You are on page 1of 3

Preparing of materials needed for laboratory experiment.

Weighing of the graduated cylinder.

Placing and tamping of the sample sand 1/3 full of the graduated cylinder.
Placing and tamping of the sample sand 2/3 full of the graduated cylinder.

Placing and tamping of the sample sand overflowing of the graduated cylinder.

Weighing of the sample aggregate for first trial.


Weighing of sample aggregate for second trial.

Weighing of sample aggregate for third trial.

Weighing of sample aggregate for fourth trial.

You might also like