OPGS POWER GUJARAT PVT LTD Doc No:

2 X 150 MW TPP OPGS/0/GNL/PEF/08/002


Rev Rev
Doc title COAL USAGE PLAN SEPTEMBER 2017 0 05/10/2017
No Dt.

DESCRIPTION Unit #1 Unit #2


Unit Load in MW 130 130
Turbine heat rate 2156 2100
Boiler Efficiency 83% 83%
Unit Heat rate 2597 2530
Boiler Efficiency for low CV coal 82% 82%
Unit Heat rate 2629 2560
Unit Heat rate with 1% make up 2656 2586

UNIT # 1
Target Achieved Target Achieved Target Cost of Achieved Cost of
Date Coal
SCC SCC HR HR Gen Gen
50:30:20; 4200 : 4800 : 3200
6/10 to
(BB & GR+GM ) + Evangelia + 0.66 2656 2.63
31/10
Lignite

UNIT # 2
Target Achieved Target Achieved Target Cost of Achieved Cost of
Date Coal
SCC SCC HR HR Gen Gen
50:30:20; 4200 : 4800 : 3200
6/10 to
(BB & GR+ GM ) + Evangelia + 0.66 2656 2.65
31/10
Lignite

STOCK STATEMENT
Sl. no Shipment name Plant stock Port Stock CV Cost / MT Remark
1 MV BALTIC BEAR 4433 0 4636 4202
2 MV EVANGELIA PETRAKIS 5804 - 4700 4493
3 LIGNITE 5800 - 3244 2625
4 MV GREAT RAINBOW 4833 25167 3800 3872
5 MV GLOVE MAPLE 0 40000 4000 4542

Movement and total consumption


Sl. no Shipment name Daily movement Daily Consumption Total consumption Remark
1 MV BALTIC BEAR 2000 1997.62 3995.23
2 MV EVANGELIA PETRAKIS 4000 1259.28 33568.18
3 LIGNITE 1000 840 22378
4 MV GREAT RAINBOW 2500 2098.81 30432.70
5 MV GLOVE MAPLE 2500 2046.96 22378.79

UNIT I INPUT UNIT II INPUT


GENERATION 135.00 MW GENERATION 135.00 MW
KCAL/K KCAL/K
UNIT HEAT RATE 2656.00 UNIT HEAT RATE 2656.00
G G
DESIGN GCV 4300.00 GCV DESIGN GCV 4300.00 GCV
RATIO 50 30 20 % 50.0 30.0 20.0
RATIO %
0 0 0
KCAL/K
AVAILABLE GCV 3996 4636 3244 KCAL/K
G AVAILABLE GCV 3927 4636 3244
G
COST OF FUEL PER MT 4251 4493 2623 RS
COST OF FUEL PER MT 4251 4493 2623 RS

UNIT I DESIGN OUTPUT


UNIT II DESIGN OUTPUT
EQUIVALENT COAL REQUIRED 2131.33 MT
EQUIVALENT COAL REQUIRED 2149.67 MT
KCAL/K
AVERAGE GCV 4037.60 KCAL/K
G AVERAGE GCV 4003.15
G
EQUIVALENT COAL REQUIRED 1065 639 426 MT 1074
EQUIVALENT COAL REQUIRED 644 429 MT
MILLS 2 1 1 NOS .
MILLS 2 1 1 NOS
FEEDING RATE PER Hr. PER MILL 22.2 26.6 17.7 MT
GENERATION COST ON COAL FEEDING RATE PER Hr. PER MILL 22.3 26.8 17.9 MT
2.63 RS
ALONE GENERATION COST ON COAL
2.65 RS
ALONE
OPGS POWER GUJARAT PVT LTD Doc No:
2 X 150 MW TPP OPGS/0/GNL/PEF/08/002
Rev Rev
Doc title COAL USAGE PLAN SEPTEMBER 2017 0 05/10/2017
No Dt.