You are on page 1of 1

GRAPHIC SCALE IN METERS: LEVEL INDICATION:

0 1 5 SECTION PLAN

UE
FACADE FRONT-ELEVATION

TR
AT AXIS A PLANT

1. PLANT SURVEY INFORMATION:


0 1 2 3 4 5 6 7 7a 8 9 10 11 12 13 14 15 15a 16 17 18 19 20 21
PLANT LOCAL ± 0.000 (ZERO) IS EQUAL TO 533.00 METERS (masl)
ALL PLANT LEVELS SHOWN ARE LOCAL PLANT LEVELS.

2. DRAWING DIMENSIONING AND LEVEL INDICATION:


ALL UNITS IN mm IF NOTHING ELSE IS MENTIONED.
ALL LEVELS IN METERS IF NOTHING ELSE IS MENTIONED

PLATFORM NOTES:
FOR CHILLER
SMOKE SMOKE SMOKE SMOKE 1: MV AND MAIN LV POWER CABLES ARE MOUNTED ON CABLE LADDERS. ALL OTHERS ON CABLE TRAYS.
ESCAPE ESCAPE ESCAPE ESCAPE 2: WALL DUCT SIZES FOR SMALL AUXILIARY SERVICE PIPES TO BE CONFIRMED BEFORE PLACING.
3: FINAL LOCATIONS AND DIMENSIONS OF RECESSES AND OPENINGS TO BE CONFIRMED BY
CORRESPONDING SUPPLIERS (E.G. ELECTRICAL, HVAC, AUXILIARY UTILITIES).
4: AUTOMATIC SPRINKLER SYSTEM IS COMPLYING WITH NFPA 13.

TANKING:

EMERGENCY EMERGENCY EMERGENCY


EXIT EXIT EXIT

ROAD ROAD ROAD

EXHAUST
AIR
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EMERGENCY
EXIT
EXHAUST
AIR
EXHAUST
AIR
EARTHING:
1. WELDED STEEL WIRE FABRIC (FLAT GRID GALVANIZED) TO BE LAID INSIDE THE SCREED AND INTERCONNECTED
WITH THE FOUNDATION GROUNDING. FOR DETAIL LOCATION REFER TO SCHEDULE OF FINISHES.

2. EARTHING DETAILS OF SPECIFICATION "11-YE90-D-603, PUMP STATION EARTHING SYSTEM, EARTHING DETAIL
CABLE DUCT TO CABLE DUCT TO CABLE DUCT TO CATALOGUE ", HAVE TO BE CONSIDERED.
VSD BUILDING MAIN PUMP HOUSE MAIN PUMP HOUSE

LEGEND:
STRUCTURE:
REINFORCED CONCRETE PRECAST CONCRETE SANDWICH PANEL

REINFORCED PRECAST CONCRETE STRUCTURE PRECAST ROOF SLABS

CONCRETE / SUB - BASE COURSE MASONRY / BLOCKWORK

GRAVEL

SERVICE PIPES:

FIRE WATER / SPRINKLER LINE WASTE WATER

POTABLE WATER SEWAGE WATER

FACADE REAR-ELEVATION AT AXIS D GULLY WITH SIPHON


AND BACKFLOW PREVENTER

21 20 19 18 17 16 15a 15 14 13 12 11 10 9 8 7a 7 6 5 4 3 2 1 0 HVAC:

SUPPLY AIR RETURN AIR FRESH AIR EXHAUST AIR

LIGHTING FIXTURES FIRE FIGHTING & EMERGENCY EQUIPMENT

SMOKE SMOKE SMOKE SMOKE


ESCAPE ESCAPE ESCAPE ESCAPE

E-SYMBOLS COMMUNICATION
EMERGENCY EMERGENCY
EXIT EXIT

EMERGENCY
SUPPLY AIR SPRINKLER RELEASE SUPPLY AIR SUPPLY AIR SPRINKLER RELEASE
FAN 3 STATION
ACCU UNIT 1B ACCU UNIT 1A FAN 2
EXIT
FAN 1 STATION
TRANSFORMER 2 TRANSFORMER 1

REFERENCE DRAWING:
DRAWING No. TITLE

ENGINEER'S STAMP: CONTRACTOR'S STAMP:

FACADE SIDE-ELEVATION FACADE SIDE-ELEVATION


AT AXIS 21 AT AXIS 0
A B C D D C B A

REV. ISSUED FOR BY CHECKED APPROVED DATE

SMOKE SMOKE
ESCAPE ESCAPE
KINGDOM OF SAUDI ARABIA

SALINE WATER CONVERSION CORPORATION (SWCC)

Project No.
20407 SHUQAIQ WATER TRANSMISSION SYSTEMS - PHASE 3

ENGINEER
ROAD ROAD

CONTRACTOR

CABLE DUCTS TO VSD BUILDINGS


SHUQAIQ PHASE-3 WTS
SCALE
PS2, ELECTRICAL BUILDING
FACADES

1:100 DRAWING NO. SHEET REV.

C 2 2 - Z G 2 0 - S - 7 0 1 8 6/8 A
SUB-
CONTRACTOR FINAL ENGINEERING: IBG Ltd.