Professional Documents
Culture Documents
0 1 5 SECTION PLAN
UE
TR
PLANT
RECESS AND OPENINGS AT MAIN FLOOR 2. DRAWING DIMENSIONING AND LEVEL INDICATION:
ALL UNITS IN mm IF NOTHING ELSE IS MENTIONED.
ALL LEVELS IN METERS IF NOTHING ELSE IS MENTIONED
0 1 2 3 4 5 6 7 7a 8 9 10 11 12 13 14 15 15a 16 17 18 19 20 21
NOTES:
1: MV AND MAIN LV POWER CABLES ARE MOUNTED ON CABLE LADDERS. ALL OTHERS ON CABLE TRAYS.
2: WALL DUCT SIZES FOR SMALL AUXILIARY SERVICE PIPES TO BE CONFIRMED BEFORE PLACING.
3: FINAL LOCATIONS AND DIMENSIONS OF RECESSES AND OPENINGS TO BE CONFIRMED BY
CORRESPONDING SUPPLIERS (E.G. ELECTRICAL, HVAC, AUXILIARY UTILITIES).
4: AUTOMATIC SPRINKLER SYSTEM IS COMPLYING WITH NFPA 13.
TANKING:
D 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 EARTHING:
CORRIDOR 1. WELDED STEEL WIRE FABRIC (FLAT GRID GALVANIZED) TO BE LAID INSIDE THE SCREED AND INTERCONNECTED
WITH THE FOUNDATION GROUNDING. FOR DETAIL LOCATION REFER TO SCHEDULE OF FINISHES.
STAIRCASE HVAC ROOM
2. EARTHING DETAILS OF SPECIFICATION "11-YE90-D-603, PUMP STATION EARTHING SYSTEM, EARTHING DETAIL
STORAGE MEETING
LV ROOM CATALOGUE ", HAVE TO BE CONSIDERED.
2 1 2 1 2 1 2 1
ROOM
LEGEND:
STRUCTURE:
1 1 1 1 1 1 1 1 REINFORCED CONCRETE PRECAST CONCRETE SANDWICH PANEL
C 2 2 2 REINFORCED PRECAST CONCRETE STRUCTURE PRECAST ROOF SLABS
2 2
VSD VSD VSD VSD CORRIDOR CONCRETE / SUB - BASE COURSE MASONRY / BLOCKWORK
ROOM 1 ROOM 2 ROOM 3 ROOM 4 CORRIDOR
GRAVEL
2 2
B
1 1 2 1 1 1 1 1 1 1 1 1
1
INSTRUMENTATION 1 2 2 SERVICE PIPES:
ROOM
FIRE WATER / SPRINKLER LINE WASTE WATER
UPS ROOM
ABLUTION
FIRE EXTINGGUISHING
SYSTEM (NOVEC 1230)
1 1
BATTERY ROOM SPARE ROOM PRAYER ROOM 2
3 3
POTABLE WATER SEWAGE WATER
LAVATORY
MV SWITCHGEAR ROOM 2 2 3 3 AND BACKFLOW PREVENTER
2
PUMP ROOM
COOLING 3 3
1 HVAC:
2 4 4
2 2 2 3 3
2 2 2 2 2 2 2 2 2 SUPPLY AIR RETURN AIR FRESH AIR EXHAUST AIR
1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
A 2
4
TYPICAL LIGHTING FIXTURES FIRE FIGHTING & EMERGENCY EQUIPMENT
3
2 2
E-SYMBOLS COMMUNICATION
REFERENCE DRAWING:
RECESS AT EACH VSD UNITS PER ROOM DRAWING No. TITLE
DIMENSION OF RECESS WET ROOM NOTES: KITCHEN NOTES OPENINGS IN FIRE BARRIERS:
1 RECESS 150 x 150 1. WATER SUPPLY PIPES AT WET ROOMS ARE ALL OPENINGS IN FIRE BARRIERS SHALL
SURFACE-MOUNTED PIPES. 1. ALL FORMWORK-INLAYS AND OPENINGS BE PROVIDED WITH THROUGH PENETRATION
2 RECESS 200 x 200 AS REQUIRED BY KITCHEN SUPPLIER. FIRE STOPS WITH THE SAME FIRE
2. ALL FLOOR DRAINS AND PIPING LAID IN RATING THEN THE FIRE BARRIER.
3 RECESS 350 x 250 FORMWORK. 2. EXACT LOCATION AS PER KITCHEN NON COMBUSTIBLE (NFPA 5000)
4 RECESS 450 x 250 DETAIL DESIGN AND SITE SUPERVISION.
3. VENTILATION OF DRAIN PIPES PULLED UP- ENGINEER'S STAMP: CONTRACTOR'S STAMP:
5 RECESS 500 x 300 AND OVER THE ROOF.
3. ALL FLOOR DRAINS WITH SIPHON.
4. ALL FLOOR DRAINS WITH SIPHON &
BACKFLOW PREVENTER.
VSD
ROOMS
Project No.
20407 SHUQAIQ WATER TRANSMISSION SYSTEMS - PHASE 3
ENGINEER
CONTRACTOR
C 2 2 - Z G 2 0 - S - 7 0 1 8 7/8 A
SUB-
CONTRACTOR FINAL ENGINEERING: IBG Ltd.