BEAM LOADING:
BEAM DL LL BEAM DL LL
LOW GRND 75/85 PSF 100 PSF 2ND 75/85 PSF 100 PSF
ORIGINAL
20.44 47.08 20.44 25.56 58.85 25.56
1B1 307.41 35.31 307.41 1B1 311.24 44.14 311.24
6.17 - 6.17 -
DL DL
6.24 13.70 6.24 7.80 17.13 7.80
4.44 - 4.44 -
LL LL
3.73 9.14 3.73 4.66 11.43 4.66
16.42 16.42 16.42 16.42
EL/WL EL/WL
153.58 - 153.58 153.58 - 153.58
3.56 11.6768 5.8384 3.56 11.6768 5.8384
- 672.46 - - 840.57 -
1B4A - 504.34 - 1B4A - 630.43 -
19.89 - 19.89 -
DL DL
- 171.00 - - 213.75 -
17.55 - 17.55 -
LL LL
LL LL
- 150.89 - - 188.61 -
- - - -
EL/WL EL/WL
- - - - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 943.97 - - 1,179.96 -
1B6 - 707.98 - 1B6 - 884.97 -
31.77 10.73 31.77 10.73
DL DL
- 295.49 - 369.36 -
19.19 6.82 19.19 6.82
LL LL
166.15 - 207.69 -
- - - -
EL/WL EL/WL
- - - - - -
8.48 27.8144 13.9072 8.48 27.8144 13.9072
- 234.18 - - 292.72 -
1B10 - 175.63 - 1B10 - 219.54 -
11.96 9.10 11.96 9.10
DL DL
- 75.73 - - 94.66 -
6.21 5.26 6.21 5.26
LL LL
- 39.22 - - 49.03 -
- - - -
EL/WL EL/WL
- - - - - -
6.80 22.3040 11.1520 6.80 22.3040 11.1520
- 229.54 - - 286.92 -
1B11 - 172.15 - 1B11 - 215.19 -
8.38 - 8.38 -
DL DL
- 74.21 - - 92.76 -
4.34 - 4.34 -
LL LL
- 38.46 - - 48.08 -
- - - -
EL/WL EL/WL
- - - - - -
10.78 35.3584 17.6792 10.78 35.3584 17.6792
- 414.81 - - 518.52 -
2B3 - 311.11 - 2B3 - 388.89 -
10.10 - 10.10 -
DL DL
- 48.98 - - 61.23 -
28.79 - 28.79 -
LL LL
- 139.61 - - 174.51 -
- - - -
EL/WL EL/WL
- - - - - -
6.00 19.6800 9.8400 6.00 19.6800 9.8400
- 943.97 - - 1,179.96 -
2B5 - 707.98 - 2B5 - 884.97 -
31.77 10.73 31.77 10.73
DL DL
- 295.49 - 369.36 -
19.19 6.82 19.19 6.82
LL LL
166.15 - 207.69 -
- - - -
EL/WL EL/WL
- - - - - -
8.48 27.8144 13.9072 8.48 27.8144 13.9072
- 737.37 - - 921.71 -
2B10 - 553.03 - 2B10 - 691.28 -
14.44 5.08 14.44 5.08
DL - 108.85 - DL - 136.06 -
26.86 14.45 26.86 14.45
LL LL
- 230.23 - - 287.79 -
- - - -
EL/WL EL/WL
- - - - - -
6.80 22.3040 11.1520 6.80 22.3040 11.1520
- - - - - -
5B1 - - - 5B1 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 355.89 - - 444.87 -
5B2 - 266.92 - 5B2 - 333.65 -
14.04 - 14.04 -
DL DL
- 86.09 - - 107.61 -
13.62 - 13.62 -
LL LL
- 83.49 - - 104.36 -
- - - -
EL/WL EL/WL
- - - - - -
7.46 24.4688 12.2344 7.46 24.4688 12.2344
- - - - - -
5B3 - - - 5B3 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5B4 - - - 5B4 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5B5 - - - 5B5 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5B6 - - - 5B6 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5B7 - - - 5B7 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 393.35 - - 491.68 -
5B8 - 295.01 - 5B8 - 368.76 -
12.88 7.04 12.88 7.04
DL DL
- 111.04 - - 138.80 -
7.37 6.82 7.37 6.82
LL LL
- 79.19 - - 98.99 -
- - - -
EL/WL EL/WL
- - - - - -
6.80 22.3040 11.1520 6.80 22.3040 11.1520
- - - - - -
5B9 - - - 5B9 - - -
- -
DL DL
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5G1 - - - 5G1 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- - - - - -
5G2 - - - 5G2 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 724.53 - - 905.66 -
8B2A - 543.40 - 8B2A - 679.25 -
21.21 - 21.21 -
DL DL
- 182.34 - - 227.93 -
19.09 - 19.09 -
LL LL
- 164.14 - - 205.18 -
- - - -
EL/WL EL/WL
- - - - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 739.90 - - 924.87 -
9B2 - 554.92 - 9B2 - 693.65 -
28.56 - 28.56 -
DL DL
- 245.49 - - 306.86 -
13.82 - 13.82 -
LL LL
- 118.80 - - 148.50 -
- - - -
EL/WL EL/WL
- - - - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
- 51.39 - - 64.23 -
SB1 - 38.54 - SB1 - 48.17 -
6.34 - 6.34 -
DL - 15.86 - DL - 19.83 -
3.69 - 3.69 -
LL LL
- 9.23 - - 11.54 -
- - - -
EL/WL EL/WL
- - - - - -
3.30 10.8240 5.4120 3.30 10.8240 5.4120
- 529.22 - - 529.22 -
CB1 - 396.91 - CB1 - 396.91 -
21.43 24.56 22.24 22.24
DL DL
178.64 - 178.64 -
10.45 10.85 10.27 10.27
LL LL
82.46 - 82.46 -
- -
EL/WL EL/WL - - -
2.45 8.0360 4.0180 2.45 8.0360 4.0180
- 626.03 - - 626.03 -
CB2 - 469.52 - CB2 - 469.52 -
29.14 31.96 29.86 29.86
DL DL
215.38 - 215.38 -
13.17 13.53 13.06 13.06
LL 94.20 LL - 94.20 -
- -
EL/WL EL/WL - - -
2.20 7.2160 3.6080 2.20 7.2160 3.6080
- 139.19 - - 139.19 -
CB3 - 104.39 - CB3 - 104.39 -
14.93 16.40 14.93 14.93
DL DL
53.83 - 53.83 -
4.85 5.04 4.46 4.46
LL LL
16.05 - 16.05 -
- -
EL/WL EL/WL - - -
1.10 3.6080 1.8040 1.10 3.6080 1.8040
- 105.24 - - 105.24 -
CB4 - 78.93 - CB4 - 78.93 -
5.40 6.87 11.22 11.22
DL 40.44 DL - 40.44 -
1.10 1.29 3.43 3.43
LL LL
12.35 - 12.35 -
- -
EL/WL EL/WL - - -
1.10 3.6080 1.8040 1.10 3.6080 1.8040
- 247.85 - - 309.82 -
WB1 - 185.89 - WB1 - 232.36 -
10.97 - 10.97 -
DL DL
- 33.55 - - 41.94 -
26.12 - 26.12 -
LL LL
- 79.89 - - 99.86 -
- - - -
EL/WL EL/WL
- - - - - -
3.73 12.2344 6.1172 3.73 12.2344 6.1172
- 3,226.92 - - 4,033.65 -
WB2 - 2,420.19 - WB2 - 3,025.24 -
52.06 20.70 52.06 20.70
DL DL
- 557.80 - - 697.25 -
85.88 49.84 85.88 49.84
LL LL
- 940.48 - - 1,175.60 -
- - - -
EL/WL EL/WL
- - - - - -
12.60 41.3280 20.6640 12.60 41.3280 20.6640
907.50 750.84 907.50 1,134.37 938.55 1,134.37
WB3 1,069.92 563.13 1,069.92 WB3 1,240.07 703.92 1,240.07
34.60 15.20 34.60 15.20
DL DL
158.76 131.37 158.76 198.45 164.21 198.45
55.04 31.87 55.04 31.87
LL LL
262.93 217.53 262.93 328.66 271.91 328.66
14.14 14.14 14.14 14.14
EL/WL EL/WL
204.70 - 204.70 204.70 - 204.70
8.10 26.5680 13.2840 8.10 26.5680 13.2840
- 2,418.91 - - 3,023.64 -
WG1 504.35 1,814.18 504.35 WG1 504.35 2,267.73 504.35
53.06 32.14 53.06 32.14
DL DL
- 550.75 - - 688.44 -
53.03 53.03 53.03 53.03
LL LL
- 595.77 - - 744.71 -
18.67 18.67 18.67 18.67
EL/WL EL/WL
265.20 - 265.20 265.20 - 265.20
11.06 36.2768 18.1384 11.06 36.2768 18.1384
- - - - - -
TB2 - - - TB2 - - -
- -
DL DL - - -
- -
LL LL - - -
- -
EL/WL EL/WL - - -
10.46 34.3088 17.1544 10.46 34.3088 17.1544
PT & ADJACENT BEAMS RELEASED
SIMPLY SUPPORTED
- - -
1B1 292.08 - 292.08
DL
LL
16.42 16.42
EL/WL 153.58 - 153.58
7.00 22.9600 11.4800
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 10 @ 5 , 4 @ 10 Conventional
-
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Post-Tension
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 16 mm 4 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 8 - 20 mm 2 - 20 mm 8 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 16 mm 2 - 16 mm 5 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 20 mm 2 - 20 mm 3 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 20 mm 8 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 3 - 25 mm 7 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 25 mm 8 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 20 mm 8 - 20 mm 3 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 5 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 16 mm 4 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 5 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 2 - 20 mm 2 - 20 mm 2 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 4 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 6 - 25 mm 2 - 25 mm 6 - 25 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 3 - 25 mm 7 - 25 mm 3 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 20 mm 2 - 20 mm 7 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 6 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 20 mm 2 - 20 mm 4 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 5 - 20 mm 2 - 20 mm 5 - 20 mm 12 @ 5 , 4 @ 10 Conventional
2 - 16mm
bottom 2 - 20 mm 3 - 20 mm 2 - 20 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 10 @ 5 , 4 @ 10 Conventional
-
bottom 2 - 16 mm 3 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
Page 24 of 36
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
: PROPOSED COMMERCIAL
LEFT
BUILDING
SUPPORT MIDSPAN
: PROPOSED COMMERCIAL BUILDING STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB1 35 65 10.00 2 - 16mm
bottom 8 - 25 mm 3 - 25 mm 8 - 25 mm rest @ 30 cm O.C. Beam
top 16 - 25 mm 2 - 25 mm 16 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB2 40 80 10.00 2 - 16mm
bottom 12 - 25 mm 4 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB3 40 75 10.00 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 16 - 25 mm 2 - 25 mm 16 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB4 40 85 10.00 2 - 16mm
bottom 12 - 25 mm 4 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 9 - 25 mm 2 - 25 mm 9 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB5 35 65 10.00 2 - 16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB6 40 70 10.00 2 - 16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 10 @ 5 , 6 @ 10 Conventional
TB7 30 50 10.00 2 - 16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 8 - 25 mm 2 - 25 mm 8 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB8 30 60 9.50 2 - 16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 2 - 25 mm 7 - 25 mm 12 @ 5 , 6 @ 10 Conventional
TB9 30 60 10.50 2 - 16mm
bottom 7 - 25 mm 3 - 25 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 2 - 25 mm 10 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB9A 35 70 10.50 2 - 16mm
bottom 9 - 25 mm 3 - 25 mm 9 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 2 - 25 mm 12 - 25 mm 14 @ 5 , 6 @ 10 Conventional
TB10 40 70 10.50 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 14 - 25 mm 2 - 25 mm 14 - 25 mm 16 @ 5 , 6 @ 10 Conventional
TB10A 40 75 10.50 2 - 16mm
bottom 12 - 25 mm 3 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
Page 25 of 36
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 16mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 4-legs )
top 7 - 25 mm 22 - 25 mm 7 - 25 mm 18 @ 5 , 6 @ 10 , 5 @ 18 Conventional
FTB1 50 95 12.00 4 - 16mm
bottom 7 - 25 mm 5 - 32 mm 7 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 30 - 25 mm 10 - 25 mm 22 @ 5 , 6 @ 10 , 5 @ 16 Conventional
FTB2 60 115 12.00 4 - 16mm
bottom 10 - 25 mm 6 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 30 - 25 mm 10 - 25 mm 32 @ 5 , 7 @ 8 , 5 @ 15 Conventional
FTB3 60 115 12.00 4 - 16mm
bottom 10 - 25 mm 5 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
top 12 - 25 mm 24 - 25 mm 12 - 25 mm 30 @ 5 , 7 @ 9 , 5 @ 18 Conventional
FTB4 50 110 12.00 4 - 16mm
bottom 12 - 25 mm 6 - 25 mm 12 - 25 mm rest @ 30 cm O.C. Beam
top 10 - 25 mm 24 - 25 mm 10 - 25 mm 30 @ 5 , 6 @ 10 , 5 @ 18 Conventional
FTB5 50 100 12.00 4 - 16mm
bottom 10 - 25 mm 7 - 25 mm 10 - 25 mm rest @ 30 cm O.C. Beam
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 12mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) (2-legs)
top 5 - 25 mm 3 - 25 mm 5 - 25 mm 12 @ 5 , 5 @ 10 Conventional
TB1 30 55 5.63 2-12mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
top 6 - 20 mm 2 - 20 mm 6 - 20 mm 10 @ 5 , 4 @ 10 Conventional
TB2 25 50 8.58 -
bottom 4 - 20 mm 4 - 20 mm 4 - 20 mm rest @ 30 cm O.C. Beam
top 7 - 25 mm 3 - 25 mm 7 - 25 mm 12 @ 5 , 5 @ 10 Conventional
TB3 35 60 8.58 2-16mm
bottom 5 - 25 mm 3 - 25 mm 5 - 25 mm rest @ 30 cm O.C. Beam
Page 27 of 36
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
COLUMN WIDTH (cm) DEPTH (cm) AREA NO. OF BAR AREA
REMARKS
DESIGNATION ( X-X ) ( Y-Y ) REQUIRED BARS DIAMETER SUPPLIED
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 12 25 9.130 Fail
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 6.758 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 10 25 7.609 Fail
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
1C1 40 40 10.000 14 25 10.652 Safe
Page 28 of 36
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
Page 29 of 36
PROJECT : PROPOSED COMMERCIAL BUILDING
LOCATION : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
OWNER : MR. ALLAN STEVE YU
ARCHITECT : MANUEL A. GUANZON
CF2:
C5+C6 C9+C10 C9+C10 C5+C6 C5+C5 FOOTING
DL 169.94 338.48 292.08 165.99 52.18 656.78
LL 71.27 194.09 168.42 77.87 14.18
EL - - -
TOTAL 241.21 532.57 460.50 243.86 66.36 656.78
2,201.28
0.989
Project : PROPOSED COMMERCIAL BUILDING
Location : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
Owner : MR. ALLAN STEVE YU
Architect : MANUEL A. GUANZON
Page 32 of 36
PROJECT : PROPOSED COMMERCIAL BUILDING
LOCATION : LEON KILAT COR. SANCIANGCO STS., CEBU CITY
OWNER : MR. ALLAN STEVE YU
ARCHITECT : MANUEL A. GUANZON
BEAM LOADING:
SIZE OF PI
BEAM JOINT # DL LL EL TOTAL PU PU (EL) N PILES WIDTH
3.6 6,726.23
3.6 7,962.77
3.6 6,650.51
3.6 7,538.92
4.5 7,131.06
3.6 7,825.05
3.6 6,892.68
3.6 7,692.21
2.7 7,200.10
4.5 7,616.52