Çeli̇k Yapilarin Sap2000 Programi İle Anali̇z Ve Tasarimi PDF
Çeli̇k Yapilarin Sap2000 Programi İle Anali̇z Ve Tasarimi PDF
Sinem KOCABA
ADANA, 2005
UKUROVA NVERSTES
FEN BLMLER ENSTTS
Sinem KOCABA
Not: Bu tezde kullanlan zgn ve baka kaynaktan yaplan bildirilerin, izelge, ekil ve
fotoraflarn kaynak gsterilmeden kullanm, 5846 sayl Fikir ve Sanat Eserleri Kanunundaki
hkmlere tabidir.
Z
Sinem KOCABA
UKUROVA NVERSTES
Anahtar Kelimeler: elik yaplar, SAP2000, tayc sistem tasarm, ereve, kafes
kiri
I
ABSTRACT
MsC THESIS
Sinem KOCABA
UNIVERSITY OF CUKUROVA
The widespread using area of the steel especially for industrial and multi-
storey buildings in our country is increasing. The continuous usage of the steel
generates the necessity of using technological developments for analysis, design and
practice.
In this thesis study, a truss beam-column frame system and single story
gabled frame system and two storey building have been analyzed, designed and
projected. Industrial buildings have been analyzed and designed under static loads
(dead and snow) and wind loads. Two storey building has been analyzed and
designed under static loads (dead and live) and seismic loads. Analysis and design of
constructions are executed with the aid of general purpose SAP2000 computer
program, which use finite elements method for analysis.
Key Words: Steel constructions, SAP2000, Design of carrier system, frame, truss
II
TEEKKR
III
NDEKLER SAYFA
Z ............................................................................................................................... I
ABSTRACT ............................................................................................................... II
TEEKKR .III
NDEKLER ........................................................................................................IV
TABLOLAR DZN ........................................................................................... . VII
EKLLER DZN ............................................................................................. VIII
1.GR ........................................................................................................................ 1
1.1 Program ve kullanm....................................................................................... 1
1.2 Tasarm admlar .............................................................................................. 2
2. NCEK ALIMALAR...................................................................................... ..4
3. MATERYAL VE METOD .................................................................................... ..5
3.1 Materyal ........................................................................................................... 5
3.2 Metod ............................................................................................................... 5
4. KAFES KR KOLON EREVE SSTEM ...................................................... ..7
4.1 Sisteme Ait Bilgileri......................................................................................... 7
4.2 Makasa Ait Bilgiler .......................................................................................... 7
4.3 Yk Analizi ...................................................................................................... 8
4.3.1 Dm Noktas Yklerinin Hesab......................................................... 9
4.3.2 Malzeme.................................................................................................. 9
4.4 Sistemin SAP2000 de Oluturulmas ve zm......................................... 10
4.5 Makas Elemanlar Kesit Tahkiki................................................................... .26
4.6 Kolon Kesiti Tahkiki..................................................................................... .27
4.7 Ak Hesab ................................................................................................... .30
4.7.1 Ara Ak Hesab ................................................................................... .30
4.7.1.a Gergisiz Hesap ............................................................................ .30
4.7.1.b ift Gergili Hesap ....................................................................... .31
4.7.2 Mahya A ......................................................................................... .32
4.7.3 Gergi Hesab......................................................................................... .33
4.7.4 Ak zerindeki Ek Yerinde Hesap ..................................................... .34
4.8 Alt balk ubuu zerinde ek yerinde hesap................................................ .35
IV
4.9 Dm Noktalar Birleim Hesab................................................................ .36
4.10 Kren Kirii Hesab....................................................................................... .38
4.11 Kren Konsolu Hesab .................................................................................. .40
4.12 Temel Hesab .............................................................................................. .41
5. DOLU GVDEL EREVE SSTEM .............................................................. 47
5.1 Sisteme Ait Bilgiler....................................................................................... .47
5.2 Makasa Ait Bilgiler ....................................................................................... .47
5.3 Yk Analizi ................................................................................................... .48
5.3.1 Dm Nokta Yklerinin Hesab......................................................... .49
5.3.2 Malzeme............................................................................................... 49
5.4 Sistemin SAP2000de Oluturulmas ve zm ........................................ .50
5.5 Ak Hesab ................................................................................................... .59
5.5.1 Ara Ak ............................................................................................... .59
5.5.1.a Gergisiz Hesap ............................................................................ .60
5.5.1.b ift Gergili Hesap ....................................................................... .61
5.5.2 Mahya A ......................................................................................... .62
5.5.3 Gergi Hesab......................................................................................... .63
5.5.4 Ak zerindeki Ek Yerinde Hesap ..................................................... .64
5.6 Dm Noktas Birleim Detaylar............................................................... .65
5.6.1 Ke Birleim Detay ........................................................................... .65
5.6.2 Mahya Detay ....................................................................................... .70
5.7 Temel Hesab ................................................................................................ .73
6. OK KATLI KR KOLON EREVE SSTEM ............................................. 76
6.1 Sisteme Ait Bilgiler........................................................................................ 76
6.2 Yk Analizi .................................................................................................... 77
6.2.1 Zemin Kat Deme Yk...................................................................... 77
6.2.2 1. Kat Deme Yk ............................................................................. 79
6.2.3 Kolon yk............................................................................................ 80
6.2.4 Deprem Hesab...................................................................................... 80
6.3 Sistemin SAP2000de Oluturulmas ve zm ......................................... 82
6.4 Detaylar .......................................................................................................... 94
V
6.4.1 B Detay ................................................................................................ 94
6.4.2 A Detay ................................................................................................ 97
6.5 Temel Hesab ................................................................................................. 99
7. SONULAR VE NERLER ........................................................................... ..102
KAYNAKLAR ........................................................................................................ 106
ZGEM ............................................................................................................. 107
EKLER
VI
TABLOLAR DZN SAYFA
VII
EKLLER DZN SAYFA
VIII
ekil 4.29 2 Nolu Dm Noktas Detay ................................................................. 36
ekil 4.30 12 Nolu Dm Noktas Detay ............................................................... 37
ekil 4.31 14 Nolu Dm Noktas Detay ............................................................... 37
ekil 4.32 Kren Kirii ve Konsolu ............................................................................. 38
ekil 4.33 Kolon Ayann Tekili ............................................................................ 41
ekil 4.34 M30 Bulonu Detay .................................................................................. 41
ekil 5.1 Makas Kesiti ve Plan ................................................................................. 47
ekil 5.2 Rzgar Yknn Etkisi............................................................................... 48
ekil 5.3 Makas Eleman simleri ............................................................................... 50
ekil 5.4 Makas Eleman Kesitleri.............................................................................. 52
ekil 5.5 z arlk Yklemesi .................................................................................. 53
ekil 5.6 Tam Kar Yklemesi.................................................................................... 53
ekil 5.7 Yarm Kar Yklemesi ................................................................................. 54
ekil 5.8 Rzgar Soldan Yklemesi........................................................................... 54
ekil 5.9 Rzgar Sadan Yklemesi.......................................................................... 55
ekil 5.10 Kolon temel balants mafsallyken kesit yeterlilii ............................... 58
ekil 5.11 Kolon temel balants ankastreyken kesit yeterlilii............................... 58
ekil 5.12 M3 Diyagram........................................................................................... 59
ekil 5.13 Gergisiz ak yklemesi ............................................................................ 60
ekil 5.14 M3 Diyagram........................................................................................... 60
ekil 5.15 M2 Diyagram........................................................................................... 60
ekil 5.16 ift gergili ak yklemesi ........................................................................ 61
ekil 5.17 M2 Diyagram........................................................................................... 61
ekil 5.18 Mahya A Yklemesi ........................................................................... 62
ekil 5.19 M3 Diyagram........................................................................................... 62
ekil 5.20 M2 Diyagram........................................................................................... 63
ekil 5.21 Aktaki Ekin Tekili ................................................................................ 64
ekil 5.22 Ke dm noktas kesiti ........................................................................ 66
ekil 5.23 Ke dm noktas detay....................................................................... 67
ekil 5.24 Ke dm noktas kesitinde kaynak isimleri ...................................... 68
ekil 5.25 Tepe dm noktas detay ....................................................................... 70
IX
ekil 5.26 Tepe dm noktas kesitinde kaynak isimleri......................................... 71
ekil 6.1 Sistem Plan ................................................................................................ 76
ekil 6.2 Zemin Kat Plan(XY).................................................................................. 82
ekil 6.3 1. Kat Plan(XY) ......................................................................................... 82
ekil 6.4 Zemin Kat ve 1. Kat Eleman Kesitleri(XY) ............................................... 85
ekil 6.5 Zemin Kat ve 1. Kat Eleman Kesitleri(XZ)................................................ 85
ekil 6.6 G (Sabit yk) yklemesi ............................................................................. 87
ekil 6.7 Q (Hareketli yk) yklemesi....................................................................... 87
ekil 6.8 EX ve EY yklemesi................................................................................... 88
ekil 6.9 Zemin ve 1.Kat kiri kesit yeterlilii .......................................................... 90
ekil 6.10 Zemin ve 1.Kat kolon kesit yeterlilii ...................................................... 91
ekil 6.11 Zemin ve 1.Kat kiri kesit yeterlilii(deme kirileri rijit bal) ............ 91
ekil 6.12 Zemin ve 1.Kat kolon kesit yeterlilii(deme kirileri rijit bal) .......... 91
ekil 6.13 D cephede dzenlenmi aprazlar ve kesitleri ....................................... 92
ekil 6.14 aprazl durumda Zemin ve 1.Kat kiri kesit yeterlilii........................... 92
ekil 6.15 aprazl durumda Zemin ve 1.Kat kolon kesit yeterlilii......................... 93
ekil 6.16 B-B Aks M3 Diyagram........................................................................... 93
ekil 6.17 B Detay .................................................................................................... 96
ekil 6.18 A Detay.................................................................................................... 98
ekil 6.19. Kolon Ayann Tekili ........................................................................... 99
X
1.GR Sinem KOCABA
1.GR
1.1.Program ve kullanm
1
1.GR Sinem KOCABA
model zerinde her an deiik yapabilme, analiz sonularn eklen ve saysal olarak
izleyebilme, boyutlandrma da optimizasyon gibi pek ok ileve izin veren kapsaml
bir programdr. Hesap ve detaylarda titizlikle almaya izin vermesinin yannda
tasarm aamasnda oluturulan eleman verilerinin CNC (Computer numerically
controlled) tezgahlarna elektronik ortamda aktarm ile ayn uygulamann farkl
safhalarnda ayn verilerin ilenmesini mmkn klmaktadr. Bylece klasik
sistemlerdeki her i istasyonunda dzenlenmesi gereken belge kalabal ve
getirebilecei sorunlar da ortadan kalkm olmaktadr.
Beklentileri karlayabilmek ve teknolojiyi yakalayabilmek iin, kalifiye
iilerin ve bu konuda alan projecilerin az olmas gibi caydrc sebeplere ramen
elik kullanmn artrmaya, ufku ak bireyler yetimenin de nn amaya ynelik
almalar arasnda yer almasn hedeflediimiz bu tez kapsamnda; elik ile ilgili
mevcut bilgi dzeyini artrmann yannda, elik yaplarn SAP2000 program ile
analizi ve tasarm hakknda da k tutmas amalanmtr.
Bu tezde Trkiyede kullanm yaygnlaan yap tiplerinden gerek hal gerekse
karkas yaplara rnek farkl proje SAP2000 programndan yararlanlarak
zlm ve irdelenmitir. Bu irdelemeler sonucunda analiz ve tasarma ait baz
tespitlerde bulunulmutur.
1.2.Tasarm admlar
2
1.GR Sinem KOCABA
3
2.NCEK ALIMALAR Sinem KOCABA
2.NCEK ALIMALAR
Bu blmde Dnyada yaklak 200 yllk bir gemii olan, Trkiyede ise
ancak 30 yllk bir gemii olan elik yaplar zerine yaplan almalardan bir ka
hakknda ksaca bilgi verilmeye allmtr.
Yalman Odaba (1990), yap sistemlerinin karlatrlmas, elik yap
sistemlerinin gnmzde kullanm, elik malzemenin zellikleri, dier malzemelerle
ekonomik anlamda karlatrlmas gibi konular zerinde durmutur.
okun Bahar (1995), mevcut bir alana uygulanabilecek farkl tayc
sistemleri ekonomi bakmndan karlatrmtr. Bu yaplar komple elik, komple
betonarme(prefabrike), karma sistem (elik at makas ve betonarme kolon) olmak
zere farkl malzeme tiplerinden olumutur. Elde edilen sonulara gre, komple
elik ve prefabrike sistemler arasnda maliyet fark bulunmad, karma sistemlerinse
en ekonomik sistemler olduu grlmtr.
Aya TARTAR (2002)n almasnda konstrksiyon teknolojileri arasnda
yeni bir teknoloji olarak kabul edilen hafif elik konstrksiyon sistemi anlatlmtr.
Tez bu teknolojide kullanlan malzemenin retim teknolojisi, malzemenin statik,
yapsal zellikleri hakknda zet bilgi iermektedir.
Murat Doan ELK (2003)in almasnda, dnyadaki yksek yaplarn
geliimi ile inasnda kullanlan elik malzeme ve yksek yaplarn iskeletini
oluturan eitli ekillerdeki elik tayc sistemler ve bu sistemlerin rijitlik
asndan irdelenmesi amacyla aratrma yaplmtr.
Muhammed Ayhan (2005)n almasnda bir ara kat bulunan deprem
ykleri dikkate alnmadan boyutlandrlm, elik ve betonarme tayc sistemden
oluan mevcut bir uak hangar yapsnn glendirilmesi zerinedir. Mevcut sisteme
dokunmadan tayc sistemde deiiklik yaplarak sneklik dzeyi yksek, sadece
elik tac sistemden oluacak ekilde yatay ve dey ykler altnda statik ve elik
hesaplar yaplm, ilgili imalat izimleri ile birlikte maliyet analizleri de yaplmtr.
4
3.MATERYAL VE METOD Sinem KOCABA
3.MATERYAL VE METOD
3.1.Materyal
3.2.Metod
SAP2000 bir (ubuk), iki (alan) ve (kat cisim) boyutlu elemanlar ile
mhendisin problemlerine cevap verebilmektedir. Genel olarak kullanlan elemanlar
bir boyutlu ubuk (frame) elemanlardr. ubuk elemanlar aslnda sonlu elemanlar
ynteminin zel bir halini temsil eder. En gereki davrana ulaabilmek iin
rnein bir kiri elemannn kat modellemesi yaplabilir veya iki boyutlu alan
elemanlar ile zme ulalabilir. Ancak, bu konuda yaplan teorik almalar
neticesinde belirli bir geometride boyutlu ya da iki boyutlu yapsal elemanlarn bir
boyutlu ubuk elemanlar ile temsil edilebilecei belirlenmitir.
Bu almada da dzlemsel ve boyutlu bina erevelerini modellerken
tayc sistem elemanlar iin ubuk elemanlar kullanlmtr. ubuk eleman
kesitleri seimi iin SAP2000 programndaki profil ktphanesinden yararlanlmtr.
almada ilk olarak tek aklkl kafes kiri- kolon erevesinin zm iin tasarm
admlar izlenerek SAP2000 program ile kesit tesirleri elde edilmi ve kesit tahkikleri
5
3.MATERYAL VE METOD Sinem KOCABA
yaplmtr. eitli kontroller ve hesaplar ile ekonomik ve gvenli olacak ekilde kesitler ve
elemanlar seilmitir. Yap temeline ait hesaplar deCADle, analiz ve boyutlandrma
sonrasnda uygulama projeleri ise AutoCAD program ile hazrlanmtr. Dolu gvdeli
ereve sisteminde ve iki katl kiri- kolon ereve sisteminde de ayn sra izlenmitir.
6
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
7
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
4.3.Yk Analizi
E F
=8.53
CA=+0.8
Rzgar
yn CB=-0.4
h
A B
CE=(1.2sin-0.4)
CF=-0.4
8
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
z arlk:
at rts+Ak+at makas =30 kg/m2
g=30.6,00.2,00=360 kg=0,360 t. g/2=0,180 t.
Tam kar yklemesi:
k=75 kg/m2 ; k=75.6,00.2,00=900 kg=0,900 t. ; k/2=0,450 t.
Yarm kar yklemesi:
yk=75 kg/m2 ; yk=75.6,00.2,00=900 kg=0,900 t. ; yk/2=0,450 t.
Rzgar yklemesi:
rsol-E=Pwe=Pre.a1.L=-17,80.2,02.6,00=-215,74 kg=-0,216 t. Pwe/2=0,108 t
rsol-F= Pwf=Prf.a1.L=-32,00.2,02.6,00=-387,84 kg=-0,388 t. Pwf/2=0,194 t.
rsol-A=Pwa=Pra.L=-64,00.6,00=-384 kg/m
rsol-B=Pwb=Prb.L=32,00.6,00=192 kg/m
rsag-E=Pwe=Pre.a1.L=-32,00.2,02.6,00=-387,84 kg=-0,388 t. Pwe/2=0,194 t.
rsag-F= Pwf=Prf.a1.L=-17,80.2,02.6,00=-215,74 kg=-0,216 t. Pwf/2=0,108 t.
rsag-A=Pwa=Pra.L=32,00.6,00=192 kg/m
rsag-B=Pwb=Prb.L=-64,00.6,00=384 kg/m
Kolon zati yklemesi:
g=0.0124.8.00.7.850=0.78t.
Kren yklemesi: (kren kirii hesabndan)
vsol=vsag=-12.33(+z ynnde) ; -1.233(+x ynnde)
4.3.2.Malzeme
elik : ST37 em
H
= 1.44t / cm 2 em
HZ
= 1.15 1.44 = 1.66t / cm 2
em
H
= 0.83t / cm 2 em
HZ
= 0.95t / cm 2
Kaynak kem
H
= 1.10t / cm 2
Betonarme : Temel : Beton : B160 elik : S420 (ST III)
Zemin : zem = 1.0t / cm 2
9
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
1. Sap2000 ekran aldnda nce sa alt kede birim Ton,m olarak ayarlanr.
2. Yeni bir sistem oluturmak iin;
i) File New Model seilir. Alan pencerede Select Template2D Trusses
seilir.
ii) Alan pencerede 2D Truss Type Praft Truss seilir.
iii) Boluklar doldurulur. L1=L2=12 ; H1=H3=0.6 ; H2=2.4 ; N1=N2=6 ve
onaylanr.
3. Ekrana gelen makastaki diyagonallerin tam tersi dzenlenmesi iin;
i) Diyagonaller seilir, EditDelete ile silinir.
ii) DrawDraw Frame seilir. stenilen ekilde noktadan noktaya diyagonaller
izilir.
4. Dosyay saklamak iin; FileSave ile dosyay proje 1 adyla kaydederiz.
5. Malzeme tanmlamak iin;
i) DefineMaterials STEELModify/Show Material seilir.
ii) Material Name: ST37 ; Modulus of Elasticity=21e6 ; Fy=24000 ;
Fu=37000 olarak deitirilir ve onaylanr.
10
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
iii) Add New Material seilir. Alan pencerede Material Name: ST44 ; Modulus
of Elasticity=21e6 ; Fy=29600 ; Fu=44000 yazlr ve onaylanr.
6. Kesit tanmlamak iin;
i) DefineFrame Sections seilir.
ii) Alan pencerede Choose property type to Add Import Double
AngleAdd New Property seilir.
iii) Alan pencerede Konum ksmndaki listeden C/Program Files/Computer and
Structures/SAP2000 9/EURO.PRO seilir. Section Labels bal altndaki
listeden CTRL tuu kullanlarak 2L50X5/10/ ; 2L60X6/10/ ; 2L70X7/10/ ;
2L80X8/10/ ; 2L90X9/10/ ; 2L100X10/10/ kesitleri seilir ve onaylanr.
iv) Material alr listesinden ST37 iaretlenir.
v) Choose property type to Add Import I/Wide FlangeAdd New Property
seilir.
v) Alan pencerede Konum ksmndaki listeden C/Program Files/Computer and
Structures/SAP2000 9/EURO.PRO seilir. Section Labels bal altndaki
listeden HE240-A ; HE300-A ; HE320-A kesitleri seilir ve onaylanr.
vi) Material alr listesinden ST44 iaretlenir.
7. ubuklara O1-O12 ; V1-V13 ; U1-U12 ; D1-D12 eklinde isim vermek iin;
i) ViewSet Display Options seilir.
ii) Alan pencerede Frame bal altnda Labels kutusu iaretlenir.
iii) Grnen ubuk eleman numaralarna gre, nce 26-37 aras seilir.
iv) EditChange Labels seilir.
v) Alan pencerede Item Type Element Labels-Frame seilir. Prefix : 0
yazlr; First Relabel Order X seilir ve EditAuto Relabel seilirse
ubuklar O1 den O12 ye sralanm olur.
vi) Ayn ilemler srasyla; 1-13 aras ; 14-25 aras ; 50-61 aras seilerek
yaplrsa istenilen sralamalar ve isimlendirmeler yaplm olur.
11
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
12
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
iii) Ayn ekilde V1 den V13 e elemanlar iin DIK ; U1 den U12 ye elemanlar
iin ALT ; D1 den D12 ye elemanlar iin DIA gruplar oluturulur.
11. Yklemeleri tanmlamak iin;
i) DefineLoad Cases seilir.
ii) Alan pencerede,
Load Name Type Self Weight Multiplier
g DEAD 0 Modify Load
k SNOW 0 Add New Load
yk SNOW 0 Add New Load
rsol WIND 0 Add New Load
rsag WIND 0 Add New Load
vsol DEAD 1 Add New Load
vsag DEAD 1 Add New Load ve onaylanr.
**Yk analizine ubuk elemanlarn zati arlklarn da eklediimiz iin self weight
multiplier sfr yaplmaldr ki zati arlklar 2kez hesaba katlmasn.
12. g yklemesine ait Analysis Case Name : g olmas iin;
i) DefineAnalysis Cases seilir.
ii) Alan pencere Case Name DEADModify/Show Case seilir ve alan
pencerede Analysis Case Name : g yazlr ve onaylanr.
iii) Ayn pencerede, Modal analiz yaplmad iin,
Case Name MODALDelete Case seilir.
13. Kolon ve kren konsolunu eklemek iin;
i) Yeni akslar eklemek iin DefineCoordinate/Grid SystemModify/Show
System seilir.
ii) Alan pencerede, X Grid Data bal altndaki tabloda
a) Ordinate : 11.42 ve -11.42 olmak zere 2 satr eklenir.
b) Z Grid Data bal altndaki tabloda Ordinate : -8.00 ve -2.80 olmak
zere 2 satr eklenir.
c) Reorder Ordinates dmesine baslr ve onaylanr.
14. Dosyay saklamak iin; FileSave seilir.
13
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
14
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
15
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
16
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
17
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
vii) O9 ve O10 ubuklar seilir, 20ideki yolla, Point Loads bal altndaki ksm
Distance 0 0.25 0.75 1
Load 0.216 0 0 0.216 olarak dzenlenir.
viii) O11 ubuu seilir, 20ideki yolla, Point Loads bal altndaki ksm,
Distance 0 0.25 0.75 1
Load 0 0 0 0.108 olarak dzenlenir.
ix) S11 ve S12 ubuklar seilir. AssignFrame LoadsDistributed seilir.
a) Alan pencerede Load Case Namersag seilir
b) Load Type and Direction bal altnda Coord SysGLOBAL ;
DirectionX seilir.
c) Uniform Load bal altnda, Load : -0.192 yazlr.
x) S21 ve S22 ubuklar seilir. AssignFrame LoadsDistributed seilir.
a) Load Type and Direction bal altnda Coord SysGLOBAL ;
DirectionX seilir.
b) Uniform Load bal altnda, Load : -0.384 yazlr.
21) vsol yklemesi iin;
18
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
19
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
20
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
21
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
22
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
23
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
24
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
ekil 4.15 Belli bir listeye gre program tarafndan atanan kesitler ve yeterlilikleri
25
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
Analysis and design sections differ for 43 steel frames. Do you want to
select them? yazs grlr. Eer 2.ileti grldyse, 1.ileti grlene kadar
Run Analysis, ardndan Start Design/Check of Structure ve Start
Design/Verify Analysis vs Design Sections seimleri tekrarlanr.
ix) stenirse kesitler deitirilebilir. rnein alt balk ubuklarnn ayn kesitli
olmas isteniyorsa U1, U2, U11 ve U12 elemanlar seilerek 2L70X7/10/
atanmaldr.
x) Design ettikten sonra herhangi bir eleman seip saa tkladmzda alan
pencerede Analysis Section ksmnda yazan, analize balarkenki kesit olup;
Design Section ksmnda yazansa programn uygun grp atad kesittir.
Bu iki ksmda geen kesit ayn olana kadar iterasyon yaplr.
xi) Nihayi kesit seimi iin kullanlabilecei gibi n seim amal da
kullanlabilecek bu yntem programn kullanl zelliklerinden biri.
26
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
=w.Smax/F=4,39.3,51/13,82=1,11<1,44 t/cm2
Dikme
Smax=SV1=-7,56 t.
2L50X5/10/ F=4,80.2=9,60 cm2 ix=iy=1,51 =Sk/i=60/1,51=39,7 w=1,14
=w.Smax/F=1,14.7,56/9,60=0,90<1,44 t/cm2
Smax=4,41 t.
2L50X5/10/ F=4,80.2=9,60 cm2
=Smax/F=4,41/9,60=0,46<1,44 t/cm2
Basn ubuklarnda burkulmaya kar hesap,
P(t.) l =Sk/i l/3 (/2)imin 50imin
U3 -22.93 202 202/2.74=74 67 - 137
2 ad. 100.100.10 plaka 202/3=67~65cm ara ile eklenmelidir.
D4 -1.18 250 250/1.82=137 83 125 -
D5 -2.46 269 269/1.82=148 90 135 -
D6 -3.51 290 290/1.82=159 97 145 -
2 ad. 70.70.10 plaka l/3 ara ile eklenmelidir.
V1 -7.56 60 60/1.51=40 20 - 75.5
V2 -4.62 90 90/1.51=60 30 - 75.5
V3 -2.52 120 120/1.51=79 40 - 75.5
V4 -1.01 150 150/1.51=99 50 - 75.5
2 ad. 60.60.10 plaka l/3 ara ile eklenmelidir.
27
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
t1 d1/3
d1
ekil 4.16 Kolon Kesit tesirleri ekil 4.17 Kolon kesitinde burkulma blgesi
28
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
iyb=(3488/50.69)=8.30cm
N=20.66 t. eb=N/F=20.66/124=0.166=166 kg/cm2
x=Skx/ix=520/13.6=38 w=1,13
bem=1660/1.13=1469 kg/m2 eb/bem=166/1469=0.11<0.15
bx=Max Mx/Wx=1921000/1479=1239 kg/cm2
yb=Sky/iyb=300/8.30=36 w=1.11
2
M M
Cb=1.75-1.05 1 +0.3 1
M2 M2
2
7.11 7.11
Cb=1.75-1.05 +0.3 =1.37<2.3
17.10 17.10
S ky 3 10 7 C b 2 a * b2
yb = ise B= *a
i yb a 3 9 * 10 C b
7
S ky 3 10 7 C b 10 5 C b
yb = ise B=
i yb a b2
S ky 3 10 7 1.37
yb = = 131 36
i yb 2400
2 a * b2
B = *a
3 9 * 10 C b
7
2 2400 * 36 2
B = * 2400 = 1540kg / cm
2
3 9 * 10 1.37
7
Fb 84 10 4 C b
B =
S ky h
50.69 84 10 4 1.37
B= = 6272kg / cm 2
300 31
6272kg/cm2 > 1540kg/cm2
6272kg/cm2 > 0.6*2400=1440kg/cm2
B=1440kg/cm2
(eb/bem)+(bx/B)=(166/1469)+(1239/1440)=0.97<1 kesit yeterlidir
29
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
4.7.Ak Hesab
4.7.1.Ara Ak Hesab
4.7.1.a.Gergisiz Hesap
30
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
0.027 6 4
f y = 2.48 = 2.40cm > 2.00cm
36.2
31
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
0.178 6 4
f x = 2.48 = 1.00cm
573
f y 0 (gergiden dolay)
L 600
f = ( f x2 + f y2 ) = 1.00cm < = = 2.00cm
300 300
4.7.2.Mahya a
q x 178
qx ' = = = 89kg / m
2 2
qy 27
qy '= = = 13.5kg / m
2 2
32
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
4.7.3.Gergi Hesab
33
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
67400
= = 883kg / cm 2 1440kg / cm 2 (kaynak ekme emniyet gerilmesi)
81.9 I'k g=105
a g=5.7
I140
h
I'k b
4.150
b L=90 L(b L )=90
90.10.150
Z
=
Flama
5.03
= = 0.56t / cm 2 1.44t / cm 2
(1 9)
Ek lamasn profile balyan kaynak dikilerinin hesab
3mm a=4mm 0.7tmin=0.7x8.6=6mm
34
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
Z
l1 =
2 a1 kem
5.03
l1 = = 5.7cm
2 0.4 1.10
15a1 = 15 4 = 60mm l1 100a1 = 100 4 = 400mm l1 = 71olsun
l ' kay = l1 + a1 = 71 + 4 = 75mm
llev = 2 l1 ' = 150mm
Balk ek levhas 90.150.10 ; a1=4mm
Gvde kaynak dikilerinde gerilme hesab
I140 h-2c=105 mm
l 2 ' = 105mm a 2 = s = 5.7 mm
l 2 ' = 105 2 5.7 = 93.6mm
c 9.36
kay = M = 58.3 = 0.48t / cm 2
2I x 2 573
Q
kay =
Fkay
0.178 6.00
kay = = 0.20t / cm 2 0.90t / cm 2
5.34
2L70.70.7/10 100.270.10
4-270
35
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
6*5.03=1.97*l2 l2=15.3cm
O1=-15.57 t. O2-O1=21.23-15.57=5.66 t.
O3-O2=22.93-21.23=1.70 t.
O4-O3=22.65-22.93=-0.28 t.
O5-O4=21.23-22.65=-1.42 t.
O6-O5=19.11-21.23=-2.12 t.
ve O6=19.11t iin,
ekil 4.29 2 Nolu D.N.detay
3mma=4mm0.7tmin=0.7*9=6.3mm
lmin=15a=60mm l1= 60mm 100a=400mm olsun.
6*6.46=2.54*l2 l2=15.3cm
36
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
D1=16.08 t. iin,
3mm a=3mm 0.7tmin=0.7*6=4.2mm ;
lmin=15a=45mm l1= 70mm 100a=300mm olsa
7*4.31=1.69*l2 l2=17.9cm
4.5*4.31=1.69*l2 l2=11.5cm
V1=-7.56 t. ; V2=-4.62 t. ;
V3=-2.52 t. ; V4=-1.01 t. ;
V5=0.76 t. ; V6=1.65 t. V7=4.41 t. iin,
3mm a=3mm 0.7tmin=0.7*5=3.5mm ;
lmin=15a=45mm l1= 45mm 100a=300mm olsa
4.5*3.60=1.40*l2 l2=11.6cm
k= N/Fk=7.56/(2*0.3*(11.6+4.5))=0.78<1.10 t/cm2
l1=4.5+2*0.3=5.1cm >> l1=55mm ; 4.31 14 Nolu D.N.detay
37
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
38
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
39
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
e=0,425-(0,31/2)=0,27 m
Mmax=Pmax*e=12,33*27=333 tcm
IPBL320 kren konsolunu seelim.
Balk ve gvde kaynak kalnlklar:
a1=6mm< 0,7tmin=0,7*15,5=11 mm
a2=6mm< 0,7tmin=0,7*9=6,3 mm
l1'=300 mm l1=300-2*6=288 mm
l2'=118 mm l2=118-2*6=106 mm
l3'=235 mm l2=235-2*6=223 mm
Ikaynak=2*28,8*0,6*16,32+4*10,6*0,6*14,22+2*0,6*22,33/12=15421 cm4
Wkaynak=15421/16,6=929 cm3
maxkaynak=Mmax/Wkaynak=333/929=0,36 < 1,44 t/cm2
40
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
Gvde kaynaklarnda;
maxkaynak=Pmax/S(a*l)=12,33/26,76=0,46 < 0,90 t/cm3
Maximum kaynak gvde gerilmesi
maxkaynak=Mmax*k/Ikaynak=333*11,1/15411=0,24 < 1,44 t/cm2
Gvde kaynak asal gerilmesi;
h=(1/2)(kaynak+(kaynak2+4kaynak2)=(1/2)(0.24+(0.242+4*0.462)=0.60t/cm2<1.10 t/cm2
4.12.Temel Hesab
t1
h1
h1
t
13.44
a4
hk
t'
a2 a2
t
I
B
a2
c1
M30 a1
a3
lk
B
b
M
A/4
Z S H P
c1
a2
I
e1 e1 e1 ez ed A/8
A A
41
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
d=(1/0.86)*{(4/3)*Z/(*em)}=2.5cm 30
taban levhasnn kalnlnn saptanmas;
p=N/(A*B)=20.66/(40*100)=5.2*10-3 t/cm3
t1=10mm olsun c1=(400-300-20)/2=40 mm
M1=p*c12/2=5.2*4.52/2 =52.7 kgcm/cm
M2=p*B*((B/2)-c1)/2=5.2*30((30/4)-4.5)/2=234kgcm/cm
t 2,45*(234/1440)=0.99cm t=20mm
Guse levhas yksekliinin (h1) saptanmas;
P=(S/4)+M/2h
P=(20,66/4)+(17,10*100/(2*31))=33 t. (4dikiten birindeki max zorlanma)
h1 (P/(a1*em))+2a1 (33/(0.7*1,1))+2*0.5=43.9 h1=45cm
Guse levhasn profil balna balayan dikilerde tahkik a1=7mm
kem=P/(a1*(h1-2*a1)=33/(0.7*(45-2*0.7)=1.08 < 1.1 t/cm2
I-I kesitinde kontrol
MD=33*((100-31)/2-100/8)=726 tcm
MZ=12,1*((100-31)/2-10)=297 tcm
Xg=(2*45*1,0*24+40*2,0*1,0)/(2*1,0*45+40*2,0)=13,44 cm
Ix=2*1.0*453/12+40*2.03/12+2*1,0*45*11.062+1,0*40*12.442=38604 cm4
Wx=Ix/33,56=1150 cm3
bmax=726/1150=0,63 t/cm2 < 1,44 t/cm2
Guse levhasn taban levhasna balyan dikilerde tahkik a2=4mm
Q=max(D;Z)=33 t.
Sx=B*t*(y-(t/2))=40*2.0*(13,44-1,0)=995 cm3
kayma=Q*Sx/(Ix*2*a2)=33*995/(38604*2*0.4)=1,06<1,1 t/cm2
Kolon gvdesini taban levhasna balayan dikilerde a3=4mm
k=H/(2*a3*(l '-2*a3) kem
k=3,53/(2*0.4*(20-2*0.4)=0,23 1,1 t/cm2
Ayak korniyerinde tahkik;
Beton gerilmesi kontrol
Ayak korniyeri L100.100.10 lk=200mm Fb=(bk-t')*lk
b=H/Fb=3530/((10-4)*20)=29.4<40 kg/cm2
42
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
Kesit kontrol
M=3.53*(10-4)/2=10.6 tcm W=lk*(bk-t)2/6=20*(10-4)2/6=120 cm3
=M/W=10.6/120=0.09 t/cm2<1,44 t/cm2
Kamay taban levhasna balayan kaynaklar a4=4mm
Ikaynak=2*(20-2*0.4)*0,4*(0.2+5)+2*0.4*(10-2*0.4)3/12)=132 cm4
M=H*e=3,53*7=24,71 tcm
Wk=132/(10/2)=26.4 cm3
k=24.71/26,4=0,94 > 0,75 t/cm2
Fkgvde=2*(bk-2*a4)*a4=2*(10-2*0.4)*0,4=7.36 cm2 M30 bulonu
k=H/Fkg=3,53/7.36=0,48 < 0,75 t/cm2 d=30mm
v=(0.942+0.482)=1.06 < 1.1 t/cm2 C=570mm
Z1'=(2*G2-*(D2+d2)/4)*pem=9423 kg D=76mm
E=60mm
Z2'=p*taem*(D.N+d*(C-N-F)=3537kg
F=15mm
Z'=Z1'+Z2'=12960 kg
G=120mm
Z1=Z/nZ' 12100/312960
a=6mm
Kolon kiri birleim yerinde hesap;
Birleim tek etkili, m=1 ; n=6 (kullanlan bulon says) d=d1=21 (M20 uygun bulon)
P1em,=m*(*d2/4)*a,em =1*(*2.12/4)*1.4=4.85 t.
P1em,l=d*tmin*l,em =2.1*1.0*2.8=5.88 t. P1em=4.85 t.
Gerekli bulon says: n=1.37/4.85~1 n=6 (ift sra) yeterlidir.
zem=em=1,12 t/cm2
n*(*(0,86d)2/4)*zem Z
6*(*(0.86*2.1)2/4)*1.12 =17.21 7.56 t.
43
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
44
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
45
4.KAFES KR-KOLON EREVE SSTEM Sinem KOCABA
D9 No No No No No Yes No No No No No Yes
U1 No No No No No Yes No No No No No No
V1 No No No No No Yes No No No No No Yes
V2 No No No No No Yes No No No No No Yes
V3 No No No No No Yes No No No No No Yes
V4 No No No No No Yes No No No No No Yes
V5 No No No No No Yes No No No No No Yes
V6 No No No No No Yes No No No No No Yes
V7 No No No No No Yes No No No No No Yes
V8 No No No No No Yes No No No No No Yes
V9 No No No No No Yes No No No No No Yes
D10 No No No No No Yes No No No No No Yes
D11 No No No No No Yes No No No No No Yes
D12 No No No No No Yes No No No No No Yes
U12 No No No No No No No No No No No Yes
V10 No No No No No Yes No No No No No Yes
V11 No No No No No Yes No No No No No Yes
V12 No No No No No Yes No No No No No Yes
V13 No No No No No Yes No No No No No Yes
Tablo 4.5 ubuk Ular art
46
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
47
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.3.Yk Analizi
E F
=8.53
CA=+0.8
Rzgar
yn CB=-0.4
h
A B
CE=(1.2sin-0.4)
CF=-0.4
48
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
z arlk:
at rts+Ak+at makas =30 kg/m2
g=30.6,00.2,00=360 kg=0,360 t. g/2=0,180 t.
Tam kar yklemesi:
k=75 kg/m2 ; k=75.6,00.2,00=900 kg=0,900 t. ; k/2=0,450 t.
Yarm kar yklemesi:
yk=75 kg/m2 ; yk=75.6,00.2,00=900 kg=0,900 t. ; yk/2=0,450 t.
Rzgar yklemesi:
rsol-E=Pwe=Pre.a1.L=-17,80.2,02.6,00=-215,74 kg=-0,216 t. Pwe/2=0,108 t
rsol-F= Pwf=Prf.a1.L=-32,00.2,02.6,00=-387,84 kg=-0,388 t. Pwf/2=0,194 t.
rsol-A=Pwa=Pra.L=-64,00.6,00=-384 kg/m
rsol-B=Pwb=Prb.L=32,00.6,00=192 kg/m
rsag-E=Pwe=Pre.a1.L=-32,00.2,02.6,00=-387,84 kg=-0,388 t. Pwe/2=0,194 t.
rsag-F= Pwf=Prf.a1.L=-17,80.2,02.6,00=-215,74 kg=-0,216 t. Pwf/2=0,108 t.
rsag-A=Pwa=Pra.L=32,00.6,00=192 kg/m
rsag-B=Pwb=Prb.L=-64,00.6,00=384 kg/m
Kolon zati yklemesi:
g=0.0239*7.850=188 kg/m=0.188 t/m
5.3.2.Malzeme
elik : ST37 em
H
= 1.44t / cm 2 em
HZ
= 1.15 1.44 = 1.66t / cm 2
em
H
= 0.83t / cm 2 em
HZ
= 0.95t / cm 2
Kaynak kem
H
= 1.10t / cm 2
Betonarme : Temel : Beton : B160 elik : S420 (ST III)
Zemin : zem = 1.0t / cm 2
49
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
50
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
51
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
7. Kesitleri ubuklara atamak iin; All dmesi ile btn ubuklar seilir.
AssignFrame Sections HE500-B seilir ve onaylanr.
52
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
53
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
54
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
ii) Alan pencerede Load Case Namersol seilir. Load Type and Direction
bal altnda Coord SysLocal ; Direction2 seilir.
iii) Uniform Loads ksmna 0.107 yazlr.
iv) 12-21 aras balk ubuklar seilir. AssignFrame LoadsDistributed seilir.
v) Alan pencerede Load Case Namersol seilir. Load Type and Direction
bal altnda Coord SysLocal ; Direction2 seilir.
vi) Uniform Loads ksmna 0.192 yazlr.
vii) 1 nolu ubuk seilir. Load Case Namersol seilir. Load Type and
Direction bal altnda Coord SysGLOBAL ; DirectionX seilir.
viii) Uniform Loads ksmna 0.384*1.25=0.48 yazlr.
ix) 22 nolu ubuk seilir. Load Case Namersol seilir. Load Type and
Direction bal altnda Coord SysGLOBAL ; DirectionX seilir.
x) Uniform Loads ksmna 0.192*1.25=0.24 yazlr.
16. rsag yklemesi iin;
55
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
56
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
57
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
58
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.5.Ak Hesab
5.5.1.Ara Ak Hesab
59
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.5.1.a.Gergisiz Hesap
I140 kesit zellikleri
Wx=81.9 cm3
Ix=573 cm4
Wy=10,7 cm3
Iy=36,2
0.027 6 4
f x = 2.48 = 2.40cm > 2,00cm
36,2
60
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
0.178 6 4
f x = 2.48 = 1.00cm
573
f y 0 (gergiden dolay)
61
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
L 600
f = ( f x2 + f y2 ) = 1.00cm < = = 2.00cm
300 300
5.5.2.Mahya a
q x 178
qx ' = = = 89kg / m
2 2
qy 27
qy '= = = 13.5kg / m
2 2
62
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.5.3.Gergi Hesab
63
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
I'k g=105
a g=5.7
I140
h
I'k b
4.150
b L=90 L(b L )=90
90.10.150
Z
=
Flama
5.03
= = 0.56t / cm 2 1.44t / cm 2
(1 9)
Ek lamasn profile balyan kaynak dikilerinin hesab
3mm a=4mm 0.7tmin=0.7x8.6=6mm
Z
l1 =
2 a1 kem
64
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.03
l1 = = 5.7cm
2 0.4 1.10
15a1 = 15 4 = 60mm l1 100a1 = 100 4 = 400mm l1 = 71olsun
l ' kay = l1 + a1 = 71 + 4 = 75mm
llev = 2 l1 ' = 150mm
Balk ek levhas 90.150.10 ; a1=4mm
Gvde kaynak dikilerinde gerilme hesab
I140 h-2c=105 mm
l 2 ' = 105mm
a 2 = s = 5.7 mm
c 9.36
kay = M = 58.3 = 0.48t / cm 2
2I x 2 573
Q
kay =
Fkay
0.178 6.00
kay = = 0.20t / cm 2 0.90t / cm 2
5.34
Kesit tesirleri
N1
M1
Q1
V2 = 9,08 t V1 = 11,25 t
Q2
M2
M 2 = 67,17 tm M 1 = 67,17 tm
N 2 = 12,74 t N 1 = 10,87 t
N2
65
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
= 8,53o 45 = 40,74
2
N 2 = N 1 sin + Q1 cos 12,74 = 10,87 sin 8,53 + 11,25 cos 8,53
M 2 = M1 67,17 = 67,17
HEB-500
h = 500 mm
b = 300 mm
s = 14,5 mm
t = 28 mm
h-2c = 390 mm
ekil 5.22 Ke dm noktas kesiti
500
h' = = 660 mm
cos 40,74
390
(h 2c )' = = 515 mm
cos 40,74
N ' = N 2 sin 45 + + Q2 cos 45 +
2 2
N ' = 12,74 sin 49,27 + 9,08 cos 49,27 = 15,58 t
Q' = N 2 cos 45 + + Q2 sin 45 +
2 2
Q' = 12,74 cos 49,27 + 9,08 sin 49,27 = 1,43 t
M ' = 67,17 tm
Tarafsz Eksenin Yeri:
a h' a t 2
b1 a1 h1' + t 1 + 2h' a3 1 + t + b1 a1 1 + t + b
2 2 2 2
e=
2b1 a1 + 2h' a3 + h t
2
2,8 2,8 2,0
30 2,866+ 2,0 + 2511,0(33+ 2) + 30 2,8 + 2,0 + 26
2 2 2 9502
e= = = 29,51.cm
230 2,8 + 2511,0 + 26 2,0 322
66
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
h1'
e = + t e
2
e = 3,49 cm
Kesit Karakteristikleri:
2 3 2 2
a h' a t
I x = b1 a1 h1' + t e 1 + 2a3 + 2a3 h' (e) 2 + b1 a1 e t 1 + b t e
2 12 2 2
2 3
2,8 51
I x = 30 2,8 66 + 2,0 29,51 + 2 1,0 + 2 1,0 51 3,49 2
2 12
2 2
2,8 2,0
+ 30 2,8 29,51 2,0 + 26 2,0 29,51
2 2
I x = 238439 cm4
M ' = M + N 'e
M ' = 67,17 + 15,58 3,49 0,01 = 67,71 tm
10
.30
0 10.260
10.200
260.500.20 400.680.30
10.200
10.260 10.515
10.515
10
.30
0
k =
M' '
Ix
(
h1 + t e +
N'
F
) kem
6771 15,58
k = (66 + 2,0 29,51) + = 0,95t / cm 2 1,1t / cm 2
238439 322
67
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
2
A -A K E S T
ekil 5.24 Ke dm noktas kesitinde kaynak isimleri
A kesitinden hareketle;
1 M ' 1 N '
Z1 = e t b1 a1
I 2 F
cos 45 x
2
1 M ' t N '
Z2 = e b t
I 2 F
cos 45 x
2
Z = Z 1 + Z 2 = 129,08t
P = 2 D sin 45 o
2
P = 2 129,08 sin 40,74 = 168,48t
68
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
P
= em
ba t a
168,48
= = 1,40 1,44t / cm 2
40 3
ekme Levhasnda ( 260.20 );
M' N'
= e
Ix F
6771 15,58
= 29,51 = 0,79 < 1,44t / cm 2
238439 322
ekme lamasn profil balna balayan 4 nolu kaynaklarda;
Z2
k = kem
2a 4 (l '2a 4 )
52,24
k = = 0,93 < 1,1t / cm 2
2 1,0 (30 2 1,0)
M' t N'
= (e + )
Ix 2 F
6771 2.0 15,58
= (29,51 + ) = 0,82 < 1,44t / cm 2
238439 2 322
ekme kuvveti:
Z 4 = A4
Z 4 = 0.82 26 2.0 = 42.64t
ekme lamasn kolon veya kirie birletiren kaynak dikilerinde:
Ak = 2 1.0 20 = 40cm 2
Z 4 42.64
k = = = 1.07t / cm 2 1.1t / cm 2
Ak 40
3 nolu kaynak kordonlarnda,
M ' h' N '
k = + e +
Ix 2 F
v = k + k vem (gerekiyorsa)
2 2
Q
k =
2a3 (h'2a3 )
69
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
6771 66 15,58
k = + 3,49 + = 1,08
238439 2 322
v = 1,08 + 0,06 = 1,08 1,1t / cm
2 2 2
5,97
k = = 0,06
2 1,0 (51 2 1,0)
5.6.2.Mahya Detay
Kesit tesirleri
Q = 3,65t
M = 33,01tm
N = 8,98t
N ' = N sin + Q cos
N ' = 8,98 sin 81,5 + 3,65 cos 81,5 = 12,68t
Q' = N cos + Q sin
Q' = 8,98 cos 81,5 + 3,65 sin 81,5 = 4,94t
= 73o
N '= 12,68t
M = 33,01tm ekil 5.25 Tepe dm noktas detay
Q'= 4,94t
Tarafsz Eksenin Yeri:
2
2,8 2,8 2,0
30 2,8 50 + 2,0 + 2 37 1,0 (25 + 2,0 ) + 30 2,8 + 2,0 + 26
2 2 2
e=
2 30 2,8 + 2 37 1,0 + 26 2
6586
e= = 22,4cm
294
e = 25,0 22,4 = 2,60cm
70
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
Kesit Karakteristikleri:
2 3
2,8 37
I x = 30 2,8 50 + 2,0 22,4 + 2 1,0 + 2 1,0 37 2,6 2
2 12
2 2
2,8 2,0
+ 30 2,8 22,4 2,0 + 26 2,0 22,4
2 2
I x = 129880cm 4
F = 294cm 2
M = 33,01 + 12,68 2,6 0,01 = 33,34tm
2
B -B K E S T
71
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
Z 4 29.12
k = = = 0.73t / cm 2 1.1t / cm 2
Ak 40
3 nolu kaynak kordonlarnda;
3334 50 12,68
k = + 2,6 + = 0,75t / cm 2
129880 2 294
Qmax = Q'(Z D )sin 45
2
Qmax = 4,94 (64,38 65,15)sin 8,5 = 5,05t
5,05
k = = 0,07t / cm 2
2 1,0 (39 2 1,0)
tahkiklere gerek yok.
72
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
5.7.Temel Hesab
A B = 60 40cm 2
Pem = 55kg / cm 2
14130
P= = 6kg / cm 2 < 55kg / cm 2
60 40
Taban levhas kalnl
1 1
2 ( A 0 . 95 h ) = (60 0.95 50) = 6.25
u 2
1 1 umax=8
( B 0.80h) = (40 0.80 30) = 8
2 2
3P 3 6
t = u max = 8 = 0.9cm t min = 30mm seildi.
em 1440
M = 0,0518
(10 5) (10 3,2 2,5) = 0.57tcm
2
t k2
W=
6
22
W = = 0.667cm 3
6
M
= em
W
73
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
0.57
= = 0,85 1,44t / cm 2
0,667
Korniyeri kolona balayan kaynaklarda kontrol a1=4mm
V=M/hprofil=(9.08*7,5)/10=6.81t
H 9.08
k = = = 0.91t / cm 2 1.1t / cm 2
al 2 0.5 10
V 6.81
k = = = 0,65t / cm 2 1,1t / cm 2
a l (0,3 35)
Nervr 100.10.200 a2=3mm
Kolon ucunda toplam nervr alan A1=2*10*1,0=20cm2
P 14.13
= = = 0.71t / cm 2 em = 1.44t / cm 2
A 20
Bir nervre gelen kuvvet:
A1
P1= =0.71*1,0*10=7,1t
2
Bu kuvveti aktaran dikilerdeki gerilme:
P1 7,1
k = = = 0,59t / cm 2 1,1t / cm 2
al 2 0.3 20
Kolon ucu kaynaklar a3=3mm
Yatay kuvveti sadece gvde dikileri alacaktr. a=3mm
a=3mm l1 =390mm kem = 0.9t / cm 2
H 9.08
k = = = 0,39t / cm 2 0,9t / cm 2
al 2 0.3 (39 2 0,3)
Balk boyunca min kaynak a4=3mm
Bulon hesab
M24 uygun seelim.
P1, = d1t min l ,em = 2,5 3,0 2,7 = 20,25t
* d12 (2,5) 2
P1 = m em = 1,26 = 6,18t
4 4
P1,em = min( P1, ; P1, ) = 6,18t 2 * 6,18 = 12,36t 9,08t
74
5.DOLU GVDEL EREVE SSTEM Sinem KOCABA
75
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
76
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
6.2.Yk Analizi
Sabit YkG
Zati yk G yklemesinin iindedir.
Kaplama =170.0 kg/m2
OSB:(10mm) 1000kg/m3x0.010m =10.0 kg/m2
Alpan:(10mm) =10.0 kg/m2
=190.0 kg/m2
Duvar 2 yz alpan: 2x10x(h=3.00m ) =60.0 kg/m
Hareketli YkQ
Odalarda: =200.0 kg/m2
X Dorultusunda Ana Kiri Yk (Duvarl)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yk demeden aktarlmaktadr.
Duvar yk: =60.0 kg/m
=60.0 kg/m
Hareketli YkQ
Deme yk demeden aktarlmaktadr.
X Dorultusunda Ana Kiri Yk (Duvarsz)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yk demeden aktarlmaktadr.
=0.001 kg/m
=0.001 kg/m
Y Dorultusunda Ana Kiri Yk (Duvarsz, 2Yan Demeli)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.50m =95 kg/m
=95 kg/m
77
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
Hareketli YkQ
200 kg/m2x0.50m =100 kg/m
=100 kg/m
Y Dorultusunda Ana Kiri Yk (Duvarl, 2Yan Demeli)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.50m =95 kg/m
Duvar yk: duvar kiriin zerinde ise =60 kg/m
=155 kg/m
Hareketli YkQ
200 kg/m2x0.50m =100 kg/m
=100 kg/m
Y Dorultusunda Ana Kiri Yk (Duvarl, 1Yan Demeli)
Sabit Yk--G
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.25m =48 kg/m
Duvar yk: =60 kg/m
=108 kg/m
Hareketli YkQ
200 kg/m2x0.25m =50 kg/m
=50 kg/m
Y Dorultusunda Tali Kiri Yk (Duvarsz, 2Yan Demeli)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.50m =95 kg/m
=95 kg/m
Hareketli YkQ
200 kg/m2x0.50m =100 kg/m
=100 kg/m
78
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
6.2.2.1.Kat Deme Yk
Sabit YkG
Zati yk G yklemesinin iindedir.
Kaplama =170.0 kg/m2
OSB:(10mm) 1000kg/m3x0.010m =10.0 kg/m2
Alpan:(10mm) =10.0 kg/m2
=190.0 kg/m2
Duvar 2 yz alpan: 2x10x(h=1.00m ) =20.0 kg/m
Hareketli YkQ
Odalarda: =150.0 kg/m2
X Dorultusunda Ana Kiri Yk (Duvarl)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yk demeden aktarlmaktadr.
Duvar yk: =20.0 kg/m
=20.0 kg/m
Hareketli YkQ
Deme yk demeden aktarlmaktadr.
X Dorultusunda Ana Kiri Yk (Duvarsz)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yk demeden aktarlmaktadr.
=0.001 kg/m
=0.001 kg/m
Y Dorultusunda Ana Kiri Yk (Duvarsz, 2Yan Demeli)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.50m =95 kg/m
=95 kg/m
79
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
Hareketli YkQ
150 kg/m2x0.50m =75 kg/m
=75 kg/m
Y Dorultusunda Ana Kiri Yk (Duvarl, 1Yan Demeli)
Sabit Yk--G
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.25m =48 kg/m
Duvar yk: =20 kg/m
=68 kg/m
Hareketli YkQ
150 kg/m2x0.25m =38 kg/m
=38 kg/m
Y Dorultusunda Tali Kiri Yk (Duvarsz, 2Yan Demeli)
Sabit YkG
Zati yk G yklemesinin iindedir.
Deme yan: 190 kg/m2x0.50m =95 kg/m
=95 kg/m
Hareketli YkQ
150 kg/m2x0.50m =75 kg/m
=75 kg/m
6.2.3.Kolon yk
Sabit YkG
Zati yk G yklemesinin iindedir.
=0.001 kg/m
=0.001 kg/m
6.2.4.Deprem Hesab
80
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
st kat---G=12390 kg ---Q=7508 kg
Alt kat---G=15049 kg ---Q=10003 kg
Wi = G + nQ n=0.3
W = Wi = 32692kg
Wi H i = 142002kg
Wi H i
Fi = V (t )
Wi H i
87852
F1 = 4087 = 2528kg
142002
2528 2528
= 843kg = 632kg
3 4
54150
Fz = 4087 = 1559kg
142002
1559 1559
= 520kg = 390kg
3 4
81
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
82
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
83
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
84
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
85
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
86
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
87
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
14. EX yklemesi iin; Z=3 kotunda z1, z22, z43 dm noktalar seilir.
i) AssignJoint LoadsForces admlar sonras alan pencerede(Joint
Forces) Load Case NameEX seilir.
ii) Coord SysGLOBAL ve Options bal altnda Replace Existing Loads
iaretli iken, Loads bal altnda Force Global X ksmna 520 kgf yazlr.
iii) Ayn ilem srasnda Z=6 kotunda c1, c22, c43 dm noktalar seilerek
ayn mevcut koullarda Force Global X ksmna 843 kgf yazlr.
15. EY yklemesi iin; Z=3 kotunda z43, z49, z57, Z63 dm noktalar seilir.
i) AssignJoint LoadsForces admlar sonras alan pencerede(Joint
Forces) Load Case NameEY seilir.
ii) Coord SysGLOBAL ve Options bal altnda Add Existing Loads
iaretli iken, Loads bal altnda Force Global X ksmndaki deer silinir,
Force Global Y ksmna -390 kgf yazlr.
iii) Ayn ilem srasnda Z=6 kotunda c43, c49, c57, c63 dm noktalar
seilerek ayn mevcut koullarda Force Global Y ksmna -632 kgf yazlr.
88
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
89
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
90
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
ekil 6.11 Zemin ve 1.Kat kiri kesit yeterlilii(deme kirileri rijit bal)
ekil 6.12 Zemin ve 1.Kat kolon kesit yeterlilii(deme kirileri rijit bal)
91
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
**Deme kirileri ile ana kirilerin balantlarnn mafsall ve rijit olduunda elde
edilen sonular karlatrldnda ortadaki kiri ve kolonlarda alma
kapasitelerinde artma olduu gzlenmitir.
**Mevcut yapya ek olarak A-B ile B-C akslar arasnda ve 2-3 akslar arasnda
d cephede 2L50*5/10 profilinden apraz dzenlendiinde elde edilen kesit
yeterlilik diyagramlar yledir.
92
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
93
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
6.4.Detaylar
6.4.1.B Detay
M3
Q3 N3
M1
M2
N2
B-B Kesitinde
Fk= [ 2 *b1 + 4 * ( b1 a1 ) + 2 * ( h1 2 * a 1 ) ]*a1
FkG = 2*( h1 2 * a 1 )]*a1
Fk= [ 2 * 7,40 + 4 * ( 2,30 0,60 )] * 0,60 + 2 * ( 12,50 2 * 0,40 )*0,40 =22,32cm2
FkG
h1 2 h h' 1
Ik= 2 * b1* a1* ( ) + 4 *(b1 - a1 )* a1 * ( 1 t1 ) 2 + 2 * a1 *( ( 1 a1 ) 3
2 2 2 12
16 2 16
Ik= 2 * 7,40 * 0,60 * ( ) + 4 * (2,30 0,60 ) * 0,60 * ( 0.95) 2 +
2 2
12.5 1
+ 2 * 0,40 * ( 0.40) 3 =878cm3
2 12
h1
M1= M1 Q1 *
2
50
M1= 1666,00 2044 * = 115,50 kgm
2
Q1= Q1 Q1= 2044 kg
94
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
M '1 h1 N '1
kmax = * + kem
Ik 2 Fk
115.50 16
kmax= * = 1,05 1,25 t/cm2
878 2
M '1 h'1 N '1
k1 = * +
Ik 2 F 'k
115.50 12.50
k1 = * = 0,82 t/cm2
878 2
Q'1
kI =
FkG
2.044
kI = = 0,22 t/cm2
9.36
( k1 + k1 )
2 2
v =
A-A Kesitinde
h2
M2= M2 Q2 *
2
16
M2= 0,521 0,474 * = 48,30 tcm
2
Q2= Q2 Q2= 0,474 t
N2= N2 N2= 7,241 t
Kiri Alt Balndan Kolona Gelen Basn Kuvveti
115.50 (8 0.45)
P= * * 7,40 * 0,95 = 6,96 t
878 2
Bu Kuvveti Karlayan Temas Alannda Gerilme Kontrol
HEB 180 iin boyutlar
h = b = 180;
s = 8,5; t = 14; c = 29 ; h 2c = 122
h = 0,95 + 2 * 2,14 = 3,75
(18 0.85)
bn = 8,58 = 8.5 cm
2
95
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
6.96
= = 0,34 < 1,44 t/cm2
(3.75 * 0.85 + 2 * 8.5 *10)
Berkitmeleri Kolona Balayan Kaynaklarda
6.96
Pn = * 8,50 * 1,0 = 2,93 t
(3.75 * 0.85 + 2 * 8.5 *10)
2.93
k = = 0,42 < 1,25 t/cm2
(2 * 0.30 * (12.2 2 * 0.2))
Kolon Gvdesinde Asal Gerilme Kontrol
(6.96 0.474)
T= = 0,63 < 0,831 t/cm2
(12.20 * 0.85)
48.30 18
= * ( 1,40 ) = 0,10
3830 2
v = ( ' 2 +3 2 )
96
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
Kaynakta ;
l = 120 mm l =120- 2 * 3,00 = 114 mm
Fk = 2 * 0,35 * 11 = 6,6 m2 Wk= 2 * 0,3 * 112 / 6 = 12,10 cm3
6.4.2.A Detay
M1
N1
97
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
98
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
t1
h1
h1
t
70
a4
hk
t'
a2 a2
t
I B=400
100
a2 I-I K ESITI
a1
a3
180
400
lk
M
a2 A /4
Z S
100
H P
I
99
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
100
6.OK KATLI KR-KOLON EREVE Sinem KOCABA
101
7.SONULAR VE NERLER Sinem KOCABA
7. SONULAR VE NERLER
4.Blmde,
24m aklkl kafes kiri-makas, 8m yksekliinde kolon, 5.20mde gezer
vinten oluan, 30m uzunluunda kafes kiri-kolon sistem zlmtr.
102
7.SONULAR VE NERLER Sinem KOCABA
5.Blmde,
7.40m yksekliinde kolon, 3.00m orta ykseklikli, 40m aklkl krk
ereveden oluan, 30m uzunluunda dolu gvdeli ereve sistem zlmtr.
103
7.SONULAR VE NERLER Sinem KOCABA
6.Blmde,
Bir dorultuda 10m, dier dorultuda 5m akl, 3.00m kat ykseklii olan,
d cephesi iki yz alpan duvarla evrili, demesi alpan+OSB+kaplama
malzemesinden oluan, iki katl kiri kolon ereve sistem zlmtr.
Yapya ait zellikler dikkate alnarak ve TS 498, TS648, TS3357ye ek olarak
TDY98, Afet Blgelerinde Yaplacak Yaplar Hakknda Ynetmelik kullanlarak,
statik ve (edeer deprem yntemine gre)dinamik ykler etkisinde, yk analizi iin
gerekli olan deerler ilgili tablolardan okunmutur.
SAP2000de modelleme yaplm ve kesit tesirleri elde edilmitir. Her kat
deme dzlemi iinde diyafram gibi davranmaktadr, bu yzden bir kat temsil eden
dm noktalarna diyafram art atanmtr.
Deme kirileri sadece dey kuvvet aktaracak ekilde tekil edilmitir, bir
baka deyile deme zgaralar kirilere mafsall baldr. Deme kirileri ile ana
kirilerin balantlarnn mafsall ve rijit olduunda elde edilen sonular
karlatrldnda rijit balyken ortadaki kiri ve kolonlarda alma
kapasitelerinde artma olduu gzlenmitir. Saysal bakmdan ok farkl olmasa da
mafsall detaylandrma ile orta ana kiri ve kolon kesitleri daha kk seilebilir.
Kolon temel balants ankastredir.
104
7.SONULAR VE NERLER Sinem KOCABA
105
KAYNAKLAR
106
ZGEM