dosing (as Battery Handling
per recipe) Unit 6.3 Lecithin as per
5.4 High Product 6.4 Pre-
Pressure Feed Requirement Heated
5.8 Bag Air from
Pump with Filter
homogenizer 1st Air
(Powder
Stage Handling
Recovery)
Unit

5.5 High Pressure 6.0 Drying in 6.2 Drying in 6.5 Drying in


Feed Pump with Spray Tower 6.6 Pre-
Static Bed Fluidized Bed
homogenizer 2nd Stage Cooled
Hot
Air from
Air
CCP OPRP # Handling
OPRP #
# 01 03 01 Unit
7.1 Metal
detector

7.0 Filling in 6.9 6.8 6.7 Cooling in


peglerani filling Magnetic Sieving in Fluidized Bed
machine & packing circular pipe Sifter Cooling Section

OK
7.2 Palletize &
Not Handover to WH
OK Coarse Sugar
to Pasteurizer
Animal Grade
HCP
4

8.1 8.0 Fine


8.3 Filling 8.2 Dry Mixer Sugar Sugar from
Sifter WH

Nitrogen
HCP CCP
3 # 01

8.4 Wolf 8.5 Augur 8.6 Metal 8.7 Mini 8.8 Filling
Machine feeder detector hopper assembly (25 gm,
Hopper 125 gm, 400 gm,
OK
1 Kg)
Animal Grade Not OK
Powder

11.0 Handing 10.0 Stacking 9.0 Secondary 8.9 Check


Over to WH on Pallets packing in Cartons weigher