1. Over view:-
o Discrete
o Repetitive
o Process Industries.
Discrete: -
Repetitive: -
Process Industries: -
Bill Of Material
Work center
Routing
Application of BOM
Usage of BOM
Status of BOM
Selection of BOM
Configuration setting related to BOM will enable to align the
BOM master data in line with the business requirement blue
print document.
Work Center:-
Capacity Requirements
Scheduling details
Costing details
Routing:-
Usage of Routing
Status of Routing
Selection of Routing
Configuration settings related to Routing will enable to align
the Routing master data in line with the business requirement
blue print document.
Example:-
BOM
Work Center
Routing
BACKGROUND
SCENARIO
It is required to configure various settings in SAP.
INSTRUCTIONS
To do configuration, first one has to logon to the system, and
go to the IMG mode. How to logon to IMG mode is explained
below. From next document onwards, it is mentioned as IMG.
4. Click
5. You are inside the IMG for Production Planning Module.
BACKGROUND
Design,
Production
Costing.
In this way, each area is dealing only with the specific data it
requires.
Example:
Note:-
INSTRUCTIONS
Follow the Menu Path: IMG Production Basic data Bill
of materials General data BOM Usage Define BOM
Usage
1. Click
2. Click
6. Click Save
When creating the BOM, key defined here will appear in the
BOM Usage field.
BACKGROUND
Sales
Production
Spare part
is a spare part
is related to Production
SCENARIO
INSTRUCTIONS
Follow the Menu Path: IMGProductionBasic dataBill of
materialsGeneral dataBOM usageDefine default values
for the item status
1. Click
2. Click
5. Click Save .
Example:-
BOM item level default setting will appear as per the setting
done here.
3.3 Define Allowed Material type for BOM Header
BACKGROUND
SCENARIO
INSTRUCTIONS
2. Click Save .
BACKGROUND
Example: -
- Explosion in MRP
MRP only reads BOMs whose BOM status has at least one of
these indicators.
SCENARIO
INSTRUCTIONS
1. Click
2. Click
6. Click Save .
BACKGROUND
INSTRUCTIONS
1. Click
2. click
6. Click Save .
Impact of this configuration in Master Data /
Transaction
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
2. Click
4. Click Save .
BACKGROUND
SCENARIO
For Long term planning, by default all the BOM items are
considered.
Then at BOM level against the item, LTP off indicator can be
set. Now during LTP run, only relevant items are planned in
LTP and all items are planned in MRP run.
INSTRUCTIONS
Follow the Menu Path: IMGProductionBasic dataBill of
materials Item dataDefine Explosion types.
1. Click
2. Click
5. Click Save
BACKGROUND
Production
Costing
Engg / Design
There are more than one BOM (BOM usage) They are
1 for Production,
2 for Engg/Design
3 for Costing.
INSTRUCTIONS
1. Click
Click to create additional order of priority for BOM
usage.
3. Click Save .
BACKGROUND
Areas like MRP run, cost estimate calculation etc.. will use the
BOM of its own respective BOM application.
SCENARIO
INSTRUCTIONS
1. Click
To view the details, select the line and click
3. Click Save .
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
Follow the below steps to create new entries.
3. Click Save .
BACKGROUND
Only the menu path is given here and the rest of the settings
are similar to above.
INSTRUCTIONS
BACKGROUND
Following parameters
Item category
Item increment
INSTRUCTIONS
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
2. Click
4. Click Enter
5. Select Created capacity category
6. Double Click
7. Click
10. Click .
When creating the work center for skilled labor, work center
category is to be mentioned as it is a mandatory entry.
4.2 Define Field Selection
BACKGROUND
Mandatory
Optional
Highlight
Hide
SCENARIO
INSTRUCTIONS
1. Click
2. Double click Basic data
9. Click
BACKGROUND
Usage of work center specific to the task list (i.e. only in the
master recipe or Routing) can be defined to restrict its usage.
SCENARIO
Define the task list usage to the work center category 0007 to
be used in Routing and in Reference Operations set only.
INSTRUCTIONS
1. Click
2. Select
4. Click
5. Update the Following fields
Field Description
Task List type N for Routing and S for
Reference Operation set
6. Click Save .
BACKGROUND
Power
Labour
Setup time
Depreciation
Steam etc.
SCENARIO
1. Click
2. Click
3. Update the Following fields
Field Description
Parameter Parameter to hold the value.
Any alphanumeric six digit
may be entered. E.g. LABOUR
Origin Place where from the value is
to be taken. E.g. To indicate
value to be taken from task
list maintain 2 in this field.
Short key word Short description
Key work Key word to identify
Dimension Dimension of the parameter.
E.g. Any thing related to
Duration may have TIME as
dimension.
Standard Value Unit Unit of this parameter. E.g.
Time dimension may have
unit as MIN.
BACKGROUND
Example:-
Production cost
Set up cost
Labour cost
Quality Cost
Power cost
Steam cost
One work center can have only one standard value key.
SCENARIO
1. Click
2. Click
3. Update the Following fields
Field Description
Standard value key Enter any alpha numeric to
indicate standard value key.
E.g. STD1
Description Maintain standard value key
description. E.g.
setup/machine/labor/Power
Parameter Maintain the parameters. Up
to six parameters can be
maintained.
Tick this check box to
generate formula.
4. Click Save .
Impact of this configuration in Master Data /
Transaction
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Update the Following fields
Field Description
Plant Name of the plant e.g. IND6
Person Responsible Three digit alpha numeric
entry to mention the
responsible person to the
work center. E.g. INP
Person responsible description Detailed description of the
person responsible. E.g. In-
charge Processing Unit
Click Save .
BACKGROUND
Scheduling of operation
Control key is mapped with the work center in the task list
(i.e. in the routing and in the master recipe).
SCENARIO
INSTRUCTIONS
1. Click
2. Click
3. Update the Following fields
Field Description
Control Key Enter any alphanumeric four digit
key. E.g. YP01
Description Maintain description of this control
key. E.g.
Sch/Cost/Capreq/Confreq/AutoGR
Indicators Tick the check box as shown above
in the screen.
Tick in the Check box will perform
the respective function to the
operation / phase which is having
this control key.
4. Click Save .
5. Click to maintain any long text to this
control key.
7. Click Save .
8. Click
BACKGROUND
Capacities can be
Machine
Labor
Processing unit
SCENARIO
INSTRUCTIONS
1. Click
2. Click
3. Update the Following fields
Field Description
Category Capacity category. E.g 001
Description Description of capacity
category e.g. machine
4. Click Save .
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
2. Click
4. Click Save .
BACKGROUND
There are mainly three ways to define capacity for each work
center.
Normal capacity
SCENARIO
1. Click
2. Click
6. Double Click
7. Click
13. Click
15. Click
18. Click
19. Update the Following fields
Field Description
Sequence Enter the sequence No. E.g.
01
Shift No. Shift number in the sequence.
E.g. 1
Description Description of the shift
sequence. E.g. Two shift per
day
Day1 to Day 7 Maintain the desired shift
definition the day to follow.
E.g. 1SHT and 2SHT in all
days except Thursday and
Friday.
20. Click
BACKGROUND
Cost
Capacity requirements
Calculate capacity
Note:-
SCENARIO
1. Click
2. Click
4. Click Save .
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
2. Click
5. Indicators:-
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
First Holiday calendar has to be maintained. There are two
holiday calendar,
1. Public holidays
2. Specific Holiday calendar
Click
Click
Select
Click
Click
Click
Click
Select
Click
Click
Enter calendar id. E.g. I6 to indicate it is for IND6 Plant
Enter valid from year and To year. E.g. From 2005 to 2025
Click
Click
Click
Note: - Whenever the calendar maintenance are saved, system
will give the message as shown above.
Click
Click
Click
Click
Maintain the entry as above.
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Update the Following fields
Field Description
Plant Enter the name of the plan.
E.g. IND6
Category Capacity category. E.g. 001
Click
BACKGROUND
Basic view
Default values
Capacity
Scheduling
Costing
SCENARIO
INSTRUCTIONS
1. Click
2. Enter work center category ZLAB
3. Click
Field Description
No Sequence number in which
tab screens are to be
displayed
Man Mandatory. Entry to be made
in this tab screen if this check
box is ticked.
Click
Impact of this configuration in Master Data /
Transaction
While creating the work center the sequence of Tab screen will
appear as per the configuration setting done here.
6. Routing
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
3. Click
4. Click
6. Click Save .
In Process
SCENARIO
INSTRUCTIONS
1. Click
2. Click
4. Click Save .
BACKGROUND
Production usage
Costing only
SCENARIO
INSTRUCTIONS
1. Click
2. Click
4. Click Save .
BACKGROUND
Queue time
Move time
Over lapping
Split
SCENARIO
1. Click
2. Click
4. Click
5. Select the Reduction strategy key entered above
6. Double click
7. Click
BACKGROUND
User field can be used in the operation heading in the task list
to define your own reference data.
SCENARIO
INSTRUCTIONS
1. Click
2. Click
BACKGROUND
Routing is essential to
SCENARIO
INSTRUCTIONS
2. Click
Field Description
ID Selection id. E.g. 01
Selection Priority Priority of selection in this ID.
E.g. enter from 1,2
Task List type Mention the task list type. E.g.
N for routing, 2 for master
recipe
Usage Enter the Usage of this task
list. E.g. 1
Status Enter the status of this task
list. E.g. 4
First system will search task list type routing as per the
sequence 1
Bill Of Material
Work center
Routing
Discrete
PPPI
Repetitive