Professional Documents
Culture Documents
Space Transportation
Systems Division
FIRST
AMERICAN
SPACE SHUTTLE
PROGRAM
(NSTS)
INTEGRATED SPACE PLAN
(Preliminary)
INTERNATIONAL RMS
GENERATION EXPENDABLE LAUNCH
VEHICLE FLEET
(INTERNATIONAL)
OF IUS
VEHICLE
UNITED STATES LAUNCH VEHICLE CAPABILITES
# TO LEO # TO GEO GEO-CIRCULAR FIRST FLIGHT
REUSABLE SPACECRAFT PRIVATE LAUNCH VERSION 1.1 FEBRUARY, 1989
VEHICLES
ALS 200,000 1998 * THE AMERICAN SPACE SHUTTLE (ELVS) EMU
SHUTTLE C 150,000
SPACE 55,000
20,000 (CENTAUR)
5,500 (IUS)
1994
1981
1983 * CHALLENGER OV-099 1983 PRODUCED BY RONALD M. JONES D/385-210
SHUTTLE 6,500 (TOS) * COLUMBIA OV-102 ABOUT THIS DIAGRAM:
TITAN 4 40,000 12,500 10,000 (CENTAUR) 1989 * DISCOVERY OV-103 GOVERNMENT - The Rockwell Integrated Space Plan (ISP) is a very long range systematic perspective of Americas and the
MMU
TITAN 3 33,000 8,600 4,200 (IUS) 1965 * ATLANTIS OV-104 COMMERCIAL SATELLITE EARTH-TO-ORBIT Western Worlds space program. Its 100-plus-year vision was created from the integration of numerous NASA
ATLAS 2 14,400 5,200 2,500 1991 * TBD OV-105 long-range studies including the project Pathnder case studies, recommendations from the National
DEPLOYMENT
ATLAS 1 12,300 1959 AND IN-SPACE Commission on Spaces report to the President, the Ride report to the NASA Administrator, and the new
DELTA 2 11,100 3,190 1,350 (PAM-D) 1988 * THE SOVIET SPACE SHUTTLE SATELLITE RETRIEVAL
TRANSPORTATION SYSTEMS National Space Policy Directive. Special initiatives such as the four Pathnder scenarios or those described in
DELTA 7,800 1960 AND SERVICING
* BURAN the Ride Report (i.e., Mission To Planet Earth, Exploration of the Solar System, Outpost on the Moon, and
TITAN 2 5,500 1965 DEFENSE SATELLITES
SCOUT 475 1961 Humans to Mars) are integral parts of the ISP. These initiatives as well as the agenda described in the National
VOYAGER II SOLAR MAX / Commision on Space report, are shown by shading the appropriate boxes involved. These shaded versions are
ARIANE 3
MID-SIZE PAYLOADS
URANUS ENCOUNTER included separately as attachments to the ISP. The ISP is not meant to be a denitive plan for the development
LAUNCH VEHICLES OF EUROPE AND JAPAN
SPACE SHUTTLE ENHANCEMENTS, SPACE TELESCOPE
PLANETARY / SCIENTIFIC MISSION TYPES of space, but rather a compilation of evolutionary opportunities for our near-term and long-range space
VEHICLE # TO LEO # TO GEO COUNTRY FIRST FLIGHT
INTERNATIONAL COMPETITION, MISSIONS activities.
PRECURSOR ARIANE 4
ARIANE 3 5,690 EUROPE 1984 AN INVIGORATED ELV FLEET The ISP can be read from top to bottom or left to right. From top to bottom, vertical column elements are
ARIANE 4 9,260 EUROPE 1988
ROBOTIC SPACELAB SATELLITE REFUELING TITAN 2 phased in chronologically to support centerline milestones. Reading across the columns from left to right will
ARIANE 5 46,000 14,960 EUROPE 1996 EXPLORATION AND U.S. NATIONAL POLICY (INTERNATIONAL) CAPABILITY yield the total scope of required activity within a given time period in support of the total integrated plan.
H-1 2,300 JAPAN 1986 SPUR SPACE RECOVERY NSTS The centerline of the ISP is the critical path dened by National Space Policy which closely resembles the
H-2 9,000 JAPAN 1992
1988 GPS
CONSTELLATION
1988
TDRS
CONSTELLATION
SUBORBITAL
RETURN-TO-FLIGHT NASA Ofce of Exploration case study 4 scenario Lunar Outpost To Early Mars Evolution. The Space
Shuttle and Space Station are essential initial elements; their value increases through the 1990s as
LOFT-1 / EPRIME infrastructure evolves. Arrowed lines between boxes depict evolutionary, supporting, or synergistic
ABUNDANT NEAR-EARTH EXTRATERRESTRIAL RESOURCES SOVIET PHOBOS PAYLOAD MARKET relationships. Double-arrowed lines between boxes are communication / data links. Bold lines are trunk lines
RESOURCE MOON
PHOBOS/
ASTEROIDS* COMETS
ELEMENT
ENCOUNTER EXTENDED OV-105
CONTRACT AWARD
DELTA 2 (MLV-1) with numerous (2 or more) branches stemming from along their length. Boxes with bold outlines are either
DEIMOS NAME long-range (centerline) objectives or key enabling programs important because their development affects the
Al X ALUMINUM MAGELLAN DURATION ORBITER HUBBLE TITAN 3 / 34D development of many other programs. Boxes with double lines are in-space transportation nodes. The ISP is
C X C X CARBON SPACE TELESCOPE
Ca X CALCIUM AND COMMERCIAL SPACE FACILITIES IN-SPACE TITAN 4
chronologically portrayed in ve year time intervals because this is a practical segment of time for planning
and implementation of program objectives. Obviously, the dates shown have an uncertainty which increases
VOYAGER II SPACEHAB
Fe X M IRON
H X C X HYDROGEN
NEPTUNE ARE WESTERN PRECURSORS RESEARCH & STARFIRE / SSI
with time, but the chronology is intended to be consistent. Finally, the large bubbles represent the synergistic
SUBORBITAL ET summation of the individual elements of that period. They are the highest level groups of goals: plateaus of
He3 X HELIUM 3
TO DEVELOPMENT
SMALL PAYLOADS
APPLICATIONS human achievement attainable through a comprehensive execution of the depicted ISP elements.
Mg X MAGNESIUM GALILEO ILV-1 / AMROC
GRO
N
Ni X
X C
M
X NITROGEN
NICKEL
ULYSSES
PERMANENT EDO PV-105
PEGASUS / OSC
DELIVERY
O
Si X
X C X OXYGEN
SILICON (INTERNATIONAL) HUMAN PRESENCE CDSF
MID-SIZE PAYLOAD
MARKET ATLAS 2 (MLV-2)
ROCKWELL INTERNATIONAL
Space Transportation Systems Division
Ti
H2O ? X C X
TITANIUM
WATER MARS IN SPACE OV-106 TETHERED JAPANESE H-2 HLC
12214 Lakewood Blvd.
Downey, California 90241
* METALLIC=M OBSERVER EVOLVABLE OMV
1993 CARBONACEOUS=C * THE SOVIET SPACE STATION FREEDOM 1993
CONTRACT AWARD ? SYSTEMS / TSS
ADVANCED SECOND Attn: Ed Repic, Project Manager
Lunar and Planetary Systems
1993
SOURCE SRB / LRB
LEO ET RESOURCE BASE SOLAR SAIL ELV DEPLOYMENT Mail Code AD21 LEGEND
DEMONSTRATION POSSIBLITY * THE SOVIET SPACE STATION MIR ET / ACC MISSION TO PLANET LIGHTSAT CLASS
ELEMENT EARTH - ELEMENT PAYLOAD MARKET ISP Program Element
RESOURCE LBS/TANK & DATA INTEGRATION NASAS SHUTTLE C /
NAME EVOLVABLE OTV Key Enabling Program
CRAF HEO AND SHUTTLE DERIVED
SPACEHAB APPLICATIONS
Al 56,490 (not on the critical path)
ET / ACC APPLICATIONS
INTERNATIONAL SPACEPORT
COMET SAMPLE LUNAR PILOTED VEHICLE (LOS/F) SHUTTLE II
DEPLOYMENT * TITAN 4
RETURN MISSION
PAYOFFS FROM
2008
EXCURSIONS ROVER ON LUNAR SURFACE
PROPULSION ELEMENT NEAR-EARTH (EARTH-MOON)
SOLAR SAIL
ASTRONOMICAL AND
LUNAR UNIQUE SCIENCE
THE JAPANESE
SSTO ROUTINE
MPV AND MLL
TRANSFER ELEMENTS
ASTEROID EXPLORER
CIVILIZATION VOLUME INTENSIVE
PRESSURIZED HANGER
MMW FISSION /
SOLAR POWER
SOLAR ENERGY FARM /
AUTOMATED COLLECTOR
AEROSPACE PLANE
ACCESS TO
ASSEMBLY CAPABILITY FRACTIONAL G BIO- INTERNATIONAL
MARS CREW SORTIE
OUTER PLANETS
FLYBY / PROBES
COMMERCIAL MANNED
GEO COMMUNICATIONS
ADVANCED LIFE
MEDICAL RESEARCH LAB LUNAR BASE
MANUFACTURING ?
IN-SPACE RESCUE SPACE
VEHICLE EXPANDED LUNAR
PLATFORMS
SUPPORT RESEARCH VIVARIUM OUTPOST INCREASED
SOLAR ELECTRIC
GRID CONSTRUCTION
CAPABILITY
ACHIEVED
IN-SPACE RESCUE
INTEGRATED MARS LUNAR SURFACE
TRANSFER VEHICLE INCREASED CAPACITY MOBILITY MASS-CATCHER
EARTH MOVING, MINING, POLAR ORBIT
POTV LLOX PRODUCTION & * MID-RANGE & LOW-THRUST TUG
AND TUNNELING SPACE STATION * IN-SPACE RESCUE
CRYO STORAGE FACILITY * LONG-RANGE
LEO ASSEMBLY
EVOLVES TO EXPLOIT ENCLOSED ECLS
ATVS / ROVERS
OPERATIONS ORBITAL, L2 OR HIGH LUNAR POLAR ORBIT ? STRUCTURE ASSEMBLY
CAPABILITY
MARTIAN CYCLING LLOX TO LLO LUNAR LEO LUNAR MASS-CATCHER
SPACESHIP PROPELLANT TANKER
ORE EXTRACTION AND INTERNATIONAL MASS-DRIVER - SDI / SPACE STATION
ELEMENT INTEGRATION REGOLITH PROCESSING SPACEPORT MAINTENANCE / ELECTROMAGNETIC RADIATION SHIELDING
Al,Ca,Fe,Mg,Si,Ti,(He3,Ni) EXPANDED SPACE STATION SHOP FACILITY LAUNCHER
* GOVERNMENT
2013 TRANSFER TO L1 EXTRATERRESTRIAL 2013 THIN-FOIL SOLAR DOD EARTH- INDEMNIFICATION 2013
STV SUPPORT
HABITATION AND
NEAR-EARTH-ORBIT
ASTEROID / COMET
EXPLOITATION
ASTEROIDS-- DEFINITIONS,
ABBREVIATIONS AND ACRONYMS
LEO SPACE STATION
EMERGENCE OF POLAR REGION RESEARCH MODULES
IDV APPLICATIONS
EXPLORATION
Ad Astra To the Stars (Latin)
ALL TERRAIN MPR ALS Advanced Launch System
MARTIAN
SPACEFARING CIVILIZATION SPACEPORT
EXPANDED PHOBOS
FACILITY
TRANSPORTATION
GEOPHYSICAL /
ENHANCED SSPS-
UNLIMITED AMROC
ATV
AU
American Rocket Company
All Terrain Vehicle
Astronomical Unit- 1 AU = 93,000,000 miles
TAU METEOROLOGICAL
HEDM
CHEMICAL
PROPULSION
1000 A.U.
UNMANNED PROBE
MARS-MAINBELT
MOBILITY
VEHICLE
ADVANCED
LASER
COMM NETWORK MAINBELT ASTEROID
STATIONS
MAINTENANCE /
EARTH ENVIRONMENTAL
PATHFINDER SAFE AXAF
CDSF
CELSS
Cislunar
Advanced X-ray Astrophysics Facility
Commercially Developed Space Facility
Controlled Ecological Life Support System
The space between the Earth and Moon
2028
EARTH-MARS
EXPLORATION
ATTACH MDRE
2028
SHOP FACILITY
SOLAR CIT
COMM
COMSAT
Circumstellar Imaging Telescope
Communications
Communication Satellite
2028
SOLAR SAIL
ENERGY
CRAF Comet Rendezvous / Asteroid Flyby
XPORT SYSTEM OPERATIONAL DOD Department of Defense
MAINBELT MARS ECLSS Environmental Control and Life Support System
INITIATE EARTH-VENUS ASTEROID BASE MAINBELT ASTEROID
SOLAR ECO Ecological
ORBIT CHANGE /
CYCLING SPACESHIP
TRANSPORTATION
SYSTEM
FIRST MANNED
VENUS
FLYBY
VENUS ORBITING
COMSATS
DEPLOYED
ORBIT CHANGE
LOX PRODUCTION
AND CRYO
CLOSED-LOOP
EXPLOITATION CONCENTRATOR
FACILITY FOR ECV
EDO
ELV
Electric Cargo Vehicle (OEXP)
Extended Duration Orbiter
Expendable Launch Vehicle
LIFE SUPPORT EMU Extravehicular Mobility Units
STORAGE FACILITY
LARGE PRESSURIZED
SPACE SETTLEMENT EARTH ? ERT Earth Resources Technology
ANTIMATTER-ENRICHED
PROPELLENT
HUMANITY VENUS
EXPLORATION,
ANALYSIS AND
CARBON
MONOXIDE FUEL
ASSEMBLY VOLUMES ESTABLISHMENT
ESA
ET
ET/ACC
ETO
European Space Agency
External Tank
External Tank / Aft Cargo Carrier
Earth-To-Orbit
PROPULSION GREEN HOUSE /
TRANSFORMATION PRODUCTION AND FOOD PRODUCTION FTS Flight Telerobotic Servicer
STORAGE L4 / L5 G Gravity
EARTH-VENUS ACTIVITIES Gaia Earths self-sustaining biosphere
MEDICAL INITIATE EARTH-MOON
SOLAR SAIL CARGO GEO Geosynchronous-Earth-Orbit
2033 BEGINS XPORT SYSTEM
EXTENDED
EXPLORATION 2033
FACILITY
INDIGENOUS
LIBRATION POINT
HABITAT
CONSTRUCTION
GPS
GRO
HEDM
Global Positioning Satellite
Gamma Ray Observatory
High Energy-Density Matter
2033
ADVANCED RESOURCE
HEO High-Earth-Orbit
TECHNOLOGY CONSTRUCTION
GLOBAL HLC Heavy Lift Capability
VENUS ORBITING HLV Heavy Lift Vehicle
TRANSPORTATION EXPANDING HEO
SPACE STATION HOTOL Horizontal Take-off and Landing
INDUSTRIAL
THE TRANSITION VENUS ORBITING
CAPABILITY
MULTIPLE
SCIENTIFIC
OUTPOSTS
CAPABILITY IDV
ILV
In-situ
Interlibrational Derived Vehicle
Industrial Launch Vehicle
In place (Latin)
VENUS PROXIMITY
SOLAR POWER IUS Inertial Upper Stage
IDV
STATION IUV Interlibrational Utility Vehicle
SELF-SUPPORTING GAIA L1
L2
Lagrange Point # 1 35,000 Miles Above Moon
Lagrange Point # 2 40,000 Miles Behind Moon
HUMAN OUTER
SOLAR SYSTEM
FROM A DIVERSION OF
ASTEROIDAL MATERIAL
MARS
BASE
DIVERSION OF
ASTEROIDAL MATERIAL
TO POLAR ORBIT
L4
L5
LBS
Lagrange Point # 4 240,000 Mile Earth Orbit
Lagrange Point # 5 240,000 Mile Earth Orbit
Pounds
EXPLORATION BEGINS- POLAR ORBITING LCL Lunar Cargo Lander (OEXP)
PROPELLANT TO VENUS RESOURCE
JUPITER AND ITS ENVIRONMENTAL LDF Large Deployable Reector
DEPOT EXTRACTION OBSERVATION
2038
JOVIAN SATELLITES
2038
PLATFORMS
PROLIFERATES METALLIC ASTEROID
LEO
LLO
Low-Earth-Orbit
Low-Lunar-Orbit 2038
TERRESTRIAL BALLOONBORNE
RECONFIGURATION-
PLANETOID FORMING
LLOX
LOFT
Lunar Liquid Oxygen
Launch Operations Flight Test
INTERPLANETARY SPACEPORT DEPARTURE
EXPANSION
SMALL MARTIAN SL Space Launch
INITIATE SETTLEMENTS SLC Space Launch Complex
L4 / L5
ROTATION PROLIFERATE SPS Solar Power Satellite
MULTIPLE
PROGRAM GIANT PARASOL SRB Solid Rocket Booster
NUCLEAR-PULSED SETTLEMENT
EMPLACEMENT OR EXPANDING L4 / L5 SSI Space Services Incorporated
PROPULSION CONSTRUCTION
INITIATE ATMOSPHERIC INDUSTRIAL SOCIETY SSPS Satellite Solar Power Station
(ORION CONCEPT)
MICROBIOLOGICAL SSTO Single-Stage-To-Orbit
STV Space Transfer Vehicle
VENUS
ENGINEERING PROCESS
2100
NEPTUNE / PLUTO
2100
INDEPENDENT
SPACEFARING
COSMOS Vivarium
XFER
XPORT
Plant and animal research laboratory
Transfer
Transport 2100
HUMAN
COMMUNITIES TEN BEST CANDIDATE STARS
EARTH SKYHOOK FOR INTERSTELLAR EXPLORATION
PRECURSORS
BEGINS STAR DISTANCE VISUAL LUMINOSITY SPECTRAL
LIGHT-YEARS MAGNITUDE (SUN=1.0) TYPE
STATIONARY Tau Ceti 11.8 3.5 .4 G8
HUMAN Special Thanks to Paul Turner D/299-308 82 Eridani 20.3 4.3 .7 G5
MARTIAN INTERSTELLAR Jonathan V. Post D/282/200 and J. David Ray D/286-201
INTERSTELLAR SKYHOOK Zeta Tucanae 23.3 4.2 .9 G2
TRAVEL TRAVERSING Very Special Thanks to Robert A. Weaver D/286-001, 107 Piscium 24.3 5.2 .4 K1
LARGE SCALE WORLD SHIPS William S. Trueman D/286-204, Ernest L. Freddolino D/282-100, Alpha Mensae 28.3 5.1 .6 G5
HUMAN HABITATION Edward M. Repic D/385-400, Sherry D. Lowrey McDonnell Douglas, 54 Piscium 34.0 5.9 .4 K0
OF MARS Charles L. Stone D/282-200, Richard A. Robitaille D/286-500, Zeta 1 Reticuli 37.0 5.5 .7 G2
the entire 286-204 Data Engineering Team, Zeta 2 Reticuli 37.0 5.2 .9 G2
the entire Lunar and Planetary Missions Analysis Team and Gliese 86 37.0 6.1 .4 K0
R. Fred Pfost who said Do it. Gliese 67 38.0 5.0 1.2 G2
AD ASTRA AD ASTRA