Analysis Capacity for hang of scaffold

For 3 bay to 1 lift


Assuming Design Reference from BS 1139
Project Name : Electrigication of Upgrading P7 Finish Mill Grinding Systems
Date : 8 September 2017

Model Structure for 3 bay 1 lift

Brace Standard
hanging

Swivel Clamp

Story Height Ledger


h1 = 2000
Platform

L= 4500

View Section

Data Materials (According to BS 1139, Design and Spesification Scaffold)


1. Pipe with OD 48,3 mm
2. Width of pipe inside is 4 mm
3. Capacitiy each pipe 18,4 kg/m2
4. Weight of pipe (each 6 meter) is 28 kg
5. Using medium duty scaffolding with capacity /bay is 450 kg

Input Data Analysis for 3 bay


Pcs Kg Total
A. Dead Load (Member of scaffold)
1. Standard with 2500 mm : 8 x 10 = 80 Kg
2. Brace with length 5000 mm : 2 x 23 = 46 Kg
3. Ledger with length 5000 mm : 8 x 23 = 184 Kg
4. Transom with length 950 mm : 7 x 4 = 28 Kg
5. Swivel Clamp : 32 x 0,71 = 22,72 Kg
6. Ashiba with size 2,5 m x 0,6 m : 6 x 3 = 18 Kg
Total DL = 378,72 Kg

B. Live Load
1. Workers : 2 x 75 = 150 Kg
2. Construction debris and material : Assume = 100 Kg
Total LL = 250 Kg
Grand Total (DL + LL) = 628,72 Kg

Check Capacity Scaffolding

Total load for 1 bay = 628,72 = 209,573 < 450 Kg/bay


3 (Ok..... Structure is sufficient)
SF = 2,15 > 1,5
(Ok..... Structure is sufficient)