You are on page 1of 2

Tugas VI

No Urut Tanggal Jumlah Sample (n) rata-rata range A2 A2R LKA LKB Xbar

1 8/17/2017 3 3.72 0.03 1.02 0.031008 3.746841 3.684825 3.71


2 8/18/2017 4 3.72 0.02 0.729 0.022162 3.737995 3.693672 3.71
3 8/19/2017 5 3.72 0.01 0.58 0.017632 3.733465 3.698201 3.71
4 8/20/2017 6 3.71 0.03 0.48 0.014592 3.730425 3.701241 3.71
5 8/21/2017 5 3.71 0.02 0.58 0.017632 3.733465 3.698201 3.71
6 8/22/2017 4 3.71 0.02 0.729 0.022162 3.737995 3.693672 3.71
7 8/23/2017 3 3.72 0.04 1.02 0.031008 3.746841 3.684825 3.71
8 8/24/2017 5 3.72 0.01 0.58 0.017632 3.733465 3.698201 3.71
9 8/25/2017 5 3.71 0.03 0.58 0.017632 3.733465 3.698201 3.71
10 8/26/2017 6 3.73 0.08 0.48 0.014592 3.730425 3.701241 3.71
11 8/27/2017 3 3.72 0.03 1.02 0.031008 3.746841 3.684825 3.71
12 8/28/2017 4 3.72 0.02 0.729 0.022162 3.737995 3.693672 3.71
13 8/29/2017 4 3.72 0.02 0.729 0.022162 3.737995 3.693672 3.71
14 8/30/2017 5 3.72 0.03 0.58 0.017632 3.733465 3.698201 3.71
15 8/31/2017 5 3.72 0.04 0.58 0.017632 3.733465 3.698201 3.71
16 9/1/2017 6 3.72 0.02 0.48 0.014592 3.730425 3.701241 3.71
17 9/2/2017 5 3.67 0.1 0.58 0.017632 3.733465 3.698201 3.71
18 9/3/2017 5 3.71 0.02 0.58 0.017632 3.733465 3.698201 3.71
19 9/4/2017 4 3.72 0.02 0.729 0.022162 3.737995 3.693672 3.71
20 9/5/2017 6 3.73 0.04 0.48 0.014592 3.730425 3.701241 3.71
21 9/6/2017 4 3.72 0.02 0.729 0.022162 3.737995 3.693672 3.71
22 9/7/2017 3 3.71 0.03 1.02 0.031008 3.746841 3.684825 3.71
23 9/8/2017 2 3.71 0.02 1.88 0.057152 3.772985 3.658681 3.71
24 9/9/2017 7 3.73 0.04 0.419 0.012738 3.728571 3.703096 3.71
25 9/10/2017 5 3.71 0.02 0.58 0.017632 3.733465 3.698201 3.71
total 92.9 0.76
rata-rata 3.72 0.03

TUGAS MATA KULIAH PPM TA 2017/2018


PETA KONTROL X

3.8

3.78

3.76

3.74
3.73 3.73 3.73
3.72 3.723.723.72 3.723.72 3.723.723.723.723.723.72 3.72 3.72 x
3.713.713.71 3.71 3.71 3.713.71 3.71
3.7 lka
lkb
3.68
3.67 xbar
3.66

3.64

3.62

3.6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Analisa :

Pada peta kontrol tersebut diketahui bahwa terdapat 1 buah titik yang melewati batas
dan 1 titik tersebut melewati limit kontrol bawah pada titik 17 yaitu titik yang
(diluar kontrol)
terjadi pada tanggal 2 September 2017.

TUGAS MATA KULIAH PPM TA 2017/2018

You might also like