Professional Documents
Culture Documents
Skills/Training Details:
All Personnel must be inducted & added to the Nepean Engineering Project S-Pack prior to commencement of
work.
Resources:
Page 1 of 18
NEPEAN ENGINEERING Pty Ltd
Code Of Practice: Amenities for construction work ( No. 317) Use of personal protective equipment at work - a guidance note.
Code Of Practice: Electrical practices for construction work (No. 301) Skin cancer and outdoor workers - a guide for workers - the choice is ours (No. 117)
Code of practice: Noise Management and protection of hearing at work
(No. 150) Shin cancer and outdoor workers - a guide for employers (No. 116)
Code of practice: OHS Consultation (No. 311) Dust in the workplace (No. 351)
Code of practice: OHS Induction training for construction work (No. 302 Hazpak! Making our workplace safer (No. 228)
Code of practice: Overhead protective structures (No. 17) High visibility clothing OHS Safety Guide
Code of practice: Tunnels Under Construction (No. 10) Standards and codes offer practical guidance on health and safety for construction
work. However, these are subject to change from time to time. For further
information contact the workcover assistance services on: 131050
Code of practice: Work in hot or cold environments (No. 309)
Code of practice: Moving Plant on Construction sites.
Page 2 of 18
AUSTRALIAN STANDARDS REGISTER
The following Legist ration, Standards, Codes Of Practice, Guidelines are provided as being relevant to the activities in this SWMS
AUSTRALIAN STANDARDS
Standards mat be obtained directly from Standards Australia (www.standards.com.au)
National Standard for Construction Work [NOHSC:1016 (2005)
Page 3 of 18
NEPEAN ENGINEERING Pty Ltd
Page 4 of 18
NEPEAN ENGINEERING Pty Ltd
Skills/Training Details:
Employee Additional training
Qualifications On-site experience
Name required for this task
Page 5 of 18
NEPEAN ENGINEERING Pty Ltd
Possible
- cause minor damage to the structure;
- breach the site boundary and pollute local 2
1 2 2 2 3 environment.
Practically
- be contained within the site boundary.
3
impossible 2 3 3 3 3
TOM
3 Delivery of Lift Transport arrival 3 As per RTA Permit transport truck will BUCHANAN
Shafts route arrive via Home Bush bay drive onto
Australia Ave then turn into Herb Elliott
Ave at 4 am
3 Unload Trucks Load falling - 2 All Steel Members must be removed Tom
and move Loading & from transport vehicle with BLL Crane Buchanan
materials (incl Unloading Crew and lowered into position to works
steelwork) to Transport. area
work areas.
2 Lifts will not be removed until all Traffic
Management Plan 84 has been
implemented and all Clearwater
employees are ready to start
Page 7 of 18
4 Working with Delivery 1 Operator be trained and be familiar with TOM
ewps to erect controls and general requirements of BUCHANAN
lift shaft machine.
members
EWP must have a checklist from hire
company that confirms EWP is safe to
use and signed by a licensed mechanic.
Pre-Start Daily Death or serious 1 Carry out daily inspection / checks as TOM
inspection injury per manufacturers recommendations in BUCHANAN
the operators manual
Operating EWP - Fall from 1 Never stand or sit on kick boards, TOM
platform. handrails or mid-rails, Ensure gate is BUCHANAN
- Tip m/c over. securely closed.
- Collision injury
Ensure tyres are inflated to correct
pressures.
Working from - Tip over, injury 1 Do not use EWP as a crane, do not TOM
EWP to people below. overload the platform, observe and do BUCHANAN
- Fall from not exceed SWL.
platform.
Page 8 of 18
-tools falling
Never use to push or pull other objects.
Page 9 of 18
Keep away from water and damp areas.
Page 10 of 18
Carry out daily inspection / checks as
Pre-start daily Death or serious 1 per manufacturers recommendations in
inspection injury. the operators crane manual
Operation of Traffic Movement 2 Observe site traffic rules, the directions TOM
the Crane on site. of traffic controllers and/or BUCHANAN
rigger/Dogman.
Page 11 of 18
load when before loosening restraints. Do not
removing stand on or amongst load when
restraints restraints are being loosened.
Rigging, Load or parts of 1 Secure every part of a load whilst raised TOM
Slinging and load slipping or lowered to prevent danger from BUCHANAN
Dogging and/or falling slipping or displacement.
Securing the
Crane after Edges on load 1 Take adequate precautions to prevent
use. causing damage the edges of a load from damaging any
to load lifting sling, rope or chain
equipment
Page 12 of 18
Unaccredited 1
Prohibit Riggers from
Rigger / Dogman
or not working to A) Riding the hook or the load
accreditation
criteria B) Sliding down lines and guys
C) Descending by "skinning" Columns
D) Jumping from elevated surfaces
6 Install
Chemset/Hold
down Bolts
Page 13 of 18
Drill & Install Electrocution - 1 All electrical leads and equipment to be TOM
Chemical Using electrical tagged monthly by a licensed BUCHANAN
Anchors equipment. electrician.
and,
A safety overload device is to be used
on all electrical equipment.
and,
Personnel to be aware of danger of
electrocution from over-head or hidden
cables, if in doubt ask then
insulate/isolate.
Noise 2 All workers must where hearing TOM
protection at all times whilst working BUCHANAN
with drills.
Page 14 of 18
6 Install lift shaft Lifting steel 2 Set up an exclusion zone around the TOM
Members Members into atrium area and display signage if BUCHANAN
location anyone comes into the exclusion zone
BLL to be informed and a near miss /
hazard identification form filled out and
Given to site safety officer to take action
7 Welding and Install shs 2 After each section of lift shaft members TOM
oxy cutting members and have been erected, welding of the shs BUCHANAN
steel shs to fit weld into place at stubs will be required.
lift shaft all levels
2 Access will be gained to areas using
only telescopic booms or spider booms
Page 15 of 18
A safety overload device is to be used
on all electrical equipment.
9 Grout & Tidy Reaction to 3 Personnel to be trained in the use of the TOM
Up. chemicals - product per the attached MSDS. BUCHANAN
Installing grout.
Slips, trips & falls 1-3 Personnel are to ensure the work area TOM
is kept clean and free from trip hazards BUCHANAN
at all times.
Page 17 of 18
I have read and understood the above SWMS and I will carry out all work in accordance with the procedures
and safety controls listed. If the work or conditions differ to that stated above, I will consult with the Project/Site
Manager to seek directions prior to continuing work.
Page 18 of 18