Connecting and operating storage
units in low voltage networks

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page II
Contents

1 Scope......................................................................................................................................... 3

2 Normative references .............................................................................................................. 4


3 Terms and definitions .............................................................................................................. 5

4 Technical requirements ........................................................................................................... 7

4.1 Technical requirements .................................................................................................................... 7


4.2 Supplementary observations with regard to storage units ................................................................ 7
4.3 Connection criteria ............................................................................................................................ 8
4.4 Symmetry and monitoring of infeed power ....................................................................................... 9
4.5 Impacts on network loads ............................................................................................................... 10
4.6 Reactive power ............................................................................................................................... 10
4.7 Active power limitation .................................................................................................................... 10
4.8 Active power reduction in the event of overfrequency .................................................................... 11
4.9 Storage system design / NC protection .......................................................................................... 11
4.10 Technical balance requirement ....................................................................................................... 11
4.11 Validation of compliance with technical requirements .................................................................... 11

5 Connection and operating concepts .................................................................................... 13


5.1 General ........................................................................................................................................... 13
5.2 Storage units without generator plant and consumption system, directly connected to the grid ..... 13
5.3 Generator with storage unit without consumer ............................................................................... 13
5.4 Storage system in the generation path ........................................................................................... 14
5.5 Storage system in the consumption path ........................................................................................ 16
5.6 Isolated network operating mode (in the low voltage network) ....................................................... 17

Page III | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
List of figures and abbreviations
Figures
Fig. 1: Generator with storage unit without consumer .................................................................................. 13
Fig. 2: Storage system in the generation path ............................................................................................... 14
Fig. 3: Storage system in the generation path with CHP system .................................................................. 15
Fig. 4: Storage system in the consumption path ........................................................................................... 16
Fig. 5: Storage system in the consumption path with CHP system ............................................................... 17

Abbreviations
FNA Federal Network Agency
BMU German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety
EZA Generator plant
EZE Generator unit
FNN Forum Network Technology / Network Operation in the VDE
HS Ultra-high voltage
HS High voltage
MV Medium voltage
LV Low voltage

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page IV
Foreword

In light of the challenges surrounding the energy turnaround, we can assume that a large number of energy
storage units are going to have to be integrated into the existing system over the long term. As such, the
current general conditions and requirements need to be reviewed and, if necessary, adapted and expanded.
The use of energy storage units is currently focused mainly on the low and medium voltage networks. Initial
studies by VDE|FNN have shown that the VDE-AR-N 4105 technical regulations, BDEW-MV guideline,
technical connection requirements for low and medium voltage networks, VDN guideline for emergency
generators and the ENTSO-E-NetworkCodes should serve as the basis and orientation for defining the
requirements for connecting storage units to the grid and operating them.

This Technical Information aims to technically implement the connection and operation of storage systems
and, in particular, to implement the Guidelines for promoting stationary and decentralized battery storage
systems for use in connection with photovoltaic systems, which was published on Friday, April 19, 2013 /1/.

It is primarily aimed at network operators, system developers, system operators and manufacturers of gen-
erators or storage units and/or storage systems in connection with generators.

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 1
Introduction

Generally, the widely established technical connection requirements (e.g., TAB 2007, VDE-AR-N 4105,
technical guideline for emergency generators, etc.) must be observed when connecting and operating stor-
age units and/or storage systems.

In light of the complexity of the issue and the anticipated increase in the use of storage units and/or storage
systems, explanations and practical examples are needed. The definition of the requirements for storage
systems in terms of network engineering and network operation, in particular, must ensure the continued
safe and reliable operation of the networks and the exclusion of any additional risks for people and property.
The aim is to better integrate storage systems into the energy supply system based on existing schematics.

Generally, storage units can be used to optimize the load within a customer's system, to even out load flows
in the low voltage network (load management), and to support the network (e.g., by sustaining voltage lev-
els). The motivation for integrating storage units comes from the broad spectrum of possible applications
that can, in certain conditions, positively impact the public grid. These effects include:

Reduction of additional network loads by means of load management in the customer's system (e.g., by
increasing own consumption accordingly);

Improved integration of generated power into the public grid (reduction of limitation measures)

Load flow homogenization in the low voltage network

Grid support, e.g., sustaining voltage levels by feeding in reactive power accordingly

As a result, possibly avoiding the need to expand the network

Provision of system services (frequency stability, network dynamics, etc.)

The use of suitable information and communications technology (ICT) with standardized interfaces can
further enhance the positive effects of storage units.

These storage units can be electrical, thermal, chemical or mechanical.

Page 2 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
1 Scope
This Technical Information aims to technically implement the connection and operation of storage systems
and, in particular, to implement the Guidelines for promoting stationary and decentralized battery storage
systems for use in connection with photovoltaic systems, which was published on Friday, April 19, 2013 /1/.

The information applies when planning, developing, operating and modifying storage units or storage sys-
tems that are connected to the low voltage network and operated in parallel with a network operator's grid
(low voltage network connection point). Particular attention must be paid in this respect to modifications of
storage units and/or storage systems that materially impact electrical behavior at the network connection
point.

The observation and reference point for technically evaluating a storage unit or system is always the bound-
ary separating responsibility for the customer's system and for the public distribution network (e.g., house
junction box). In order to ensure that the needs of all areas of application of storage systems are considered
both now and in the future, these systems must be analyzed in their entirety at the network connection point
(generation, consumption and storage).

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 3
2 Normative references
The documents cited below are necessary to use this information. In the case of dated references, only the
cited version applies. In the case of undated references, the most recent version of the cited document
1
applies (including all revisions).

D-A-CH-CZ Technical rules for the assessment of network disturbances

DIN V VDE V 0124-100 Grid integration of generator plants

VDE|FNN Information on technical / operational implementation of infeed


management

TAB 2007 Technical conditions for connection to the low voltage network

Technical guideline for emer- Guidelines for planning, constructing and operating emergency
gency generators generating facilities

VDE-AR-N 4101 Requirements for meter panels in low voltage electrical systems

VDE-AR-N 4105 Power generation systems connected to the low voltage distribu-
tion network - Technical minimum requirements for the connec-
tion to and parallel operation with low voltage distribution net-
works

VDE-AR-N 4400 Electricity metrology

Legal specifications, such as derived from the Low Voltage Connection Regulation (Niederspannungsan-
schlussverordnung, NAV), apply irrespective of these requirements /2/. Compliance with product-specific
requirements and norms is taken for granted.

1 Further information on all documents can be found at: www.vde.com/de/fnn

Page 4 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
3 Terms and definitions
System operator: Entrepreneurs, or natural or legal entities commissioned by them, who assume respon-
sibility for safely operating and ensuring the proper condition of the customer's system.

System developer: Individuals or enterprises who build, expand, modify or maintain electrical systems; but
also individuals or enterprises who did not build, expand, modify or maintain the systems but acted as ex-
perts in inspecting the completed works and assumed responsibility for the proper completion of the same.

Battery storage: A rechargeable electricity storage unit based on the conversion of chemical energy.

Battery storage system: A system comprising the battery storage unit, battery management system and all
of the components needed from a system engineering perspective to enable the intended operation in con-
nection with a power generator that are not equally necessary when investing in, and operating, a generator.

Storage system operating mode: Describes the operating function of the storage unit

Mode: Energy consumption

The storage system is charged from the public or customer's own AC grid

Mode: Energy supply


The storage system discharges into the public or customer's own AC grid

Mode: Isolated network (max. time allowed to operate in parallel in isolated network mode 100 ms)
The storage system is disconnected from the public grid.
The storage unit is charged from, or discharged into, the customer's own AC grid.

Final circuit: Circuit designed to supply power straight to electrical consumers or sockets.

Energy flow direction sensor (EFDS): Technical equipment for determining the net energy flow direction;
communicates with the storage system (e.g., by current directional relay).
Note 1: If electricity is metered on a phase-selective basis, the EFDS must also be designed with phase
selectivity.
Note 2: Metering systems that comply with EnWG 21, are available in the marketplace, and can satisfy the
requirements listed in this information, can also be used to monitor energy flow direction.

Generator plant (EZA): the entirety of units from one source of energy that are used to generate power and
are connected to a mains/house connection (e.g., all PV units).

Generator unit (EZE): Single unit for generating electrical power

Customer's system: the electrical system as defined in 13 and 14 NAV, i.e., the entirety of all electrical
equipment downstream of the transfer point (with exception of the metering equipment) that is used to sup-
ply power to the users.

Power: Unless explicitly described otherwise, the term is used to mean active power.

Network operator: Operator of a network that supplies electricity to the general public.

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 5
Storage unit: A system that can draw electricity from, or feed electricity into, the customer's own network
and/or the public grid, depending on the operating mode, irrespective of the nature of technical implementa-
tion.

Storage system: A system comprising the storage unit, storage management system and all of the compo-
nents needed from a system engineering perspective to enable the intended operation.

Page 6 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
4 Technical requirements
4.1 Technical requirements
Storage units and/or storage systems must satisfy the following requirements:

In "Energy consumption" mode (from the public grid and/or the customer's own power generator), the
storage unit acts like a consumption system from the grid's perspective.

In "Energy supply" mode (from the public grid and/or the customer's own power generator), the storage
unit acts like a generator plant from the grid's perspective.

Accordingly, the relevant existing technical regulations governing consumption and generation systems
must be observed when connecting storage units to the network and operating them.

Connection and operation in LV networks:


Compliance with TAB 2007 for "Energy consumption" mode, and with VDE-AR-N 4105 for "Energy sup-
ply" mode, and with the technical conditions (TAB) for connection to the low voltage network. Ob-
servance of the technical guideline for emergency generators in "Isolated network" mode.

4.2 Supplementary observations with regard to storage units

When using storage units and/or storage systems, the documents listed above (Section 2) must be supple-
mented by the terms and definitions in Section 3. The description of the possible operating modes of stor-
age units and/or storage systems constitutes a further supplement.

As storage units can be equipped to perform multiple functions, different parameters must be set for the
relevant operating modes and their functions.

Operating modes:

Energy consumption:
Parameters as specified in the application procedures of TAB 2007 and/or by the operators of the rele-
vant distribution networks

Energy supply to the customer's own system and/or the public grid:
Supplementary data sheets as for generators (VDE-AR-N 4105)

Isolated network (max. time allowed to operate in parallel in isolated network mode 100 ms)

Data sheet as per the technical guideline for emergency generators

Information describing how the storage unit works is also necessary:


Load optimization in the customer's system
Load flow homogenization in the low voltage network (load management)
Grid support, e.g., sustaining voltage levels, system services, isolated network operation as a
standby system
Provision of electricity for electric road vehicles

Maximum and usable storage capacity in kWh are further parameters required just for the storage unit.

These supplements are implemented by the following specific additions to the technical regulations:

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 7
"Scope of application" section: "This VDE application rule/guideline/... applies for the planning, construc-
tion, operation and modification of consumption and generation systems and storage units that are con-
nected to the low voltage distribution network of a network operator and that are operated parallel to the
network. Particular attention must be paid in this respect to modifications of generators and storage
units that materially impact electrical behavior at the network connection point."

Note: "Storage units can support load management if they are flexibly operated as specified by the net-
work operator (e.g., remote connection/disconnection of the storage units). Appropriate separate con-
tractual agreements between the operators of the system and the network may be necessary in this re-
spect."

The technical requirements and conditions for connection as described in this information must be satisfied
by an energy storage unit that is used in combination as a variable load, generator or standby system. The
following properties and combinations of the same are possible:

Storage unit that does not draw power from the public grid;

Storage unit that does not feed into the pubic grid;

Storage unit that draws power from the public grid;

Storage unit that feeds into the pubic grid;

All application scenarios must be derived from these properties. Section 5 describes possible concepts for
connection and operation. It is therefore particularly helpful when planning, building and operating such
systems.

4.3 Connection criteria

The technical conditions for connection as stipulated by the network operator must be observed when de-
signing the connection of the storage unit and/or customer system with storage facility. Within the custom-
er's system, the cable connecting the storage unit must be attached to the meter panel for full infeed into the
operator's network; the meter panel must then be designed in accordance with the applicable TAB (currently
TAB 2007). Infeed to the meter panel is always routed through the upper connection area.

Storage units with a connected active power rating of 30 kW, which are used to optimize own consumption
or reduce infeed power, can also be connected to sub-distributors. Particular care must then be taken by the
system developer when checking the wiring size and protection for the electrical installation. Under no cir-
cumstances is connection to a final circuit permissible.

The maximum connected active power rating approved by the network operator for drawing power from, or
feeding power into, the grid (from which can be derived the maximum apparent power by considering cos
) may not be exceeded at the network connection point. The rated power fed into the public grid must be
monitored by the system operator and limited if necessary.

Section 5 summarizes the possible connection variants and applicable metrology designs for storage units
and/or storage systems.

Note 1: This version of the Technical Information initially only deals with concepts that are relevant for /1/,
i.e., storage units and/or storage systems with a power rating of 30 kW that are connected to the low volt-
age network.

Page 8 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
Note 2: In the case of deviations, the requirements in terms of billing measurement and accounting must be
examined and agreed with the network operator.

It is not permissible to draw electricity from the grid and then feed it back in order to claim statutory reim-
bursement, e.g., as provided for in EEG or KWK-G. The system operator is responsible for providing valida-
tion (e.g., manufacturer's certificate).
If reimbursement of stored electricity is provided by law, it must be stored separately by primary energy
source and split into different feed-in tariffs.

4.4 Symmetry and monitoring of infeed power

Storage units must always be designed and connected to the grid as symmetrical, three-phase rotary cur-
rent units.
Since the infeed quantity from generators and the own consumption quota according to VDE-AR-N 4400 are
determined using the Ferraris measurement principle, this same principle is assumed to be equally applica-
ble when settling energy quantities among generators, consumers and storage systems.

Single-phase connections of generators and storage units are generally possible up to 4.6 kVA. This limit
applies to the aggregate of infeed power and power drawn at the network connection point. Compliance with
the maximum specified asymmetry of 4.6 kVA between two external conductors is mandatory when operat-
ing single-phase generators in conjunction with single-phase storage units, i.e., particularly when the gener-
ator and storage unit feed in simultaneously.
When connecting the storage units and/or storage systems, the network operator must be consulted in
respect of the phase/phases to which the storage units and generators must be connected in each case.

Various measures can be adopted to ensure compliance with the maximum permissible asymmetry of 4.6
kVA between 2 external conductors.

Establishing communication between generator and storage unit and limiting the aggregate power to the
maximum permissible asymmetry.

Measuring and regulating the power exchange at the network connection point for each phase in re-
spect of the maximum permissible asymmetry.

Note: The 1 minute mean value is used for determining satisfaction of the asymmetry condition.

VDE-AR-N 4105 currently only describes the requirements for generators that feed electricity into the public
grid or in-house network, while TAB 2007 describes the connection of electrical consumers. Both docu-
ments stipulate a maximum asymmetry of 4.6 kVA between two external conductors for single-phase con-
nections. This can, however, produce an aggregate asymmetry of 9.2 kVA between two external conductors
(example: single-phase generator on one 4.6 kVA external conductor and a consumer up to 4.6 kVA on
another external conductor). So far, this has been distributed purely stochastically in the absence of active
intervention, e.g., by an energy management or storage system, and generally evens out again over multi-
ple house connections or at the local power transformer. Often, both energy management or the use of a
storage unit cause this stochastic distribution to result in systematic asymmetry. Looking ahead, these
considerations imply that the requirements for connection of such systems to networks must change in
future.

Since the explanations above establish a link between the asymmetry related in each case to consumption
and generation for the first time (discharge mode as per VDE-AR-N 4105 and charge mode as per TAB

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 9
2007), a transition period will be necessary to allow manufacturers to adjust their systems to the revised
requirements.

After consultation with the operator of the distribution network, one of the following exceptions is permissible
for systems that are put into service before June 30, 2014:

Connection of a storage unit up to an infeed and charge capacity of 4.6 kVA to the same phase as the
single-phase generator up to 4.6 kVA.

Alternatively, the storage unit may be connected to a different phase than the single-phase generator
and may then charge at up to 4.6 kVA with simultaneous single-phase generation of up to 4.6 kVA.

4.5 Impacts on network loads

The load on the network may be relieved if the power infeed from the customer's system into the grid is
reduced by storing the power in the customer's system.

In the case of storage units and/or storage systems with single-phase (or possibly two-phase) connections
in the customer's system, this effect can only be produced to a certain extent and cannot be reliably calcu-
lated by the operator of the distribution network. A meter measures the power balance within the customer's
system at the network connection point using the Ferraris measurement principle (in accordance with VDE-
AR-N 4400). This principle nets the power flows across all phases. Physically, the power generated on one
phase is, however, only compensated by consumers on the same phase. Excess power in this phase is
therefore fed into the grid and must be distributed through it. As such, the external conductors of the con-
necting lines and the network operating equipment close to the connection point must be designed to cope
with absorbing the maximum possible infeed power. Additionally, asymmetrical power flows increase the
load on the neutral conductor; this must also be taken into account when planning a system.

In order to avoid further increases of the load on the conductors, storage systems must therefore always be
designed as symmetrical, three-phase rotary current units (see also Section 4.4).

4.6 Reactive power

The provisions of VDE-AR-N 4105 apply in "Energy supply" (discharging) mode. In "Energy consumption"
(charging) mode, cos =1 applies.

4.7 Active power limitation

An appropriate technical solution must ensure compliance with the specified limitation of active power at the
network connection point (e.g., EEG 6 /3/, BMU guidelines /1/). This can be achieved, on the one hand, by
setting the system components to a fixed active power rating, or by using metrology equipment (sensors) to
control the equipment, on the other. Information is provided below on how to implement active power limita-
tion with storage systems. The control unit specifications can be found in FNN publication: "Information on
technical / operational implementation of infeed management".

The following requirements apply:

If a sensor reading is not available, the system component setting must be fixed at the appropriate ac-
tive power rating.

Adherence to the permissible mean over a period of 10 minutes must be assured.

Page 10 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
4.8 Active power reduction in the event of overfrequency

In "Energy supply" (discharge) mode, the provisions of VDE-AR-N 4105 (Section 5.7.3.3) apply for active
power reduction in the event of overfrequency.
Currently, there are no specifications governing active power control in the event of underfrequency. Future
requirements in respect of intelligent load management (e.g., from the ENTSO-E Network Code-Demand
Connection) must be taken into account, if necessary.

4.9 Storage system design / NC protection

Compliance with the requirements of VDE-AR-N 4105 Section 5 must be assured in "Energy supply" and
"Energy consumption" modes.

4.10 Technical balance requirement


2
In order to comply with the requirements for claiming reimbursement as specified in 16 EEG in conjunc-
tion with 3 (1) EEG, the following conditions must be observed when operating a generator and a storage
unit at the same network connection point:

Storage unit that does not draw power from the public grid

If the storage unit is intended to feed into the public grid, electricity must not be drawn from the grid to
charge the storage unit.

Storage unit that does not feed into the pubic grid

If the storage unit is intended to charge from the public grid, a technical solution must assure that the
electricity drawn from the grid is not fed back into the public grid.

Note: From the point of view of storage units and/or storage systems, a key technological issue would be to
permit top-up charging of storage units from the grid without sacrificing entitlement to statutory reimburse-
ment. It may be possible to use suitable and appropriately tested measuring and metering systems in future
to ensure compliance with the technical balance requirements by encompassing all individual units, e.g., in
the form of virtual power plants.

4.11 Validation of compliance with technical requirements


Proof of conformity must be provided to validate compliance with the requirements.

Note 1: Certification must be provided to validate compliance with the requirements of Section 5, letters a - d
of the Guidelines for promoting stationary and decentralized battery storage systems for use in connection
with photovoltaic systems, published on Friday, April 19, 2013 /1/ . A manufacturer's declaration suffices as
long as certification is not available in the marketplace.

In addition to the validation procedures specified in VDE-AR-N 4105 and DIN V VDE V 0124-100, proof of
functional reliability of the energy flow direction sensor (EFDS) must be provided.

Manufacturers must perform function tests (type approval) on the sensors (for the storage system) and
confirm as much with a type-specific declaration of conformity. Prior to putting the sensor (for the storage

2
Network operators must reimburse system operators for electricity produced by systems that only use
renewable energies or methane; such minimum reimbursement to be dictated by 18 - 33 EEG.

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 11
system) into service, the system developer must verify installation in accordance with the manufacturer's
instructions.

Note 2: This requirement must be taken into consideration when revising test standard DIN V VDE V 0124-
100, which forms part of VDE-AR-N 4105.
Note 3: We recommend the use of the "PV storage pass".

Page 12 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
5 Connection and operating con-
cepts
5.1 General

Section 5 summarizes the valid concepts for connecting, operating and measuring storage systems in con-
text to the preceding sections. This version of the Technical Information focuses primarily on concepts that
are relevant for implementing the BMU guidelines /1/ (Sections 5.3 - 5.5).

5.2 Storage units without generator plant and consumption system, directly connected
to the grid
The technical conditions for connection (TAB), VDE-AR-N 4105, and bilateral agreements apply between
network and system operators.

5.3 Generator with storage unit without consumer

Fig. 1: Generator with storage unit without consumer

This connection variant (Fig. 1) describes the principle of full infeed. The storage unit can be incorporated
into the AC or DC path. Sensor S1 monitors the same load flow as meter Z1.

Technical balance requirement

Storage unit that does not draw power from the public grid:
Electricity may only be drawn from the grid to supply the generator plant. As such, the storage unit may
not be charged when active power is flowing in the direction of the generator/storage unit (Z1 P+>0).

Technical solution for limiting active power

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 13
Active power is controlled on the basis of the readings from sensor S1.

5.4 Storage system in the generation path

Fig. 2: Storage system in the generation path

In this variant, the storage unit is fixed to the generator plant and measured by meter Z2, together with the
generator. The storage unit can be incorporated into the AC or DC path. Sensors S1 and S2 (see Fig. 2)
monitor the same load flows as meters Z1 and Z2. Sensor S3 monitors the load flow in the consumption
path.

Technical balance requirement


The following variant must be selected and registered to operate the storage system.

Storage unit that does not draw power from the public grid:
In the generation path, electricity may only be drawn from the grid to supply the generator plant.
As such, the storage unit may not be charged when active power is flowing in the direction of the gener-
ator/storage unit (Z2 P+>0).

Technical solution for limiting active power


Active power is controlled on the basis of the readings from sensor S1 on the consumption side, or by S3 in
the consumption path and S2 in the generation path.

Note: Active power can also be controlled on the basis of S2 readings if all affected generator plants and
storage units are monitored by S2 in the generation path.

Page 14 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
The aforementioned requirements are generally transferable to concepts comprising multiple generator
plants with storage systems in the customer's system. Figure 3 shows an example of a PV system with
storage system and and a CHP system with storage system.

Fig. 3: Storage system in the generation path with CHP system

Storage unit that does not draw power from the public grid:
Active power must not flow in the direction of the storage units (i.e., S2 and S3 measure the direction of
energy flow to the storage unit (see Fig. 3).

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 15
5.5 Storage system in the consumption path

Fig. 4: Storage system in the consumption path

The storage unit is not fixed to the generator plant in this variant. Sensor S1 monitors the same load flow as
meter Z1.

Technical balance requirement


One of the two variants must be selected and registered to operate the storage system.

Storage unit that does not draw power from the public grid
If the power generated by the generator plant and interim stored in the storage system is intended to be
fed into the public grid, the storage unit must not charge from the public network. As such, the storage
unit may not be charged when active power is flowing in the direction of the generator/storage
unit/consumer (Z1 P+>0).

Storage unit that does not feed into the pubic grid
If the storage unit is intended to charge from the public grid, steps must be taken to ensure that the stor-
age unit does not feed back into the grid when discharging. As such, the storage unit may not be dis-
charged when active power is flowing into the grid (Z1 P->0).

Technical solution for limiting active power


Active power is controlled on the basis of the readings from sensor S1 on the consumption side.

Page 16 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013
Fig. 5: Storage system in the consumption path with CHP system

Storage unit that does not feed into the pubic grid: The storage unit must not feed into the public grid in this
variant. Stored electricity from the EEG generator plant and CHP generator plant is no longer eligible for
reimbursement. As such, active power must not flow from the storage unit towards the meter (Z4 P+>0) (S4
monitors the flow of energy toward the public grid). If the energy flows in the direction shown in Fig. 5, the
storage unit must not discharge.

5.6 Isolated network operating mode (in the low voltage network)

Technical balance requirement

The customer's system with storage unit is disconnected from the public grid.

The storage unit is charged from, or discharged into, the customer's own grid.

Technical solution for limiting active power

Active power management must be based on the customer's load conditions.

Operation in parallel with the public grid is permissible for a maximum period of 100 ms.

06.08.2013 | VDE|FNN Connecting and operating storage units in low voltage networks | Page 17
References

[1] BMU guideline Guidelines for promoting stationary and decentralized battery storage systems for use
in connection with photovoltaic systems, April 19, 2013
[2] NAV Ordinance governing the general terms and conditions for network connections and the use
thereof for supplying low voltage electricity, September 3, 2010
[3] EEG Act on the Priority of Renewable Energy Sources (Renewable Energy Sources Act - EEG), De-
cember 20, 2012

This Technical Information was compiled by the FNN Network of storage experts.

Page 18 | Connecting and operating storage units in low voltage networks VDE|FNN | 06.08.2013