Outcomes
As Designed Level of Attainment
Enumerate expected outcomes as indicated Per outcome, describe the extent to which
in the approved Project Document such outcomes have been achieved by the
project
Page 1 of 7
Attachment C
Performance as of the periodas per signed contract(Use separate sheet using the format
below)
Elapsed time : ____ ( no. of months since start date/total number of months within contract
period)
Payme Deliverab Actual Physical Weighted Varian Explanat Action Milesto
nt les funds accompli physical ce ion of Relating ne
schedu (per released / shment accomp Variance to target
le approved % disbursed (%) Variance for
(per proposal, Next
approv WFP or Period
ed MOA) as
propos specifi
al or ed in
work project
or 100% contrac
financi P300,000 20% t,
a plan 20% includi
CDA
or ng the
Certificat
MOA) 100% Varianc
e of
l e
registrati
on for 5
P cooperati
300,0 ves
00
(20%) 5 coops
with PSP
on
microfina
nce
(E.g.: To
be
accomplis
hed in
the next
milestone
period.
Overall
physical
accomplish
ment
Other Activities
Enumerate activities undertaken that were not mentioned in the Project Workplan but were undertaken
to achieve project objectives. Explain how such activity(ies) contributed to the accomplishment of
expected outcomes.
Page 2 of 7
Attachment C
Sustainability
What mechanisms and organizational arrangements are being established to sustain the project and its
benefits after DAR assistance? Describe the specific measures to ensure sustainability in terms of the
human/financial resource, institutional or technical aspects. Are there functional and sustained ARB/
ARC organizations for support services delivery?
Promotional Activities
Describe what promotional activities were conducted to promote the project and inform the general
public. Also state what form of medium was used (i.e. signages, flyers, leaflets, other print media,
radio, television). If print media, flyers or leaflet was utilized, submit to DAR-SSO/ DARPO a copy
of the clipping, the flyer or the leaflet.
Page 3 of 7
Attachment C
Financial Reports
See Expenditure Report format
Page 4 of 7
Attachment C
Page 5 of 7
Attachment C
Page 6 of 7
Attachment C
b.1 Potable Water Supply System (when safe No. of units provided
water is not available
in the project site/production facilities) No. of organizations involved
b.1.1 Site Validation No. of site validation conducted
b.1.2 Stakeholder consultation on project design No. of consultation meetings conducted
b.1.3 Pre-construction Consultation with project No. of pre-construction/installation
stakeholders to present the approved design & meetings conducted
program of works
b.1.4 Supervision and monitoring during water No. of field visits
system installation
Feedback:
Certified Correct: _____________________________________________
Name & Signature of Partner Authorized Representative/ Date
Attested by: _____________________________________________
Name & Signature of Partner Organizations BOD/ Date
Page 7 of 7