Professional Documents
Culture Documents
Energy Audit of 250 MW Thermal Power Stations PTPS, Panipat
Energy Audit of 250 MW Thermal Power Stations PTPS, Panipat
Abstract
Energy conservation means, the need is to use energy efficiently and effectively.Energy Audit is a technical
survey of a plant in which the machine/section wise/ department wise pattern of energy consumption studied and
attempts to balance the total energy input correlating with production. As a result of the study the areas where
the energy is wastefully used and the improvements are felt, are identified and corrective measures are
recommended so that the overall plant efficiency could be improved.Fundamental understanding of the process
is essential if we are to improve the overall efficiency of the system. In this work an energy audit of 250MW
Power Plant (Coal based) is presented at different loads. In thermal power station approximately 90% of the
fuel i.e. Coal alone. In my work the overall plant efficiency observed 33.67% (210MW), 35.89% (232MW) and
36.74% (250MW). The component efficiencies found 85.23% (Boiler), 41.19% (Turbo-Gen.) and 53.33%
(condenser) at full load.
1. Introduction
Energy Audit: An energy audit is a technique for identifying energy losses, quantifying them, estimating
conservation potential, evolving technological options for conservation and evaluating techno economics for the
measures suggested e.g. Assist industries in reducing their energy consumption, To promote energy-efficient
technologies among industry sectors, Disseminate information on energy efficiency through training programs
and workshops, To promote transfer of energy-efficient and environmental-sound technologies to the industrial
sectors in the context of climate change.
Energy Audit Technique: The energy audit evaluates the efficiency of all process equipment/systems that
require energy. The energy auditor begins at the utility meters, locating all energy sources coming into a facility.
The auditor then identifies energy streams for each fuel, quantifies those energy streams into discrete functions,
evaluates the efficiency of each of those functions, and identifies energy and cost savings opportunities.
Total System Audit: This approach analysis the total system by detailed analysis as the total energy data is
entered in a master database file. This contains design data and also the observed data. This approach gives the
energy performance of the total system and identifies areas of improvements on energy cost or energy quantity
basis. This method requires rigorous data entry and analysis.
Problem Formulation
In PTPS, Panipat 250 MW units is consideration for energy Audit for Energy Audit and Efficiencies of main
sub-units as like Boiler, Turbine and generator, Condenser & Heater are calculated and compared are different
loads which highlights in PTPS 250 MW units energy efficiency has to be improved to survive in Global Market.
120
Proceedings of the National Conference on
Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana, Oct 19-20, 2012
Figure 1
3. Data Analysis
Data Analysis of plant at 250 MW
Boiler Section
Inlet in Boiler
(i) At (40) Coal = 120T/hr
= 120 x 1000/3600
=33.33 Kg. /Sec.
Calorific Value = (C.V) of Coal
= 4860 K Cal/Kg
Energy = 4860 x 33.33 x 4.2/1000
121
Proceedings of the National Conference on
Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana, Oct 19-20, 2012
= 680.33 MW
(ii) At (2) Energy = 507.77 MW
(iii) At (24) Energy = 472.26 MW
Section Condenser:
122
Proceedings of the National Conference on
Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana, Oct 19-20, 2012
Input of Station
= Energy sent out (KW) .
Fuel burnt (Kg) x Calorific value of fuel (K Cal/kg)
4. MAIN RESULTS
The efficiencies / effectiveness of typical 250 MW Plant at different loads are compared as follows:-
Table 1
250 232 220
Description
MW MW MW
Boiler Efficiency 85.23% 85.20% 84.66%
Turbine & Generator Efficiency 41.19% 31.51% 29.88%
Condenser Efficiency 53.33% 46.67% 43%
Heater LPH1 Effectiveness 0.46 0.5 0.51
123
Proceedings of the National Conference on
Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana, Oct 19-20, 2012
Graph 1
250MW
232MW
210 MW
100%
85.23%
85.20%
84.66%
90%
80%
70%
53.33%
60%
46.67%
41.19%
50%
43%
31.51%
40%
29.88%
30%
20%
10%
0%
Boiler Efficiency Turbine & Gen. Condensor
Efficiency Efficiency
250MW
232MW
210 MW
50%
40%
36.74%
35.89%
33.67%
30%
20%
10%
0%
Overall Plant Efficiency
Graph 2
5. CONCLUSIONS
(1) Overall Plant efficiency at lower loads decreases so we should run the Plant at higher load.
(2) Boiler has scaling problem which aggravates localized corrosion and affects the boiler life. Scale formation
in the boiler is caused due to water hardness. A layer of scale on a boiler tube acts as an insulator and results in
inefficient heat transfer and overheating of metal walls. It is estimated that about 2% coal consumption can be
reduced or saved by eliminating scale accumulation in the boiler.
(3) The decrease in the amount of steam flowing through the low pressure end of the turbine and the amount of
steam to be condensed.
(4) The boiler efficiency found 84.66 % to 85.23 %; this can be increased up to 90 % to 95 % by adopting
following recommendation.The effect of supplying only the theoretical amount of air for combustion with coal.
Some coal remains into chemical combustion with the constituents of the fuel, which results great loss of
available heat as the gases are only partially brunt. In the case being considered 10% of the heat may be lost as
unburant carbon in ash, and possibly a further 15 % app. Lost up chimney as unburant gas. Thus about 75 % of
the heat is liberated in the furnace.
Admitting more air will reduce the losses considerable, as the chance of the carbon and hydrogen atoms meeting
the necessary oxygen atoms has increased greatly.
124
Proceedings of the National Conference on
Trends and Advances in Mechanical Engineering,
YMCA University of Science & Technology, Faridabad, Haryana, Oct 19-20, 2012
Figure 2
(5) Boiler efficiency is mainly attributed to dry flue gas, wet gas & sensible heat loss, which may reduced quite
significantly by reducing the flue gas exhaust temperature. Reduction in flue gas temperature less than that of the
dew point temperature may cause loss of boiler life even more than that saving money on flue cost because of
higher efficiency.
(6) To increase the heat available compared to the heat rejected is to increase the superheated steam temperature.
Unfortunately this is only possible to a very small degree because metallurgical limitations. Thus there is very
little scope in this direction.
(7) For improving condenser efficiency main factors is the improvement in quality of cooling water and close
cycle. At present in plant using open cycle.
(8) Overall efficiency of plant can be increased by using wash-coal which helps to eliminate the ash contents
from the coal. By doing so, we can save the energy waste with ash.
References
1. Bergander, Mark J. Porter, R.W. (2003) Most troublesome component of electric power generation plant,
Energy conservation in coal fired boilers, Vol. 32, 2003, Page No. 142-149
2. Hatt, Roderick, M. & Lewis, W (2003) Coal ash deposits in coal fired boilers Energy conservation of coal
fired boilers, Vol. 14, 2003, Page No. 181-189
125