You are on page 1of 90

Mine Ventilation

Module: I Mine Ventilation - Introduction

Dr. Nuhindro Priagung Widodo

Teknik Pertambangan
Fakultas Teknik Pertambangan dan Perminyakan, Institut Teknologi Bandung
2009

1 NPW
Brief History of Mine Ventilation
Between 4000 and 1200 B.C., European miners dug tunnels into chalk
deposits searching for flint.
The Laurium silver mines of Greece, operating in 600 B.C. have layouts
which reveal that the Greek miners were conscious of the need for a
connected ventilating circuit.
The first great textbook on mining was written in Latin by Georgius
Agricola, a physician in a thriving iron ore mining and smelting
community of Bohemia in Central Europe. Agricola's "De Re
Metallica", produced in 1556, is profusely illustrated.
A number of the prints show ventilating methods that include diverting
surface winds into the mouths of shafts, wooden centrifugal fans
powered by men and horses, bellows for auxiliary ventilation and air
doors.

2 NPW
3 NPW
Brief History of Mine Ventilation
Agricola was also well aware of the dangers of
blackdamp, air that has suffered from a reduction in
oxygen content, - 'miners are sometimes killed by the
pestilential air that they breathe," and of the explosive
power of "firedamp", a mixture of methane and air
"likened to the fiery blast of a dragon's breath."
De Re Metallica was translated into English in 1912 by
Herbert C. Hoover and his wife, Lou. Hoover was a
young American mining engineer who graduated from
Stanford University and subsequently served as President
of the United States during the term 1929-1933.

4 NPW
Brief History of Mine Ventilation
The Industrial Revolution brought a rapid increase in the
demand for coal. Conditions in many coal mines were quite
horrific for the men, women, and children who were employed in
them during the 18th and 19th centuries. Ventilation was
induced either by purely natural effects, stagnating when air
temperatures on the surface and underground were near equal,
or by fire.
George Stephenson, admitted to this practice during the
inquiries of a government select committee on mine explosions
in 1835. A common method of removing methane was to send a
"fireman'' in before each shift, covered in sackcloths dowsed in
water and carrying a candle on the end of a long rod. It was his
task to burn out the methane before the miners went into the
working faces.

5 NPW
Brief History of Mine Ventilation
John Buddle (1773-1843), an eminent mining engineer in the
north of England produced two significant improvements. First, he
introduced "dumb drifts" which bled sufficient fresh air from the base
of a downcast shaft to feed the furnace. The return air, laden with
methane, bypassed the furnace.
Buddle's second innovation was "panel (or split) ventilation". Until
that time, air flowed sequentially through work areas, one after the
other, continually increasing in methane concentration. Buddle
originally divided the mine layout into discrete panels, with
intervening barrier pillars, to counteract excessive floor heave.
However, he found that by providing an intake and return separately
to each panel the ventilating quantities improved markedly and
methane concentrations decreased. He had discovered, almost by
accident, the advantages of parallel layouts over series circuits.
The mathematical proof of this did not come until Atkinson's
theoretical analyses several decades later

6 NPW
Brief History of Mine Ventilation
A crisis point was reached in 1812 when a horrific
explosion at Felling, Gateshead killed 92 miners. With
the help of local clergymen, a society was formed to
look into ways of preventing such disasters.

Contact was made with Sir Humphrey Davy,


President of the Royal Society, for assistance in
developing a safe lamp. Davy visited John Buddle to
learn more of conditions in the mines. As this was well
before the days of electricity, he was limited to some
form of flame lamp.

Within a short period of experimentation he found that


the flame of burning methane would not readily pass
through a closely woven wire mesh. The lamp glowed
'red hot' because of the methane burning vigourously
within it, yet the flames could not pass through the
wire mesh to ignite the surrounding firedamp.
7 NPW
Brief History of Mine Ventilation
Perhaps the greatest classical paper on mine ventilation was one
entitled "On the Theory of the Ventilation of Mines", presented by
John Job Atkinson to the North of England Institute of Mining
Engineers in December, 1854.
During Atkinson's productive years the first power driven ventilators
began to appear. These varied from enormous steam-driven piston
and cylinder devices to elementary centrifugal fans.
Improved instrumentation allowed organized ventilation surveys to
be carried out to measure airflows and pressure drops for the
purposes of ventilation planning, although there was no practical
means of predicting airflows in other than simple circuits at that
time. Atkinson's theory was confirmed in practice. The first
successful axial fans were introduced in about 1930.

8 NPW
Brief History of Mine Ventilation
In 1943, Professor F.Baden Hinsley produced another
classical paper advancing understanding of the behaviour of
airflow by using thermodynamic analyses.
Hinsley also supervised the work at Nottingham University that
led to the first practical use of analog computers in 1952 to
facilitate ventilation planning. This technique was employed
widely and successfully for over a decade. This is now the
dominant method used for ventilation planning

9 NPW
UNDERGROUND EXCAVATION

10
Longwall Coal Mine

11 NPW
Mining Front

12 NPW
VENTILATION PURPOSES
Supply a fresh air into the tunnel for inhalation of workers and all of the
process which happen in the tunnel.
Mine ventilation means total air conditioning:
1. Quality control (purifying and removing contaminants)
a. Gas control vapors and gaseous matter, including radiation
b. Dust control particulate matter
2. Quantity control (regulating magnitude and direction of airflow)
a. Ventilation
b. Auxiliary or face ventilation
c. Local exhaust
3. Temperature humidity control (controlling latent and sensible heat)
a. cooling; b. heating; c. humidification; d. dehumidification
13
FACTOR AND CONTROL FOR
MINE VENTILATION RISKS

14
MINE AIR FLOW PRINCIPLES
Air will flow from the place that have a low temperature to place
which have a higher temperature (high pressure to low pressure)
Air will flow through a low resistance ventilation airways rather
than the higher resistance airways
Mine ventilation is essentially the application of the principles of
fluid dynamics to the flow of air in mine openings.

15
AIR PRESSURE

16
THEORY
(i)

17
MOODY DIAGRAM

18
AIRWAY FRICTION

19
FAN

20 NPW
FAN

21 NPW
FAN

22
FAN

23
INSTRUMENTS IN VENTILATION SURVEYS

24
TRACER GAS METHODS

25
TRACER GAS METHODS

26
27 NPW
Ventilation Surveys and Simulation

28 NPW
Strata
Gas

29 NPW
Diesel Exhaust Fumes

30 NPW
Dust

31 NPW
32 NPW
33 NPW
Heat

34 NPW
35 NPW
36 NPW
Workshops and other areas

37 NPW
Air velocity limits

38 NPW
Ventilation Planning

39 NPW
40 NPW
VENTILATION OF ROADWAYS TUNNEL

41
VENTILATION OF ROADWAYS TUNNEL

42
43
SCOPE OF A MINE VENTILATION STUDY
Review of the various airborne contaminants (dust, gases, radon, heat,
etc) and how these will be managed.
Included in this would be filtration, dilution, exhaust or other control
strategies and any cooling or heating required, and the location, type and
size of such devices.
The primary ventilation network at all key milestones in the development,
construction and production phases.
This should include the system of airways and their sizes, friction factors
and shock losses, and the location and specification of all fans and
ventilation control devices. This is basically addressing the issue of the
volume and distribution of air throughout the mine life.

44
Scope of a Mine Ventilation

Secondary/auxiliary ventilation design.


Review of egress and entrapment provisions in the mine over its life.
A ventilation management plan which covers the day to day operation
and management of the ventilation system and any trigger action
response plans (TARPs), standard work or operating procedures (SWPs,
SOPs) for ventilation-related tasks, etc.
Formal risk assessments covering both the normal operations and day-
to-day activities and all credible abnormal operations or events (power
failures, fire, collapse of a major airway, etc)

45
KEY FACTORS TO BE CONSIDERED BEFORE COMMENCING
ANY VENTILATION DESIGN
Dust, radon and/or methane or other airborne gaseous, fume or particulate
contaminants or asphyxiants (e.g. nitrogen)
Gas contents of orebody/coal seam and adjacent strata; issues of gas drainage
Spontaneous combustion potential
Outburst potential
Water inundation (flooding) potential
Dust audits, silica (or other contaminant) contents of strata
Production, development, diamond drilling, raiseboring (or other vertical
development) and production drilling schedules
Other important schedules or deadlines (e.g. construction schedules)
Mining methods, layouts, mine design, etc
Manpower schedule, by job type and location for both production and construction
phases

46
Key Factors To Be Considered .
Major mobile equipment schedules, especially diesel equipment (maximum kW rating,
dimensions, speed loaded and unloaded, up and down ramp, tonnes moved)
Mode of operation of diesel equipment (where travel,when, truck/loader combinations)
Diesel fuel usage, average and maximum per shift
Fixed electrical plant and efficiencies
Any special areas requiring filtered air or special ventilation (e.g. control rooms, crib
rooms, offices, ventilation at crusher jaws, transfer points on belts, tipping points)
Coal, ore, mullock/waste or other materials handling flowcharts
Humidity limits for ore/waste including transfer points
Humidity limits for ground control/rock strata
Backfill system and operation, type of fill, method of placement
Locations of fuel and oil storage, refueling, other major stores, combustible material, etc

47
Key Factors To Be Considered .
Parking arrangements
Special fire fighting standards
Special egress or entrapment standards
Any maintenance arrangements impacting on egress (outages, inspections, etc)
Minimum medical/physical requirements for continuing employment or for visitors
Blasting arrangements: development and production, bins, chutes, etc, including
frequency of blasting: development and production
Re-entry times after blasting etc
ANFO and other explosives consumption rates: development and production
Cement usages and consumption rates
Oxidation rates (to SO2 and/or CO2)
Working in heat protocols
Other special ventilation-related hazard protocols

48
Key Factors To Be Considered .
Internal corporate ventilation/workplace environment standards for each job type (i.e. typical
ventilation arrangements)
Statutory (legislative) requirements
Internal (company or mine) generic standards, hazard management plans, etc
Any noise criteria (impacting on noise insulation or siting of fans etc)
Any sources of dust, e.g. due to cutting, loading, etc
Dust controls (e.g. sprays) at drawpoints, tipples, conveyors, roads
Other sources of heat
Surface climate (WB, DB, BP) by hour for minimum of six years
Surface elevation above sea level
Depth of mining operations
Near-surface virgin rock temperature and geothermal gradient
Rock thermal conductivity, thermal capacity, diffusivity, density
Maximum heading lengths for auxiliary development, development heights and widths
Method of auxiliary ventilation, type and size of ducts, leakage factors
49
Key Factors To Be Considered .
Any existing ventilation circuits, fans (including fan curves), controls etc
Any existing cooling devices
Usage and policy on air-conditioned cabins in mobile equipment and fixed plant
Mining (especially horizontal and vertical development) and ventilation (fan, controls, ducting)
costs
Friction (k) factors and shock losses used or measured in the operation
Any surface considerations (dust from quarrying etc, prevailing winds, grass/bush fires, nearby
plant)
Surface environmental limits on fans and shafts: noise, dust, water, smell, visual amenity
Shaft, raise and other major airway resistances and last time measured
Standards in regard to allowable pressures on ventilation doors (airlocks) or other ventilation
controls
Ventilation or isolation of caved regions or goafs; leakage and pressure balancing
Network analysis and validation (comparing to measured data)

50
Key Factors To Be Considered .
Multi-level tipping controls or protocols
Ground/fissure water in mine (amount, location, temperature (if very hot))
Location of shafts, fresh and return air raises, distances apart (determines typical auxiliary
ventilation line configurations and lengths)
Wetness of shafts. If wet, potential for water corrosion or erosion on fans. Potential for the
shaft to be subject to erosion or sloughing or water plugging
Natural ventilation pressures; seasonal changes; impacts of refrigeration on natural ventilation
pressures
Network simulation program used; Other computer programs in use or required to be used
Data on ventilation monitoring (e.g. strata gases, diesel exhausts, airflows, on-line monitoring)
Recent or relevant ventilation or feasibility studies; Any other safety aspects that need to be
considered
Any recent ventilation audits completed; Any concerns from the operators or planners about
current or future ventilation problems
Any telemeter, remote monitoring or remote operation/control requirements

51
52
MINE
VENTILATION

53
COAL UNDERGROUND MINE

54 NPW
SERIOUS DISASTERS RELATED TO
MINE VENTILATION IN JAPAN
Date Mine Category Cause Fatalities
63/11/9 Miike Dust explosion ?
64/6/1 Yamano Gas explosion ?
65/2/22 Yuubari Gas explosion Spontaneous
combustion
66/3/22 Sorachi Gas dust explosion Blasting
66/11/1 Honbatsu Gas dust explosion Blasting
68/1/20 Bibai Gas explosion Blasting
68/5/12 Bibai Mine fire ?
68/7/30 Heiwa Mine fire ?
69/4/2 Mojiri Gas explosion Blasting
70/12/15 Sunagawa Gas explosion ?
72/11/2 Ishikari Gas explosion Blasting
73/12/19 Sunagawa Gas explosion ?
75/11/27 Horonai Gas explosion Blasting
77/5/11 Ashibetu Gas explosion Blasting
79/5/16 Minami Gas explosion Static electricity
ooyuubari
81/10/16 Yuubari Gas explosion Static electricity
sinkou
84/1/18 Ariake Mine fire Belt conveyor
85/4/24 Takashima Gas explosion Static electricity
85/5/17 Minami Gas explosion Static electricity
ooyuubari

55 NPW
56 NPW
57 NPW
58 NPW
59 NPW
60 NPW
Kompas, Senin, 29 November 2004, 02:52 WI
25 Tewas 140 Terperangkap Dalam Kecelakaan Tambang di Cina
Tongchuan, Cina, Senin

Sedikitnya 25 pekerja tambang tewas dan sekitar 140 terperangkap Minggu (28/11) ketika ledakan gas
terjadi di sebuah tambang batubara di Cina utara. Kemungkinan ini merupakan musibah terburuk yang
melanda produsen tambang terbesar dunia itu dalam beberapa tahun ini.

Dari 293 petambang yang bekerja di bawah tanah ketika ledakan itu terjadi di tambang batubara
Chenjiashan di provinsi Shaanxi, Minggu pagi, 127 berhasil menyelamatkan diri atau diselamatkan, kata tim
penyelamat menurut Kantor Berita Xinhua. "Mereka yang menyelamatkan diri dari ledakan gas itu terutama
pekerja di dekat pintu terbang dan seluruh korban cedera telah dirawat di rumah sakit, termasuk 11 orang
yang cedera parah," kata petugas penyelamat di lokasi kejadian.

"Seorang pekerja yang diselamatkan mengatakan bahwa meski bekerja di sebuah lokasi sekitar 1.500 meter
di bawah tanah, ia terjatuh oleh hempasan arus udara kuat yang ditimbulkan ledakan itu," kata petugas
tersebut lagi, Senin (29/11) pagi.

Petugas penyelamat mengalami kesulitan mendekati lokasi ledakan karena tingkat karbon monoksida yang
tidak aman. Prioritas utama adalah memperbaiki sistem ventilasi yang rusak parah di tambang itu untuk
menjamin keselamatan tim penyelamat, kata Zhao Tiechui, wakil kepala Biro Keamanan Produksi Negara.

Enam tim penyelamat sedang berusaha menjangkau para pekerja yang terperangkap dan 10 tim tambahan
didatangkan untuk membantu mereka. Pemerintah provinsi tersebut telah memerintahkan semua tambang
dengan
61 konsentrasi
NPW gas tinggi menghentikan operasi mereka untuk pemeriksaan keamanan.
.
AN EXAMPLE OF CONCENTRATIONS OF GASES DOWNWIND OF
A FIRE
* Saiko to Hoan vol.24,No7,1977

8 25
7 H2(%) O2(%)
CH4(%) 20
6 CO2(%)
Concentration(%)

Concentration(%)
CO(%)
5
15
4

3 10

2
5
1

0 0
0 10 20 30 40 50 60 70 0 10 20 30 40 50 60 70
Time(min)
Time(min)

62 NPW
HUMAN TOLERANCE TO TOXIC GASES
ppm minutes 30min 1-2 hours 8hours
3000 1600 800 100
2 50000 40000 35000 32000
2 400 150 50 8
2 240 100 50 30
2 1000 700 500 100

HUMAN TOLERANCE TO OXYGEN DEFICIENCY


Oxygen (%) Effects on Human Body
21 None
17 Impaired muscular co-ordination
14 Danger level of self-escape
12 Dizziness, headache, rapid fatigue
9 Unconsiousness
6 Death in 6-8 minutes

* Birch, N.,Passenger Protection Technology in Aircraft Accident Fires. Gower Technical Press, 1988

63 NPW
AIR TEMPERATURE DOWNWIND OF A MINE FIRE
1000
v=3m/s
Temperature() 800
v=1m/s
600

400

200

0
50 100 150 200 250 300 350 400
Distance(m)

HUMAN TOLERANCE TO AMBIENT TEMPERATURE


Temperature (C) 60 70 80 100 120 140 150
Time (minutes) 120 65 45 15 10 5 1
64 NPW
LOWER AND UPPER EXPLOSIVE LIMIT OF SOME COMBUSTIBLE GASES

Limits of explosibility, volume (%)


Combustible gas Lower limit Upper
Methane 5.0 15.0
Ethane 3.0 12.5
Propane 2.3 9.5
Carbon monoxide 12.5 74.2
Hydrogen 4.1 74.2
Hydrogen sulfide 4.3 46.0

65 NPW
Methane (CH4)
Methane (CH4)
MINE FIRE DETECTIONS
PERFORMANCE OF MINERS RELATIVE
TO THE MINE AIR TEMPERATURE

69 NPW
OPERATIVE AND EFFECTIVE TEMPERATURE

Operative temperature Effective temperature

70 NPW
THRESHOLD LIMIT (TIME-WEIGHTED AVERAGE) VALUES FOR
VARIOUS DUSTS IN DIFFERENT COUNTRIES
(AFTER MAJOR, 1978, AND WALTON, 1978)

Coal dust (mg/m3) Quartz -containing dust (mg/m3) Asbestos (fibres/ml)


Australia
5;respirable dust 25(% respirable free silica + 5) 4;for chrysotile and amosite;
containing <= 5 % free 2;long -term average for other than
silica crocidolite

UK
8;longwall faces 3- drivages if quartz >0.45 mg/m3 0.2;for crocidolite when measured
6- if quartz <0.45 mg/m3 over a 10 minute period;
6 - other places 2; for other types of asbestos
averaged over a 4 hour period
USA
2;respirable dust 10(% respirable quartz + 2) 2; >5 m long(8 hour time -weighted
containin g <=5 % average)
quartz

71 NPW
Requirements of underground air in quantity and quality
< Coal Mine Safety Regulations of Japan >
(Oxygen and carbon dioxide) Article 86
Mine air underground where mine workers work or pass shall contain 19% or more oxygen and 1% or less carbon
dioxide. However, this shall not be applied in cases where oxygen concentration is 19% or more and carbon dioxide
is 2% or less with permission by the Director-General of MSIB or MSID.
2. The provision of the preceding Clause shall not be applied the working place where human life rescue or the activity
regarding safety is conducted in a safe way.

(Inflammable gas content in the main return air) Article 87


The inflammable gas content in the main return air shall be kept at 1.5% or less. However, this Article shall not apply to
cases where inflammable gas from gas drainage holes or exclusive galleries for drainage gas is released into the
main exhaust, under the condition that the ventilation quantity is sufficient to dilute the inflammable gas
concentration to 2.5% or less and that permission is given by the Director-General of MSIB or MSID, neither does it
apply to cases which are stipulated by Article 104-2 and Article 124.

(Inflammable gas content in working places and roadways) Article 88


The inflammable gas content shall be kept at 1.5% or less in underground working places and at 2% or less in
underground roadways. However, this Article shall not be applied to cases stipulated in Item 2 and Item 4 in Article
124.

Underground temperature) Article 89


The temperature of the working place shall be 37 C or less. However, this provision shall not be applied to the working
place where there is activity due to a special reason such as a gush out of hot spring with permission of the Director-
72 General
NPWof MSIB or MSID or human life rescue regarding safety is conducted in a safe way.
(Ventilation quantity) Article 90
The ventilation quantity of underground working places shall be decided based on the number of mine workers, the quantity of
inflammable gas or harmful gas produced, the possibility of spontaneous combustion, temperature and humidity.
2. Air current and flow volume in underground working place shall maintain adequate speed and volume which is sufficient to dilute
and sweep away inflammable gas or harmful gas and fumes of blasting.

Article 91
In all Class-A pits, the ventilation quantity at the entrance of intake shall be 3 m3 /min per person or more and this is based on the
maximum number of workers engaging in underground working at the same time. However, when it is required to restrict the
ventilation quantity for prevention of spontaneous combustion etc. and with the permission of the Director-General of MSIB or
MSID, the ventilation quantity may be reduced.

(Ventilation speed) Article 92


Ventilation speed underground shall be 450 m/min. or less (except an exclusive gallery for ventilation). However, in a shaft the
speed may increase up to 600 m/min.
2. The ventilation speed in the preceding Clause may be increased due to a special reason with the permission of the Director-
General of MSIB or MSID.

(General ventilation facilities) Article 94


In a mine having a coal pit where 50 mine workers or more are working, a barometer and a thermometer shall be installed in a
proper place.

73 NPW
Decree of The Minister of Mines and Energy
No. 555.K/26/M.PE/1995
on General Mining Occupational Safety and Health
Part Eight
Ventilation
Article 369
General Provisions
(1) At any underground mine :
a. the Technical Mine Manager shall ensure that an adequate supply of fresh air is available at
every work site with the requirement that the oxygen content in air shall be no less than 19.5
percent and the carbon dioxide content shall be no more than 0.5 percent;
b. it is prohibited to send any employee to work at any work site that contains dust smoke or
vapours in concenhations that may be disruptive to health and
c. airflow shall be sufficiently adequate to reduce or remove concentrations of smoke from
blasting as soon as possible.

74 NPW
Article 369
General Provisions

(2) When the presence of combustible and explosive gases is detected in any mine
ventilation system, the Technical Mine Manager shall take appropriate corrective
measures.
(3) The volume of fresh air passing through the ventilation
(4) system shall :
a. be calculated based on the maximum total number of workers at the work location with
the requirement that no person shall receive less than 2 cubic meters per minute for the
duration of work and
b. an additional 3 cubic meters per minute for every degree of horse power where a diesel
machine is being operated.
(5) The Mine Inspector may order the Technical Mine Manager to increase the quality and
volume of fresh air flow at any section of the mine.
(6) It is prohibited to re-circulate air in any ventilation system.

75 NPW
Article 370
Ventilation Standards
(1) The air temperature in any underground mine shall be maintained at between 18 degrees
Celsius and 24 degrees Celsius with maximum relative humidity at 85 percent.
(2) Apart from the requirements of paragraph (1) letter a the ventilation conditions at the work
site shall :
a. for an average of 8 hours :
1) have a carbon monoxide (CO) volume of no more than 0.005 percent;
2) have a methane (CH4) volume of no more than 0.25 percent;
3) have a hydrogen sulphide (H2S) volume of no more than 0.001 percent and ,
4) have a nitrous oxide (NO) volume of no more than 0.0003 percent.
b. over any 15 minute period :
1) CO must not exceed 0.04 percent and
2) NO2 must not exceed 0.0005 percent.
(3) Flame safety lamps or any other suitable device shall be used to test for any lack of oxygen.
(4) Any location that does not require ventilation shall be sealed and signs prohibiting entry
thereto shall be installed.

76 NPW
Article 370
Ventilation Standards
(5) In every sealed area, stoppings shall be provided with a pipe and a valve to permit sampling of
the atmosphere and measurement of the pressure behind such seal.
(6) The ventilation velocity shall be no less than 7 meters per minute and shall be increased in
accordance with work requirements and after blasting.
(7) All airways shall be of adequate dimensions for the quantity of air they are designed to pass.
(8) The Technical Mine Manager shall appoint an employee who shall be in charge of supervising
ventilation of the mine and the name of the said employee shall be recorded in the Mine Book.
(9) The quantity and quality of air being distributed to every work area shall be determined at
intervals of at least once per month
(10) The locations at which measurements are taken shall include:
a. every main intake airway, as near as practicable to the entrance of the shaft or outlet;
b. at every split where air leaves the main airfIow, as near as possible to the junction;
c. where the split serves a working district : 50 meters from the first working place at which the air enters, and 50
meters from last working place at which the air leaves the district;
d. in the district return airway, as near as practicable to the junction with the main return airway.
e. any other place stipulated by the Mine inspector.

77 NPW
Article 370
Ventilation Standards
(11) Sampling to determine & oxygen content (O2), carbon dioxide content (CO2),
carbon monoxide content (CO) and nitrous oxide content (NO2) of the air taken under
normal working conditions shall be implemented at intervals of at least once per month at the
following places:
a. 30 meters from the working face of development headings;
b. 15 meters from the winzes and shafts and
c. at the base of the up-cast shaft and at any stope with only one access way.
(12) Sampling for the purpose of determining the carbon monoxide content (CO) and
nitrous oxide (NO2) content at any location or at the end of any shaft where a diesel machine
is being operated shall be carried out at intervals of at least every seven days.
(13) Results of findings of the requirements of paragraph (11) and paragraph (12) shall
include the time and location of where the samples were taken as well as the time of the most
recent blasting.
(14) Temperature shall be measured regularly at locations as required in paragraph (10)
letter c and d, and where the temperature exceeds 24 degree Celcius, the said place shall be
inspected every week.

78 NPW
Article 370
Ventilation Standards
(15) Measuring for dust concentrations at lower than l0 microns shall be carried out
as often as practicable but no less than once every three months except where otherwise
stipulated by the Chief Mine Inspector.
(16) When any changes are made to the direction or distribution of airflow which
affects the amount of air entering or leaving and area, air measurements shall be carried
out as soon as possible after the said change is made.
(17) The results of air measurements as required in paragraph (16) shall be recorded
in the ventilation book.
(18) Ventilation measuring shall be carried out by a competent person.
(19) Sampling as specified in paragraph (1) and (2) shall not be required where
according to the judgment of the Chief Mine Inspector the condition of ventilation in the
mine is adequate.

79 NPW
Article 371
Natural Ventilation
(1) Use of natural ventilation shall be approved by the Chief Mine Inspector.
(2) When every part of the mine continuously makes use of natural ventilation the
requirements of Article 369 and Article 370 shall be fitted with a ventilation fan at the
surface which shall be used when required.
(3) Based on the size of the mine and the condition of the environment of work sites at the
mine the Mine Inspector may require that an auxiliary ventilation fan is necessary with a
capacity of no less than what is required to distribute an adequate quantity of air which is
required to workers when evacuation must be carried out.

80 NPW
Article 372
Ventilation Fans
(1) Whenever practicable, surface ventilating fans (main fans) shall be equipped with the
following:
a. an alternative power source;
b. a water gauge;
c. either an automatic fan rotation indicator or an automatic air pressure indicator;
d. an efficient air lock;
e. a fan drive and fan house both of which must be fireproof;
f. fireproof air ducts and pressure relief devices;
g. equipment that is capable of reversing the direction of the flow of air and on which regular testing must be
carried out and
h. other safety devices which shall be stipulated by the Chief Mine Inspector.
(2) The Technical Mine Manager shall provide instructions to the operator of the ventilation
fan about the rotation speed of the said fan.
(3) The operator as required in paragraph (2), shall test the ventilation fan, and observe the
water gauge and the automatic indicators at intervals of at least every 2 hours.

81 NPW
Article 372
Ventilation Fans
(4) When the measuring devices and the automatic ventilation pressure recorder are not available,
the operator of the ventilation fan shall record the rotation speed of the wind fan and the
pressure as indicated on the water gauge every two hours.
(5) As required in paragraph (2), the operator shall make a report to his/her supervisor of the
following :
a. any damage, deviations or the stopping of the ventilation fan and
b. unusual variations in pressure as indicated by the water gauge.
(6) Every ventilation fan at the surface of a mine that is not attended shall be fitted with
permanent monitoring equipment which sends early warnings of the presence of any defects
in the operation of the ventilation fan to a location that is always manned.
(7) The intake (suction site) of fans shall be provided with an adequate guard or screen.
(8) Depending on the size and the environmental conditions of the mine, the Mine Inspector may
determine the need for a reserve ventilating fan available for immediate use and capable of
producing sufficient airflow.

82 NPW
Article 372
Ventilation Fans
(9) The ventilation fan housing, the air duct connections, the fan house, and other buildings in the
vicinity of the ventilation fan shall be constructed of non combustible materials, However,
where made from combustible materials the wind fan and surrounding buildings shall be
adequately protected from fire.
(10) The up-cast shaft connected to a drift or air duct to the ventilation fan shall be fitted with an
airlock which prevents the occurrence of short circuits of airflow.
(11) It is prohibited to build any combustible structure within a distance of 50 meters of the
ventilation fan house.
(12) The auxiliary ventilation fan shall be installed underground while other ventilation fans may
also be installed after approval is obtained" to ensure that disruptions to the safety and health
of underground mine workers will not occur.
(13) All underground main fans shall have controls placed at a suitable protected location remote
from the fan preferably on the surface. An independent alternative power supply from the
surface shall be provided.
(14) It is prohibited to stop a ventilation fan except where approval has been obtained from the
ventilation supervisor.

83 NPW
Article 372
Ventilation Fans
(15) It is prohibited to install an booster fan underground except where a ventilation survey has
been conducted.
(16) All ventilating fans installed and used to ventilate active workings of the mine, shall be
operated continuously while persons are underground in the active areas except for scheduled
production cycle shutdowns or planned fan maintenance or adjustment. All persons
underground in the affected areas shall be advised in advance of such scheduled fan shutdowns.
No blasting operations shall be allowed during any fan stoppage.
(17) In the event of a fan failure due to malfunction, accident, power failure or any other such
unplanned or unscheduled events, all mine workers shall leave any area ventilated by the fan
except any employee who is repairing the said ventilation fan.
Ventilation shall be maintained and restored to normal before any mine worker enters any
area affected by the ventilation system.
(18) All ventilation fans shall be maintained in accordance with the manufacturer's instructions or
the written schedule as specified by the Technical Mine Manager.

84 NPW
Article 373
Ventilation Fan Systems
(1) Before any auxiliary fan is installed below ground the Underground Mine Manager must
be satisfied that a sufficient quantity of air is reaching the fan to prevent recirculation of
air, and this air is not polluted by dust, smoke, or hazardous gases.
(2) Auxiliary ventilation fans shall be equipped with grounding devices.
(3) Auxiliary ventilation fans may only be activated, operated and turned off by the
authorized employee.
(4) Auxiliary fans shall be installed at a point at least 5 meters from the nearer side of the
entrance to the place to be ventilated by it.
(5) When two or more auxiliary fans are installed in a series the requirements of paragraph
(4) shall only apply to one of the said fans.
(6) Any forcing type auxiliary ventilation fans shall be installed at the intake airway and
exhaust type auxiliary ventilation fans shall be installed at the return airway.
(7) There shall be installed and maintained with every auxiliary fan an air duct to within a
distance from the working face of 5 times the square root of the roadway cross-section,
measured in meters.

85 NPW
Article 373
Ventilation Fan Systems

(8) When an auxiliary fan fails to function all workers shall be prohibited from entering any
place ventilated by the fan until the said place is declared safe following an inspection by
the operational supervisor.
(9) Compressed air may not be used solely for ventilation except in narrow and steep raises.
(10) Air for ventilation in raises shall be provided such that the flow can be controlled from
a valve at the foot of the raise. Development raises shall be provided with two air valves,
one at the foot of the raise and one at the end of the steel pipe inside.
(11) Ventilation pipes for raises must be independent of service pipes and fitted at the outlet
with a diffuser.
(12) Where compressed air is used for ventilation the air shall be sampled at monthly
intervals to determine CO, NO2 and oil mist content No air shall be used if the analysis
exceeds the limits specified in paragraph 2 of Article 370.

86 NPW
Article 374
Ventilation Circuits
(1) The main intake airway and the main return airway shall be made in separate shafts or
adits.
(2) The Chief Mine Inspector may grant exemption of the requirements in Paragraph (1).
(3) Ventilation in the shaft may only be made with the following provisions :
a. vent tubing may be used at the same opening at the time of development of the shaft or slope and
b. the intake airway and return airway at the single shafts shall be provided with air curtains.
(4) Fresh air that enters through the downcast shaft shall be properly distributed to all work
places as required.
(5) Where any abnormality occurs to the ventilation circuit or any abnormal change occurs
in the flow of air, the underground mine workers shall inform the operations supervisor.
(6) All airways shall be kept clear to permit free passage of air.

87 NPW
Article 375
Prevention of Air Leakage
(1) Any shaft or outlet to the surface that is corrected via a drift to ventilation fans at the surface and
which are normally used for hoisting or transportation shall be fitted with efficient air locks and be
well maintained.
(2) Every drift which connects main intake airways to the main return airway or which connects the
intake and return airways shall be fitted with two adequate doors and shall be well maintained to
reduce leakage of air to a minimum. Where this is not possible other means must be used.
(3) Any drift which requires prevention from short circuiting of air flow shall be fitted with no less than
two adequate doors and be well maintained. Where this is not possible one door is allowable with
one or two ventilation curtains.
(4) A space shall be provided between the ventilation door or ventilation curtain in order that when one
door or ventilation curtain is opened the other door or ventilation curtains closed to prevent air
from passing.
(5) Ventilation doors shall be capable of closing automatically and ventilation curtains must be
fireproof.

88 NPW
Article 375
Prevention of Air Leakage
(6) It is prohibited to prop a ventilation door open except where and for so long as it is
necessary to allow a vehicle to pass through it. Any door no longer required to be shut
shall be removed and placed in a position in which it will not obstruct the airflow.
(7) Every person shall properly close any door or ventilation curtain through which he/she
passes.
(8) Only authorized employees shall change ventilation regulators.

89 NPW
Article 376
Ventilation Plans
Apart from the requirements of Article 19, the ventilation plan shall include the following
information :
a. the name of the mine and
b. the most up-to-date map or series of maps with the scale no larger than I : 5000, and which
includes :
1) the direction and distribution of airflow:
2) the location of the main ventilation fan, the booster ventilation faq and auxiliary fans;
3) the location ofthe air regulator doors, stoppings, and ventilation doors:
4) the location of undercasts or overcasts, and other crossings;
5) the location of seals at abandoned work site areas;
6) the location ofareas not ventilated;
7) the location of workshops, fuel storage areas, the hoist room, compressors, battery charging rooms, and explosive
magazines and
8) air measuring stations and the latest ventilation measurements taken.
c. data on the main fan, the booster fan and auxiliary fans including the name of the
manufacturer, the type, the size of the fan, the speed of the fan, the size of the blades, pressure
at several points and motor brake horsepower rating;
d. the number and type of vehicles using fuels underground including the horsepower of the said
machines and
e. any other information requested by the Chief Mine Inspector.
90 NPW