You are on page 1of 38

Improvement of TBF

Establishment Success Rate


R1.1
Improvement of TBF Establishment Success Rate Internal Use Only

LEGAL INFORMATION

By accepting this certain document of ZTE CORPORATION you agree to the following
terms. If you do not agree to the following terms, please notice that you are not allowed
to use this document.

Copyright 2011 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.

and are registered trademarks of ZTE CORPORATION. ZTEs company


name, logo and product names referenced herein are either trademarks or registered
trademarks of ZTE CORPORATION. Other product and company names mentioned
herein may be trademarks or trade names of their respective owners. Without the prior
written consent of ZTE CORPORATION or the third party owner thereof, anyones access
to this document should not be construed as granting, by implication, estopped or
otherwise, any license or right to use any marks appearing in the document.

The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).

This document is provided as is and as available. Information contained in this


document is subject to continuous update without further notice due to improvement
and update of ZTE CORPORATIONs products and technologies.

ZTE CORPORATION

Addres NO. 55
s: Hi-tech Road South
ShenZhen
P.R.China
518057
Websit
http://dms.zte.com.cn (Technical Support)
e:
Email: TSM.Aftersales@zte.com.cn

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. I


Improvement of TBF Establishment Success Rate Internal Use Only

Revision History

Product Version Document Version Serial Number Reason for Revision


R1.0 First published
The impact of
resource configuration
on KPIs and relevant
R1.1
statistic
measurements and
counters are added.

Author

Date Document Version Prepared by Reviewed by Approved by


2010-07-05 R1.0 Hou Shuai, and Zheng Hao and Fei
Yuan Shuai
Yang Yong Aiping
2010-11-15 R1.1 Hou Shuai,
Yuan Shuai Yang Yong, and Zheng Hao
Jiao Qiang

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. II


Improvement of TBF Establishment Success Rate Internal Use Only

Intended audience: GSM network optimization engineers

Proposal: Before reading this document, you had better have the following knowledge and
skills.
SEQ Knowledge and skills Reference material
1 Null Null
2
3

Follow-up document: After reading this document, you may need the following
information.
SEQ Reference material Information
1 3GPP TS 44.060 Protocol Null
2
3

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. III
Improvement of TBF Establishment Success Rate Internal Use Only

About This Document

Summary
Chapter Description
1 About TBF Introduces the concept of TBF.
2 How to Improve the UL/DL TBF Lists the factors that may influence TBF establishment and
Establishment Success Rate gives configuration scheme to improve the UL/DL TBF
establishment success rate.
3 UL/DL TBF Establishment Lists formulae about TBF establishment success rate.
Success Rate
4 UL/DL TBF Establishment Lists TBF establishment process.
Process
5 On-site Optimization Cases Describes a TBF establishment success rate optimization
case.
6 Related Measurement and Lists the counters about TBF establishment success rate.
Counters

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. IV


Improvement of TBF Establishment Success Rate Internal Use Only

TABLE OF CONTENTS

1 About TBF.....................................................................................................................1

2 How to Improve the UL/DL TBF Establishment Success Rate..................................2

3 UL/DL TBF Establishment Success Rate....................................................................8


3.1 UL TBF Establishment Success Rate..........................................................................8
3.2 DL TBF Establishment Success Rate..........................................................................9
3.3 UL GPRS Establishment Success Rate.....................................................................11
3.4 DL GPRS Establishment Success Rate.....................................................................11
3.5 UL EGPRS Establishment Success Rate...................................................................12
3.6 DL EGPRS Establishment Success Rate...................................................................12

4 UL/DL TBF Establishment Process...........................................................................13


4.1 UL TBF Establishment Process.................................................................................13
4.1.1 One-Phase UL TBF Establishment Process on CCCH.......................................13
4.1.2 Two-Phase UL TBF Establishment Process on CCCH.......................................14
4.1.3 UL TBF Establishment Process on PACCH.......................................................15
4.2 DL TBF Establishment Process.................................................................................16
4.2.1 DL TBF Establishment Process on CCCH..........................................................16
4.2.2 DL TBF Establishment Process on PACCH.......................................................17

5 On-site Optimization Cases.......................................................................................18


5.1 A Case of TBF Establishment Success Rate Improvement for a Network in China (1)
.........................................................................................................................18
5.1.1 Background Description.....................................................................................18
5.1.2 Cause Analysis and Procedure..........................................................................18
5.1.3 Effect of Parameter Modification.........................................................................19
5.1.4 Verification of the Parameter Modification Effect................................................21
5.1.5 Change of Other Indicators After the Parameter Modification.............................22
5.2 A Case of TBF Establishment Success Rate Improvement for a Network in China (2)
.........................................................................................................................23
5.2.1 Background Description.....................................................................................23
5.2.2 Cause Analysis and Procedure..........................................................................23
5.3 A Case of TBF Establishment Success Rate Improvement for an Overseas Network
.........................................................................................................................25
5.3.1 Background Description.....................................................................................25
5.3.2 Cause Analysis and Procedure..........................................................................25

6 Related Measurement and Counters.........................................................................28


6.1 PS Basic Measurement..............................................................................................28
6.2 Usage of PS Resources.............................................................................................30
6.3 UL/DL GPRS/EDGE Data TBF .................................................................................31

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. V


Improvement of TBF Establishment Success Rate Internal Use Only

1 About TBF
The temporary block flow (TBF) is one of the most important concepts of the packet
service. It is a physical connection used by two radio resource (RR) entities to transfer
LLC PDUS in one direction on packet data radio channels. The TBF is allocated radio
resources on one or more PDCHs and comprises a number of RLC/MAC blocks carrying
one or more LLC PDUs. TBF is temporary and is maintained only for the duration of the
data transfer (that is, until there are no more RLC/MAC blocks to be transmitted and, in
RLC acknowledged mode, all the transmitted RLC/MAC blocks have been successfully
acknowledged by the receiver). Each TBF is assigned with a temporary flow identity
(TFI) by the network. The TFI acts as the MS identifier on the RLC/MAC layer. And one
TFI can be used for transmissions in different directions (uplink or downlink). The TFI is
assigned in the resource assignment message and is sent before the LLC frame of a
TBF is sent. An RLC/MAC block associated with a certain TBF must comprise a TFI. If
an RLC data block is transmitted, the TBF is identified by the TFI and the direction
(uplink or downlink) in which the RLC data block is sent. If an RLC/MAC control
message is transmitted, apart from the TFI, the transmission direction and the message
type are also used to identify the TBF.

In the GPRS/EGPRS KPI system, UL/DL TBF establishment success rate is a quite
important indicator. Whether the TBF can be successfully established determines
whether data services can be provided normally. From the view of users perception,
TBF establishment success rate determines whether users can logon the Internet and
whether they can surf the internet fluently. In a word, TBF establishment success rate is
the basis of GPRS/EDGE data transmission.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 1


Improvement of TBF Establishment Success Rate Internal Use Only

2 How to Improve the UL/DL TBF


Establishment Success Rate
To improve the UL/DL TBF establishment success rate, we need to start with the TBF
establishment process. There are many factors that influence the TBF establishment
success rate, such as PCU processing capability, Abis transmission band width, the
number of PDCHs, and the transmission BER on the Um interface and the Abis
interface. These factors will influence the whole process of TBF establishment. This
article introduces all the factors that may influence TBF establishment with the analysis
of the TBF establishment process. And it also gives suggestions on how to configure
relevant parameters to improve the UL/DL TBF establishment success rate.

1. The TBF is fundamental for the performance of all the data services. To ensure
good Internet experience for users, sufficient network resources should be
guaranteed. The allocation of Abis resource and DSP resource has a great
influence on TBF establishment. It is recommended to plan the network resources
in advance. For the method of resources allocation, see the relevant guide. To
optimize the running network, you can check the current configuration according to
the above guide, or observe the Abis resource and DSP resource congestions in
the running network by checking the statistic measurement of the GPRS UL/DL
data TBF establishment and that of the EGPRS UL/DL data TBF establishment.
And then, you can make some adjustment based on these statistics.

2. The amount of channel resources also influences TBF establishment. When the
average number of users and the maximum number of users per unit time exceed
the limit allowed by the network, some users may not be able to access the network
due to insufficient resources. This will impact users perception. In this case, you
need to take statistics of the average number of EDGE/GPRS users, the maximum
number of EDGE/GPRS users, and the maximum number of accessed users per
timeslot. And then, adjust the configuration of channel numbers. For the setting of
SDR PDCHs, see Special Subject Manual for GSM NPO---SDR Channel
Configuration.

3. PDCH configuration also influences the UL/DL TBF establishment success rate.
Theoretically, this is not a problem. In practice, the PDCH is better to be configured
on the BCCH than on the TCH. Usually, the multiplexing rate of the TCH frequency
is higher than that of the BCCH frequency, and on average, the interference on the
TCH is greater, which will impact TBF establishment. Based on statistics, the TBF
establishment success rate of the PDCH configured on the BCCH is 1%2% higher
than that of the PDCH configured on the TCH.

4. The adjustment of the access mode also influences TBF establishment. There are
two ways to access the network: two-phase access and one-phase access. The
greatest difference between them is as follows. When two-phase access is

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 2


Improvement of TBF Establishment Success Rate Internal Use Only

adopted, after the network receives CHANNEL REQUEST from the MS, it will
allocate a single block to the MS. And on this single block, the MS will send
PACKET RESOURCE REQUEST, which carries some MS request information.
According to the requirement of the MS, the network will allocate resources to it.
Only when the network receives PACKET RESOURCE REQUEST sent by the MS
on the single block, can two-phase access be successful. Because there is just one
chance for the network to receive this message, if the UL BLER is too high, or the
message is lost during Abis transmission, it is very likely that the BSC will fail to
receive this single block. For one-phase access, the BSC has more than one
chance to receive the UL block. Even if it fails to receive the UL block for one time,
the MS will send radio blocks for many times. As long as the BSC receives the UL
block during a certain period (T3166, 5S) or within a certain number of blocks
(N3104 (3 BsCvMax + 9) number of channels), TBF link can be successfully
established. When the radio environment is not desirable, one-phase access is far
easier than two-phase access. Therefore, for field optimization, if two-phase access
is changed to two-phase access not compulsory, the UL TBF establishment
success rate will be greatly increased.

5. The optimization of T3168 also influences TBF establishment. T3168 is used to set
the length of time when the MS waits for the PACKET UPLINK ASSIGNMENT
message. After the MS sends PACKET RESOURCE REQUEST, or after the MS
sends PACKET CONTROL ACKNOWLEDGEMENT to apply a new TBF, it begins
to wait for PACKET UPLINK ASSIGNMENT. And T3168 defines when the MS
should stop waiting for PACKET UPLINK ASSIGNMENT. After T3168 times out,
the MS will restart packet access process. If the MS sends PACKET RESOURCE
REQUEST for four times, it will indicate that TBF establishment fails and will report
RLC/MAC error to the upper layer. The value of T3168 will influence the TBF
establishment success rate. If the value of T3168 is small, the allowed time for TBF
establishment is short. When the radio environment is bad, the TBF establishment
success rate will be low. On the contrary, if the value is large, the MS will have
more time to judge whether TBF establishment fails. However, because the packet
access lasts longer, the system performance will deteriorate. Therefore, when the
radio environment is bad, the value of T3168 should be set larger to increase TBF
establishment success rate.

6. If the coding scheme (CS) is too high, while data services are carried out, UL TBF
should be established during DL transmission. In this case, if the uplink is interfered
or the UL RxLev is poor, improper coding adjustment will cause UL data
transmission failure. And TBF establishment will be impacted. Therefore, it is
recommended to adopt CS1 or CS2 at most.

7. Balance between the uplink and downlink. When uplink and downlink RxLevs are
unbalanced, on the edge of a cell, either uplink or downlink data cannot be
received. This will cause TBF establishment failure. To find out whether the uplink
and downlink is balanced, you can check the BTS transmit power first to see
whether it is consistent with that of the current network and whether it is too strong.
And then you can check the tower amplifier, BTS amplifier, antenna interface, and

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 3


Improvement of TBF Establishment Success Rate Internal Use Only

other relevant parts that may influence UL/DL RxLev. In traffic statistics, unbalance
problem is usually indicated by big difference between average UL RxLev and DL
RxLev, poor UL or DL RxQual (high proportion of RQ5, RQ6, and RQ7), and low
immediate allocation success rate or assignment success rate. If there is
unbalance problem in the network, you should optimize the coverage of UL/DL
signals.

8. Polling retry times also influences TBF establishment. Polling is sent to the MS
from the network side. If the MS gives no response, the system will send Polling
repeatedly. Until the number of retry times reaches the maximum value, the system
will release the MS instance. When the radio environment is not desirable, it is
recommended to set Polling retry times to 7 or above. Remarks: Large traffic on the
GB interface will cause time delay and increase the number of Polling failures to
the MS, which will also impact the TBF establishment success rate (2%).

9. Maximum blocks transmitted in each TS (BsCvMax), which is a parameter used at


the MS side. It is a GPRS cell option parameter and is broadcast to the MS in the
PSI1, PSI13 and SI13 messages, indicating the value of the maximum blocks
(BsCvMax) sent in each timeslot. This parameter decides the value of T3198 that
the MS should use when acting as the sending party, the value of T3200 used by
the MS in non-DRX mode (= 4 x the time represented by BsCvMax), and the value
of N3104max (=3 x (BsCvMax + 3) x Number of timeslots assigned on the uplink).
All the uplink data blocks sent by the MS contain the field of countdown value (CV),
and the network can use this field to calculate the number of data blocks to be sent
on the uplink TBF. In the setting of this parameter, BsCvMax, T3198, and
N3104max should be taken into consideration. For BsCvMax, if the extended TBF
is not enabled, new data arrives after the countdown starts can only be transmitted
on a new TBF link. If the extended TBF is enabled, when new data arrives after the
countdown starts, CV will count again, so that the new data can be transmitted over
the current TBF. Therefore, if this parameter value is too large, when the MS that
does not support extended UL TBF transmits UL data discontinuously, it has to wait
until TBF is released after CV is 0 and UL TBF is reestablished, so that new data
can be transmitted. If this parameter value is too small, the TBF establishment
success rate will be impacted. Therefore, proper setting of this parameter will help
increase the average transmission rate. As for T3198, proper setting of the time
spent in waiting for PACKET ACK/NACK will facilitate window switch in the PS
service. For N3104max, when N3104 reaches N3104max, the packet access
process will restart. If the preemptive judgment is not completed after the packet
access process restarts for four times, TBF establishment is regarded to be failed.
Therefore, proper setting of N3104max can help reduce preemptive judgment time
and facilitate the MS to restart the packet access process. For GPRS, this
parameter is recommended to be 6; and for EDGE, 12 is recommended.

10. DrxTimerMax optimization also influences TBF establishment. The maximum


value of the DRX timer means the longest time when the MS can work in non-DRX
mode when the MS changes from packet transmission mode to the packet idle
mode. After the MS changes from the packet transmission mode to the packet idle

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 4


Improvement of TBF Establishment Success Rate Internal Use Only

mode, it will stay in non-DRX mode for a while. When TBF is released and the MS
is in non-DRX mode, the MS will monitor all the CCCH blocks, and the PCU will
keep the MS related context. How long the MS related context will be kept is
determined by the minimum value of DrxTimerMax and NonDrxTimer. When the
network is not configured with the PCCCH, in non-DRX mode, IMMEDIATE
ASSIGHMENT COMMAND can be transmitted on the PCH and AGCH in about 40
ms, which is much shorter than the time needed to transmit this command in DRX
mode. Therefore, during the period of non-DRX mode, TBF establishment time is
short. In DRX mode, the MS can only monitor paging messages in the home
paging group, and receive IMMEDIATE ASSIGNMENT MESSAGE on all the
paging blocks and AGCH reserved blocks. And the time for the MS to receive the
paging message is long (on average, about half of the paging multiframe cycle). If
BS_PA_MFRMS is 2, the receiving period is about 235 ms. However in non-DRX
mode, MS consumes more power. Therefore, if the value of DrxTimerMax is large,
TBF establishment time can be shortened, but the MS consumes more power. If
this value is small, the MS consumes less power; however, in DRX mode, because
the addition of paging process increases the signaling load for the system, data
transmission delay will increase. In the current network, DrxTimerMax is 2 s by
default. It is suggested to modify it to 4 s.

11. NcNoDrxPer is a measurement parameter for network control, and is used at the
MS side. This parameter is broadcasted to the MS in the PSI5 message, indicating
the minimal time for the MS to stay in the non-DRX mode after sending an NC
measurement report. The default value of NC is 2 (0.48 s). It is recommended to
modify it to 4 (0.96 s).

12. The setting of N3105. During the process of packet DL transmission, BSS will set
the RRBP field on the DL RLC data block at a certain interval to notify the MS to
send the RLC/MAC CONTROL message on the relevant UL block. For a TBF, if
the RLC/MAC CONTROL message on the designated UL block is lost for over
N3105max times, T3195 will start. When T3195 times out, the network can use the
TFI resource again. The value of this parameter can be set to 10. When the field
radio environment is bad, the value can be larger (3050 is recommended).

13. PFCSupport enabled or disabled. This parameter determines whether the BSS
supports PFC function. The PFC function is realized by the joint work of the MS
and SGSN. The BSS supports the PFC process by the setting of BSC global
parameters. Therefore, the PFC function is valid only when the BSC global
parameter PFCSupport is enabled. It is recommended to enable this function. The
sites that do not need this function can adopt the default value (disabled).

14. Abis resource allocation parameters: PsAbisThs, RS, RR, RA, RM, RB, RG, and
RE

PsAbisThs refers to the use proportion of the PS channel provided by the


fully dynamic Abis resource pool. The value of this parameter indicates the
maximum Abis resources that the system can provide. The default value is

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 5


Improvement of TBF Establishment Success Rate Internal Use Only

recommended.

RS, the weight of UL throughput on the Gb interface is a dynamic Abis


adjustment parameter. The default value is 12 and the recommended value is
20.

RR, the weight of DL throughput on the Gb interface is a dynamic Abis


adjustment parameter. The default value is 12 and the recommended value is
20.

RA, the weight of number of EGPRS MS access requests is a dynamic Abis


adjustment parameter. The default value is 6 and the recommended value is
10.

RM, the weight of maximum number of bandwidth requests is a dynamic Abis


adjustment parameter. The default value is 14 and the recommended value is
25.

RB, the weight of maximum bandwidth usage is a dynamic Abis adjustment


parameter. The default value is 6 and the recommended value is 10.

RG defines the proportion of GPRS frequency carrier. Its default value is 15,
and the recommended value is 5.

RE defines the proportion of EDGE frequency carrier. Its default value is 35,
and recommended value is 10.

It is required that the sum of these seven parameters (RS, RR, RA, RM, RB, RG,
RE) should be 100.

15. Highest coding scheme of signaling TBF and GPRS/EDGE initial coding
scheme. Valid bytes of the signaling block are very few; therefore, it is
unnecessary to use high CS to transmit blocks. Using lower CS to transmit blocks
can improve TBF establishment success rate, transmission success rate,
throughput, and other relevant indicators. And the TBF abnormal failure rate can
also be reduced. It is recommended that the CS of the signaling TBF is not higher
than MCS6. GRPS initial CS is set to CS2. And EDGE initial CS should be set
according to the field radio environment. MCS4 or lower is recommended.

16. The EGPRS packet channel request access program support parameter should
be set to Yes, if the EDGE service is enabled; and it should be set to No, if the
GPRS service is enabled. If two-phase access is not compulsory, the UL access
mode is determined by the MS. However, the field experience shows that with this
function enabled, the proportion of one-phase access is increased. Because the
one-phase access success rate is higher than the two-phase access, for the
network that supports EGPRS, with this function enabled, the UL TBF
establishment success rate can be improved.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 6


Improvement of TBF Establishment Success Rate Internal Use Only

17. USFGranularity. It is assigned to the MS in the PACKET UPLINK ASSIGNMENT


message, indicating the uplink block allocation granularity of the GPRS MS from
the network when the cell employs the media control mode of dynamic allocation. 0
means that the UL block allocation granularity is 1, and 1 means that the UL block
allocation granularity is 4. If the value is small, resources can be saved and
resource allocation can be more flexible. If this value is set to 4, but there are no
four continuous granularities, allocation will fail. Therefore, it is recommended to set
this parameter to 0 on site.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 7


Improvement of TBF Establishment Success Rate Internal Use Only

3 UL/DL TBF Establishment Success


Rate

3.1 UL TBF Establishment Success Rate


UL TBF establishment success rate = Number of successful UL TBF
establishments/Number of UL TBF establishment attempts
KPI UL TBF establishment success Rate
KPI Formula 1:
Definition (Number of GPRS UL signaling TBF establishments + Number of
EGPRS UL signaling TBF establishments + Number of GPRS UL data
TBF establishments + Number of EGPRS UL data TBF establishments)
100%/(Number of GPRS UL TBF establishments in release state +
Number of GPRS UL TBF establishments with existing UL resource +
Number of GPRS UL TBF establishment requests (PACCCH) + Number
of GPRS UL TBF establishment requests (CCCH/PCCCH) + Number of
EGPRS UL TBF establishment requests in release state + Number of
EGPRSUL TBF establishment requests with existing UL resource +
Number of EGPRS UL TBF establishment requests (PACCCH) +
EGPRS UL TBF establishment requests (CCCH/PCCCH))

ZTE system did not count resources allocations and data


retransmissions after delay state into link establishment. From now on,
they should be counted as in other vendors, such as NSN.
Formula 2:
(Number of GPRS UL signaling TBF establishments + Number of
EGPRS UL signaling TBF establishments + Number of GPRS UL data
TBF establishments + Number of EGPRS UL data TBF establishments
+ Number of GPRS UL TBF resource reallocations due to LLC
transmission + Number of EGPRS UL TBF resource reallocations due
to LLC transmission + Number of GPRS UL TBF resource reallocations
due to DL TBF establishment + Number of EGPRS UL TBF resource
reallocations due to DL TBF establishment + Number of GPRS UL TBF
resumptions in extend uplink state + Number of EGPRS UL TBF
resumptions in extend uplink state) 100%/(Number of GPRS UL TBF
establishments in release state + Number of GPRS UL TBF
establishments with existing UL resource + Number of GPRS UL TBF
establishment requests on PACCH + Number of GPRS UL TBF
establishment requests on CCCH/PCCCH + Number of EGPRS UL
TBF establishments in release state + Number of EGPRS UL TBF
establishments with existing UL resource + Number of EGPRS UL TBF
establishment requests on PACCH + Number of EGPRS UL TBF
establishment requests on CCCH/PCCCH + Number of GPRS UL TBF
resource reallocation requests due to LLC transmission + Number of
EGPRS UL TBF resource reallocation requests due to LLC
transmission + Number of GPRS UL TBF resource reallocation
requests due to DL TBF establishment + Number of EGPRS UL TBF

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 8


Improvement of TBF Establishment Success Rate Internal Use Only

resource reallocation requests due to DL TBF establishment + Number


of GPRS UL TBF resumptions in extend uplink state + Number of
EGPRS UL TBF resumptions in extended uplink state)
Formula 1:
(C900040025 + C900040033 + C900040026 +
C900040034)/(C900040159 + C900040160 + C900040161
+ C900040168 + C900040163 + C900040164 +
C900040165 + C900040166)

Because the resource reallocation and data resending after


delay are not counted as link establishments in ZTE
system, the statistics of the two items can be made (Other
V6.1 vendors, such as NSN makes the statistics in this way).
KPI
Formula 2:
Formula
(C900040025 + C900040033 + C900040026 +
C900040034 + (C900040124 - C900040125) +
(C900040132 - C900040133) + (C900040122 -
C90004000123) + (C900040130 - C900040131) +
C901010001 + C901010022)/(C900040159 + C900040160
+ C900040161 + C900040168 + C900040163 +
C900040164 + C900040165 + C900040166 + C900040124
+ C90004000132 + C90004000122 + C90004000130 +
C901010001 + C901010022 )
V6.2 The same as the above
Formula 2 is recommended, because it has been used in the Hongkong
CSL project, and its KPI definition is consistent with that of other
manufacturers formula.
Enable the one-phase access function, which supports
Notes EGPRS_Channel_Req, to improve this KPI. If the function is not
enabled, the value of this KPI should be 2% lower.
This KPI formula is quoted from GSM RNO Subject-PS KPI_R1.2. The
field engineer should pay attention to the update time of this document
and refer to the latest one.

3.2 DL TBF Establishment Success Rate


DL TBF establishment success rate = Number of successful DL TBF
establishments/Number of DL TBF establishment attempts
KPI DL TBF establishment success Rate
KPI Formula 1:
Definition (Number of GPRS DL signaling TBF establishments + Number of
EGPRS DL signaling TBF establishments + Number of GPRS DL data
TBF establishments + Number of EGPRS DL data TBF establishments)
100%/(Number of GPRS DL TBF establishment requests before
T1392 expiration + Number of GPRS DL TBF establishments using DL
TBF resource + Number of GPRS DL TBF establishment requests on
PACCH + Number of GPRS DL TBF establishment requests on
CCCH/PCCCH + Number of EGPRS DL TBF establishment requests
before T1392 expiration + Number of EGPRS DL TBF establishments
using existing DL TBF resource + Number of EGPRS DL TBF

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 9


Improvement of TBF Establishment Success Rate Internal Use Only

establishment requests on PACCH + Number of EGPRS DL TBF


establishment requests on CCCH/PCCCH)

ZTE system did not count resources allocations and data


retransmissions after delay state into link establishments. From now on,
they should be counted as in other vendors, such as NSN.
Formula 2:
(Number of GPRS DL signaling TBF establishments + Number of
EGPRS DL signaling TBF establishments + Number of GPRS DL data
TBF establishments + Number of EGPRS DL data TBF establishments
+ Number of GPRS DL TBF resource reallocation requests due to UL
TBF establishment + Number of EGPRS DL TBF resource reallocation
requests due to UL TBF establishment + Number of GPRS DL TBF
resource reallocation requests due to LLC transmission + Number of
EGPRS DL TBF resource reallocation failures due to LLC transmission
+ Number of GPRS DL TBF resumptions in delay state + of EGPRS DL
TBF resumptions in delay state) 100%/(Number of GPRS DL TBF
establishment requests before T1392 expiration + Number of GPRS DL
TBF establishments using DL TBF resource + Number of GPRS DL
TBF establishment requests on PACCH + Number of GPRS DL TBF
establishment requests on CCCH/PCCCH + Number of EGPRS DL
TBF establishment requests before T1392 expiration + Number of
EGPRS DL TBF establishments using existing DL TBF resource +
Number of EGPRS DL TBF establishment requests on PACCH +
Number of EGPRS DL TBF establishment requests on CCCH/PCCCH
+ Number of GPRS DL TBF resource reallocation requests due to UL
TBF establishment + Number of EGPRS DL TBF resource reallocation
requests due to UL TBF establishment + Number of GPRS DL TBF
resource reallocation requests due to LLC transmission + Number of
EGPRS DL TBF resource reallocation failures due to LLC transmission
+ Number of GPRS DL TBF resumptions in delay state + Number of
EGPRS DL TBF resumptions in delay state)

In some areas, high DL success rate is required. For example, for some
networks in Indonesia, DL resource allocation success rate is adopted
as an indicator of DL TBF success rate. This formula, with the indicator
of 99% or above is not correct.
Formula 3:
1 (Number of GPRS DL TBF establishment failures due to database
allocation failure + Number of EGPRS DL TBF establishment failures
due to database allocation failure)/(Number of GPRS DL TBF
establishment requests before T1392 expiration + Number of GPRS DL
TBF establishments using DL TBF resource + Number of GPRS DL
TBF establishment requests on PACCH + Number of GPRS DL TBF
establishment requests on CCCH/PCCCH + Number of EGPRS DL
TBF establishment requests before T1392 expiration + Number of
EGPRS DL TBF establishments using existing DL TBF resource +
Number of EGPRS DL TBF establishment requests on PACCH +
Number of EGPRS DL TBF establishment requests on CCCH/PCCCH)
KPI V6.1 Formula 1:
Formula (C900040007 + C900040015 + C900040008 +
C900040016)/(C900040141 + C900040142 + C900040143
+ C900040144 + C900040145 + C900040146 +
C900040147 + C900040148)

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 10


Improvement of TBF Establishment Success Rate Internal Use Only

Formula 2:
(C900040007 + C900040015 + C900040008 +
C900040016 + (C900040110 - C900040111) +
(C900040116 - C900040117) + (C900040112 -
C900040113) + (C900040118 - C900040119) +
C901000001 + C901000023)/(C900040141 + C900040142
+ C900040143 + C900040144 + C900040145 +
C900040146 + C900040147 + C900040148 + C900040110
+ C900040116 + C900040112 + C900040118 +
C901000001 + C901000023)

Formula 3:
1 - (C900040109 + C900040115)/(C900040141 +
C900040142 + C900040143 + C900040144 + C900040145
+ C900040146 + C900040147 + C900040148)
V6.2 The same as the above
Formula 2 is recommended, because it has been used in the Hongkong
CSL project, and its KPI definition is consistent with that of other
manufacturers formula.
If the network requires this KPI to be larger than 99%, Formula 2 is
Notes
recommended (see KPI Definition)
This KPI formula is quoted from GSM RNO Subject-PS KPI_R1.2. The
field engineer should pay attention to the update time of this document
and refer to the latest one.

3.3 UL GPRS Establishment Success Rate


KPI UL GPRS establishment success Rate
KPI This KPI cannot be obtained. See Notes.
Definition
KPI V6.1
Formula V6.2
In the UL establishment process, only after the Packet Resource
Request message is received, GPRS or EGPRS can be determined.
Notes
Therefore, it is impossible to obtain GPRS/EGPRS establishment
success rate independently in the uplink.

3.4 DL GPRS Establishment Success Rate


KPI DL GPRS establishment success Rate
(Number of GPRS DL signaling TBF establishments + Number of
GPRS DL data TBF establishments) 100%/(Number of GPRS DL TBF
KPI establishment requests before T1392 expiration + Number of GPRS DL
Definition TBF establishments using DL TBF resource + Number of GPRS DL
TBF establishments using DL TBF resource + Number of GPRS DL
TBF establishment requests on PACCH)
KPI V6.1 (C900040007 + C900040008)/(C900040141 + C900040142
Formula + C900040143 + C900040144)

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 11


Improvement of TBF Establishment Success Rate Internal Use Only

V6.2 The same as the above


Because the UL GPRS establishment rate cannot be counted, the
Notes independent DL GPRS TBF establishment success rate is not
recommended.

3.5 UL EGPRS Establishment Success Rate


KPI UL EGPRS establishment success Rate
KPI This KPI cannot be obtained. See Notes.
Definition
KPI V6.1
Formula V6.2
In the UL establishment process, only after the Packet Resource
Request message is received, GPRS or EGPRS can be determined.
Notes
Therefore, it is impossible to obtain GPRS/EGPRS establishment
success rate independently in the uplink.

3.6 DL EGPRS Establishment Success Rate


KPI DL EGPRS establishment success Rate
(Number of EGPRS DL signaling TBF establishments + Number of
EGPRS DL data TBF establishments) 100%/(Number of EGPRS DL
KPI TBF establishment requests before T1392 expiration + Number of
Definition EGPRS DL TBF establishments using existing DL TBF resource +
Number of EGPRS DL TBF establishment requests on PACCH +
Number of EGPRS DL TBF establishment requests on CCCH/PCCCH)
(C900040015 + C900040016)/(C900040145 + C900040146
KPI V6.1
+ C900040147 + C900040148)
Formula
V6.2 The same as the above
Because the UL EGPRS establishment rate cannot be obtained,
Notes independent DL EGPRS TBF establishment success rate is not
recommended.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 12


Improvement of TBF Establishment Success Rate Internal Use Only

4 UL/DL TBF Establishment Process

4.1 UL TBF Establishment Process

4.1.1 One-Phase UL TBF Establishment Process on CCCH

MS BSS

(Packet) CHANNEL REQUEST


RACH/PRACH

IMM Assign /Packet Uplink Ass


AGCH/PAGCH
RLC DATA BLOCK( TLLI)
PDTCH
Packet Uplink Ack /Nack(TLLI)
PACCH

RLC DATA BLOCK(TLLI)


PDTCH

Packet Uplink Ack /Nack(TLLI)


PACCH

RLC DATA BLOCK(Without TLLI)


PDTCH
......

1. After the MS sends CHANNEL REQUEST or PACKET CHANNEL REQUEST on


the RACH/PRACH at the predetermined time and for a certain number of times, it
will leave packet idle mode. If the PBCCH is configured, the MS will send
messages on the PRACH; otherwise, on the RACH.

2. When the BSS at the network side receives CHANNEL REQUEST or PACKET
CHANNEL REQUEST on the CCH/PCCCH channel, it will send IMMEDIATE
ASSIGNMENT or PACKET UPLINK ASS in unacknowledged mode to allocate UL
resources for the MS.

3. For the one-phase access, after the MS receives IMMEDIATE ASSIGNMENT or


PACKET UPLINK ASS, the preemptive judgment mechanism is as follows:

1. After the MS receives the UL assignment message, the first three RLC data
blocks sent by the MS must carry TLLI. When the network receives the first
RLC data block, it will response it with the PACKET UPLINK ACK message,

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 13


Improvement of TBF Establishment Success Rate Internal Use Only

and the received TLLI must be included in the message. Then the MS will
receive the PACKET UPLINK ACK message. If the included TLLI is identical
with that of the MS, the radio resource is allocated to this MS. Otherwise, the
MS should exit.

2. When the BBS at the network side receives the first RLC data block (TLLI)
correctly, the preemptive judgment of the one-phase access is completed at
the network side.

4.1.2 Two-Phase UL TBF Establishment Process on CCCH

MS BSS

(Packet) CHANNEL REQUEST


RACH/PRACH

IMM ASSIGN/Packet Uplink Ass


AGCH/PAGCH
Packet Resource Request (with TLLI)
PACCH
Packet Uplink Assign(with TLLI)
PACCH
RLC DATA BLOCK
PDTCH

Packet Uplink Ack /Nack


PACCH

RLC DATA BLOCK


PDTCH
......

1. During the two-phase access, the IMM ASSIGN or PACKET UPLINK ASS
message will allocate a PACCH single block to the MS. With this single block, the
MS sends the PACKET RESOURCE REQUEST message (with TLLI) to the
network.

2. According to the information of PACKET RESOURCE REQUEST, the network will


send PACKET UPLINK ASSIGN (with TLLI) to the MS to allocate specific channel
resources.

3. The preemptive judgement is as follows:

When the MS receives the second PACKET UPLINK ASSIGN, it will compare
whether the TLLI included in this message is consistent with that included in
PACKET RESOURCE REQ sent by the MS. If it is, the preemption succeeds.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 14


Improvement of TBF Establishment Success Rate Internal Use Only

4.1.3 UL TBF Establishment Process on PACCH

MS BSS

RLC DATA BLOCK


PDTCH
Packet Downlink Ack /Nack
PACCH
Channel request
Packet Uplink Ass ignment
PACCH

RLC DATA BLOCK


PDTCH
Packet Uplink Ack /Nack
PACCH

RLC DATA BLOCK


PDTCH
......

1. During DL TBF period, the MS sends PACKET DOWNLINK ACK/NACK including


descriptive information about the channel request on the PACCH to launch the
packet access process.

2. The BSS sends PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT


RECONFIGURE on the PACCH to allocate resources to the MS.

3. The MS transfers to the assigned UL PDCH and starts sending RLC data blocks
(without TLLI).

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 15


Improvement of TBF Establishment Success Rate Internal Use Only

4.2 DL TBF Establishment Process

4.2.1 DL TBF Establishment Process on CCCH

MS BSS

IMM ASSIGN/Packet Downlink Ass


AGCH/PAGCH

Packet Polling request (With TFI)


PACCH

Packet Control Acknowledgement (AB)


PACCH
Packet Power Ctrl/Timing Advance
PACCH
TIMING ADVANCE
PACCH

RLC DATA BLOCK


PDTCH
......

1. If there is a request to send LLC PDU to the MS in packet idle mode at the BBS
side, the DL TBF establishment process is triggered.

2. The network sends the DL assignment message PACKET DOWNLINK ASS or


IMM ASSIGN on the PAGCH or AGCH block of the MS. If the PBCCH is
configured, the network will send messages on the PAGCH; otherwise, on the
AGCH.

3. The DL assignment message should include timing advance. If the BSS does not
have valid initial timing advance (TA), it should send PACKET POLLING
REQUEST to notify the MS to send PACKET CONTROL ACKNOWLEDGEMENT,
so that it can obtain timing advance.

4. After the MS receives the above message, it will send four burst pulses PACKET
CONTROL ACK. And the BSS uses these four access burst pulses to calculate the
initial timing advance of the MS.

5. The network sends PACKET POWER CONTROL/TIMING ADVANCE to provide


the MS with TA. If the assignment message contains no TA value, before the MS
receives a valid TA, normal burst is not allowed to send on the UL link (such as the
PACKET DOWNLINKACK/NACK message).

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 16


Improvement of TBF Establishment Success Rate Internal Use Only

4.2.2 DL TBF Establishment Process on PACCH

MS BSS
......
RLC DATA BLOCK
PDTCH

Packet Downlink Ass ignment


PACCH Or Packet Timeslot Reconfigure

RLC DATA BLOCK


PDTCH
......

1. During UL transmission, The BSS at the network side sends PACKET DOWNLINK
ASSIGNMENT or PACKET TIMESLOT RECONFIGURE through the PACCH to
the MS, so as to launch DL TBF establishment. If PACKET TIMESLOT
RECONFIGURE is sent, this message should include
DOWNLINK_TFI_ASSIGNMENT field. And the MS multi-timeslot limit must be
observed.

2. After the MS receives the assignment message and after the TBF start time (if
provided), the MS should transfer to the assigned PDCH to transmit the DL data.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 17


Improvement of TBF Establishment Success Rate Internal Use Only

5 On-site Optimization Cases

5.1 A Case of TBF Establishment Success Rate


Improvement for a Network in China (1)

5.1.1 Background Description

ZTES GPRS optimization engineer checked the GPRS performance data of the
operators current network and found that the UL/DL TBF establishment success rates of
some BSCs were not high. The performance data of the whole network during busy
hours at night is shown in the following table.
Number UL
of UL Number Number TBF
Number Esta
TBF of UL of UL Number
of UL blish
Establish TBF TBF of UL
Comple Signaling ment
Start ment Establis Establish Data TBF
tion TBF Succ
Time Requests hment ment Establish
time Establish ess
(UL Reques Requests ment
ment Rate
Resource ts (on (on Times
Times (%)
Available PACCH) CCCH)
)
2008- 2008-11- 96.78
19976048 6269943 11559545 10739971 25846888
11-16 17 %
2008- 2008-11- 96.95
19671183 6031754 11152743 11510653 24220614
11-17 18 %

From the above table, we can see that the UL TBF establishment rate of the whole
network is about 96%97%, which is far from our optimization target.

5.1.2 Cause Analysis and Procedure

After the analysis of the performance data during UL TBF establishment, the engineers
found that most UL TBF establishment failures occurred during the link establishment
process of two-phase access on CCCH. The following table shows the performance data
of the whole network during busy hours at night.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 18


Improvement of TBF Establishment Success Rate Internal Use Only

Numb
er of Number
Numb Numb
Num ailed of failed
er of er of
ber Numb UL UL TBF
Num failed failed
of er of TBF Establis
ber UL Numb UL
UL ailed Establ hment
of TBF er of L TBF
TBF UL ishme Reques
UL Establ TBF Establ
Co Esta TBF nt ts
TBF ishme Establ ishme
mp blish Establ Reque (Resour
Esta nt ishme nt
Start leti ment ishme st ce
blish Reque nt Reque
Time on Req nt s(Due Reques
ment sts Reque sts
tim uest Reque to t is not
Req (Due sts ( Due
e s sts One- Receive
uest to (on to
(UL (Time Phase d on
s (on Other CCCH Other
Reso out on Comp CCCH
PAC Factor ) Factor
urce PACC etition During
CH) s on s on
Avail H) Failur Two-
PACC CCCH
able) e on Phase
H) )
CCCH Access)
)
200
2008- 8- 1997 6269 115595
3 21160 6 1043693 115955
11-16 11- 6048 943 45
17
200
2008- 8- 19671 6031 111527
8 19028 118 934292 112291
11-17 11- 183 754 43
18

The above table indicates that UL TBF establishment failures caused by resource
request not received on the CCCH during two-phase access account for 87%-89%.
Therefore, it is crucial to reduce this kind of failures.

In order to reduce this kind of failures and simplify TBF establishment process to speed
up TBF establishment, the engineers decided to enable one-phase access. That
requires modifying the parameter of TwoPhaseAccess from Yes to No.

5.1.3 Effect of Parameter Modification

After the value of TwoPhaseAccess was modified, the UL TBF establishment success
rate was greatly improved. The following table shows the performance data of the whole
network during busy hours at night after the parameter was modified.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 19


Improvement of TBF Establishment Success Rate Internal Use Only

Numb
er of Numb
UL er of Numb
TBF UL Number er of
Establ TBF of UL UL Number of
Number of
ishme Establ TBF Signal UL Data
Compl UL TBF
Start nt ishme Establish ing TBF
etion Establishme
Time Reque nt ment TBF Establish
time nt Success
sts Reque Request Establ ments
Rate (%)
(UL sts (on ishme Times
Resou (on CCCH) nt
rce PACC Times
Availa H)
ble)
2008- 2008- 249721 631183 224337
10879732 19072081 98.44%
11-18 11-19 28 6 59
2008- 2008- 243067 603344 220544
10678961 18317672 98.42%
11-19 11-20 75 9 48
2008- 2008- 241556 595766 220661
10635179 18065659 98.49%
11-20 11-21 75 7 26

According to the above table, the UL TBF establishment rate of the whole network after
the network modification is about 98.4%, which is a satisfactory result.

Further observation of the performance data during UL TBF establishment showed that
the number of UL TBF establishment failures caused by resource request not received
on the CCCH during two-phase access decreased dramatically. The following table
shows the performance data of the whole network during busy hours at night.
Numb
er of Number
Num Numb Numb
Num failed of failed
ber er of er of
ber UL UL TBF
Num of failed failed
of Numb TBF Establis
ber faile UL UL
UL er of Establ hment
of d UL TBF TBF
TBF UL ishme Reques
UL TBF Establ Establ
Esta TBF nt ts
TBF Esta ishme ishme
Com blish Establ Reque (Resour
Esta blish nt nt
Start pleti ment ishme sts ce
blish ment Reque Reque
Time on Req nt (Due Reques
ment Req sts sts
time uest Reque to t is not
Req uest (Due ( Due
s sts One- Receive
uest s to to
(UL (on Phase d on
s (on (Tim Other Other
Reso CCCH Comp CCCH
PAC eout Factor Factor
urce ) etition During
CH) on s on s on
Avail Failur Two-
PAC PACC CCCH
able) e on Phase
CH) H) )
CCCH Access)
)
2008- 2008- 2497 63118 108797
1 29046 275 217515 47614
11-18 11-19 2128 36 32
2008- 2008- 2430 6033 106789
2 27315 626 218043 44392
11-19 11-20 6775 449 61
2008- 2008- 2415 5957 82 28368 106351 783 218027 45207

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 20


Improvement of TBF Establishment Success Rate Internal Use Only

Numb
er of Number
Num Numb Numb
Num failed of failed
ber er of er of
ber UL UL TBF
Num of failed failed
of Numb TBF Establis
ber faile UL UL
UL er of Establ hment
of d UL TBF TBF
TBF UL ishme Reques
UL TBF Establ Establ
Esta TBF nt ts
TBF Esta ishme ishme
Com blish Establ Reque (Resour
Esta blish nt nt
Start pleti ment ishme sts ce
blish ment Reque Reque
Time on Req nt (Due Reques
ment Req sts sts
time uest Reque to t is not
Req uest (Due ( Due
s sts One- Receive
uest s to to
(UL (on Phase d on
s (on (Tim Other Other
Reso CCCH Comp CCCH
PAC eout Factor Factor
urce ) etition During
CH) on s on s on
Avail Failur Two-
PAC PACC CCCH
able) e on Phase
CH) H) )
CCCH Access)
)
11-20 11-21 5675 667 79

According to the above table, the number of UL TBF establishment failures caused by
resource request not received on the CCCH during two-phase access decreased from
one million to around 210,000. Therefore, the parameter modification is quite effective.

5.1.4 Verification of the Parameter Modification Effect

Test site 1: an exhibition center

The screenshot of the test result is as follows.

Test result: The engineers conducted a WAP login test for the BTS at the exhibition
center and found that the WAP service of the BTS was normal and the one-phase
access function was also normal.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 21


Improvement of TBF Establishment Success Rate Internal Use Only

Test site 2: Funan Primary School

The screenshot of the test result is as follows.

Test result: The engineers conducted a WAP login test for the BTS of Funan Primary
School and found that the WAP service of this BTS was normal and the one-phase
access function was normal too.

Test site 3: Xinshikong Building

The screenshot of the test result is as follows.

Test result: The engineers conducted a WAP login test for the BTS of the Xinshikong
Building and found that the WAP service of this BTS was normal and the one-phase
access function was normal too.

5.1.5 Change of Other Indicators After the Parameter Modification

The modification of the parameter of TwoPhaseAccess only affects TBF establishment.


Therefore, we only need to look at the indicators that are relevant to the TBF

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 22


Improvement of TBF Establishment Success Rate Internal Use Only

establishment process. The following table shows the relevant performance data of the
whole network during busy hours at night.
Numb
Number Numb
Numb er of Number
Numb of er of
er of GPRS of Number
er of GPRS GPRS
PRS UL GPRS of
PRS UL TBF UL
UL TBF UL TBF GPRS
UL Abnorm TBF
Compl TBF Abnor Release UL TBF
Start TBF al Relea
etion Signal mal s Due Release
Time Data Release ses
time ing Relea to s Due
Establ s Due Due to
Establ ses Instanc to Inner
ishme to Force
ishme Due to e Abnorm
nt N3101 d
nt N3103 Suspen al
Times Overflo Relea
Times Overfl sion
w se
ow
2008- 2008- 107399 258468
860180 325270 140031 1658 660098
11-16 11-17 71 88
2008- 2008- 115106 242206
792474 318434 112116 1421 619080
11-17 11-18 53 14
2008- 2008- 224337 190720
526025 421180 101486 970 621291
11-18 11-19 59 81
2008- 2008- 220544 183176
506556 402282 95179 816 594196
11-19 11-20 48 72
2008- 2008- 220661 180656
500110 406515 102641 839 582291
11-20 11-21 26 59

The above table indicates that after the parameter modification, the number of
successful GPRS UL signaling TBF establishments improved a lot. This is mainly
because the number of establishment failures reduced after the parameter modification.
However, because of various factors, the number of successful GPRS UL data TBF
establishments did not change much. Therefore, parameter modification improved the
stability of the network performance, and the influence on other indicators was very little.

5.2 A Case of TBF Establishment Success Rate


Improvement for a Network in China (2)

5.2.1 Background Description

In one ZTE network, the GPRS UL TBF establishment success rate was only 92% on
average, which was very low.

5.2.2 Cause Analysis and Procedure

Through the analysis of UL TBF establishment success rate, there were a lot of failures
that were caused by resource request not received during the two-phase access.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 23


Improvement of TBF Establishment Success Rate Internal Use Only

Number of
GPRS UL TBF Number of
Establishmen GPRS UL
Number of t Failures TBF
GPRS UL TBF (CCCH/PCCC establishm
Establishmen H) (Resource ent
UL TBF t Failures Request is Failures
Establis (Due to One- not Received (CCCH/PC
Time GERAN hment Phase During Two- CCH)
Granula Sub- Succes Competition Phase (Other
rity Network s Rate Failure) Access) Reasons)
1.18 Tongliang,
22:00- Tongnan iBSC
23:00 (19) 95.69% 0 6476 495
1.19 Tongliang,
22:00- Tongnan
23:00 iBSC(19) 95.64% 0 6232 543
1.20 Tongliang,
22:00- Tongnan
23:00 iBSC(19) 95.76% 0 6855 587

At present, the parameter of TwoPhaseAccess is Yes by default. Because the RLC


layer adopts acknowledged mode, generally data TBF is established in two-phase
access mode (whether the MS access bit is not more than 8 blocks or more than 8
blocks). That is, whether EGPRS PACKET CHANNEL REQ is supported, the MS will
adopt two-phase access mode. In this mode, the network must receive PACKET
RESORCE REQUEST sent from the MS on a single block. There is only one chance to
receive this message. If the UL BLER is high or data is lost on the Abis interface, the
BSC is very likely to fail to receive the single block. When the value of
TwoPhaseAccess is set to No, the MS is allowed to adopt one-phase access. In this
case, which access mode is to be used is determined by whether the MS supports
EGPRS PACKET CHANNEL REQ. Usually, the MS adopts one-phase access for
signaling TBF. Therefore, when one-phase access is allowed, TBF establishment
success rate can be improved.

Solution: The field engineer disabled the compulsory two-phase access mode. That is, to
set the TwoPhaseAccess parameter on module 3 and module 4 to No. The following
table shows the data comparison before and after the modification.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 24


Improvement of TBF Establishment Success Rate Internal Use Only

Number of
GPRS UL
TBF
Establishme
Number of nt Failures Number of
GPRS UL (CCCH/PCC GPRS UL
TBF CH) TBF
Establish (Resource establishm
ment Request Is ent
UL TBF Failures not Failures
Establish (Due to Received (CCCH/PC
ment One-Phase During Two- CCH)
GERAN Sub- Success Competitio Phase (Other
Time network Rate n Failure) Access) Reasons)
Tongliang,Tongn
1.18 an iBSC(19) 95.69% 0 6476 495
Bef
Tongliang,Tongn
ore
1.19 an iBSC(19) 95.64% 0 6232 543
Mod
ifica Tongliang,Tongn
tion 1.20 an iBSC(19) 95.76% 0 6855 587
Tongliang,Tongn
1.21 an iBSC(19) 96.68% 0 3941 451
Afte
Tongliang,Tongn
r
1.22 an iBSC(19) 96.51% 1 4474 499
Mod
ifica Tongliang,Tongn
tion 1.23 an iBSC(19) 96.18% 0 4695 530

5.3 A Case of TBF Establishment Success Rate


Improvement for an Overseas Network

5.3.1 Background Description

The UL TBF establishment success rate of one ZTEs overseas network is just around
90% on average during 24 hours, which is far from the operators requirement (96%).

5.3.2 Cause Analysis and Procedure

The analysis of UL TBF establishment success rate showed that a lot of UL TBF
establishment failures were caused by resource request not received on the CCCH
during two-phase access. At present, the parameter of TwoPhaseAccess is set to Yes
by default. Because the RLC layer adopts acknowledged mode, generally data TBF is
established in two-phase access mode (whether the MS access bit is not more than 8
blocks or more than 8 blocks). That is, whether EGPRS PACKET CHANNEL REQ is
supported, the MS will adopt the two-phase access mode. In this mode, the network
must receive PACKET RESORCE REQUEST sent from the MS on a single block. There
is only one chance to receive it. If the UL BLER is high or data is lost on the Abis

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 25


Improvement of TBF Establishment Success Rate Internal Use Only

interface, the BSC is very likely to fail to receive the single block. When the value of
TwoPhaseAccess is set to No, the MS is allowed to adopt one-phase access mode. In
this case, which access mode is to be used is determined by whether the MS supports
EGPRS PACKET CHANNEL REQ. Usually, the MS adopts one-phase access for
signaling TBF. Therefore, when one-phase access is allowed, TBF establishment
success rate can be improved.

Based on this analysis, the field engineer adjusted BSC1 of the current network on
March 22 to allow one-phase access. The following table shows the data collected
before and after the modification.
ADDIS-
Number of
GPRS UL
TBF
ADDIS- Establish
GPRS UL ADDIS- ment
TBF Resource Failures
Establish ADDIS-One- Request Is (CCCH/PC
ment Phase not Received CCH)
Success Competition During Two- (Other
Object Time Rate Failure Phase Access Reasons)
BSC1 2010-03-13 92.07 2 65680 7075
BSC1 2010-03-14 93.29 0 52695 7394
BSC1 2010-03-15 89.45 0 85692 6645
BSC1 2010-03-16 89.39 2 99289 8884
BSC1 2010-03-17 90.98 0 84783 6445
BSC1 2010-03-18 90.46 0 84738 5820
BSC1 2010-03-19 90.74 0 107911 6098
BSC1 2010-03-20 88.88 3 134056 6472
BSC1 2010-03-21 92.35 1 75041 6705
BSC1 2010-03-22 93.2 2 37118 2849
BSC1 2010-03-23 96.8 15 3169 202
BSC1 2010-03-24 96.36 4 3226 212
BSC1 2010-03-25 96.98 4 3365 242
BSC1 2010-03-26 96.69 1 3874 369
BSC1 2010-03-27 97.24 1 3769 421
BSC1 2010-03-28 97.55 7 2467 418

The operators requirement of TBF establishment success rate for this network is 96%.
After the two-phase access mode is changed to one-phase access mode, UL TBF
establishment success rate is greatly increased to meet this requirement.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 26


Improvement of TBF Establishment Success Rate Internal Use Only

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 27


Improvement of TBF Establishment Success Rate Internal Use Only

6 Related Measurement and Counters

6.1 PS Basic Measurement


Counter ID Counter Name

C900040108 Number of GPRS DL TBF establishment requests


Number of GPRS DL TBF establishment failures due to database
C900040109
allocation failure
Number of GPRS DL TBF resource reallocation requests due to UL
C900040110
TBF establishment
Number of GPRS DL TBF resource reallocation failures due to UL
C900040111
TBF establishment
Number of GPRS DL TBF resource reallocation requests due to
C900040112
LLC transmission
Number of GPRS DL TBF resource reallocation failures due to LLC
C900040113
transmission
C900040114 Number of EGRPS DL TBF establishment requests
Number of EGPRS DL TBF establishment failures due to database
C900040115
allocation failure
Number of EGPRS DL TBF resource reallocation requests due to
C900040116
UL TBF establishment
Number of GPRS DL TBF resource reallocation failures due to UL
C900040117
TBF establishment
Number of EGPRS DL TBF resource reallocation requests due to
C900040118
LLC transmission
Number of EGPRS DL TBF resource reallocation failures due to
C900040119
LLC transmission
C900040120 Number of GPRS UL TBF establishment requests
Number of GPRS UL TBF establishment failure due to database
C900040121
allocation failure
Number of GPRS UL TBF resource reallocation requests due to DL
C900040122
TBF establishment
Number of GPRS UL TBF resource reallocation failures due to DL
C900040123
TBF establishment
Number of GPRS UL TBF resource reallocation requests due to
C900040124
LLC transmission
Number of GPRS UL TBF resource reallocation failure due to LLC
C900040125
transmission
Number of GPRS UL TBF resource reallocation requests for
C900040126
resource request
Number of GPRS UL TBF resource reallocation failure due to
C900040127
resource request

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 28


Improvement of TBF Establishment Success Rate Internal Use Only

Counter ID Counter Name

C900040128 Number of EGPRS UL TBF establishment requests


Number of EGPRS UL TBF establishment failure due to database
C900040129
allocation failure
Number of EGPRS UL TBF resource reallocation requests due to
C900040130
DL TBF establishment
Number of EGPRS UL TBF resource reallocation failures due to DL
C900040131
TBF establishment
Number of EGPRS UL TBF resource reallocation requests due to
C900040132
LLC transmission
Number of EGPRS UL TBF resource reallocation failure due to LLC
C900040133
transmission
Number of EGPRS UL TBF resource reallocation requests for
C900040134
resource request
C901200067:Number of EGPRS UL TBF resource reallocation
C900040135
failure due to resource request
C900040136 Average number of available PDCH
Number of forcing conversation dynamic from PDCH to TCH by
C900040137
BSC
C900040138 Number of PDCH used by TBF in each cell
C900040139 Maximum number of used PDCH
C900040140 Average number of used PDCH
Number of GPRS DL TBF establishment requests before T1392
C900040141
expiration
Number of GPRS DL TBF establishment using existing DL TBF
C900040142
resource
C900040143 Number of GPRS DL TBF establishment requests on PACCH
Number of GPRS DL TBF establishment requests on
C900040144
CCCH/PCCCH
Number of EGPRS DL TBF establishment requests before T1392
C900040145
expiration
C900040146 Number of EGPRS DL TBF establishment using DL TBF resource
C900040147 Number of EGPRS DL TBF establishment requests on PACCH
Number of EGPRS DL TBF establishment requests on
C900040148
CCCH/PCCCH
C900040149 Number of GPRS DL signaling TBF release due to N3105 overflow
C900040150 Number of GPRS DL signaling TBF release due to other reasons.
C900040151 Number of GPRS DL signaling TBF forcing release by control plane
Number of GPRS DL signaling TBF release due to instance
C900040152
suspension.
C900040153 Number of GPRS DL signaling TBF release due to inner abnormal.
C900040154 Number of EGPRS DL signaling TBF release due to N3105 overflow
C900040155 Number of EGPRS DL signaling TBF release due to other reasons

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 29


Improvement of TBF Establishment Success Rate Internal Use Only

Counter ID Counter Name

Number of EGPRS DL signaling TBF forcing release by control


C900040156
plane
Number of EGPRS DL signaling TBF release due to instance
C900040157
suspension
C900040158 Number of EGPRS DL signaling TBF release due to inner abnormal
C900040159 Number of GPRS UL TBF establishments in release state
C900040160 Number of GPRS UL TBF establishment with existing UL resource
C900040161 Number of GPRS UL TBF establishment requests on PACCH
C900040162 Number of EGPRS UL data TBF establishments on PACCH
C900040163 Number of EGPRS UL TBF establishments in release state
C900040164 Number of EGPRS UL TBF establishment with existing UL resource
C900040165 Number of EGPRS UL TBF establishment requests on PACCH
Number of EGPRS UL TBF establishment requests on
C900040166
CCCH/PCCCH
C900040167 Number of dynamic PDCH preemption for CS service
Number of GPRS UL TBF establishment requests on
C900040168
CCCH/PCCCH
C900040169 Number of GPRS DL data TBF establishments on PACCH
C900040170 Number of EGPRS DL data TBF establishments on PACCH
C900040171 Number of GPRS UL data TBF establishments on PACCH

6.2 Usage of PS Resources


Counter ID Counter Name
C901040001 Maximum number of Abis TS used
C901040002 Average number of Abis TS used
C901040004 Average number of unavailable PDCH
C901040005 Number of available static PDCH
C901040006 Number of unavailable static PDCH
C901040009 Time of DL PDCH congestion
C901040010 Time of UL PDCH congestion
C901040011 Time of PDCH used at least one UL/DL TBF exists
C901040012 Time of PDCH used at least one UL/DL EGPRS TBF exists
C901040013 Time of PDCH used at least one DL TBF exists
C901040014 Time of PDCH used at least one UL TBF exists

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 30


Improvement of TBF Establishment Success Rate Internal Use Only

6.3 UL/DL GPRS/EDGE Data TBF


Counter ID Counter Name
C901190002 Number of GPRS UL TBF establishment requests on CCCH
C901190003 Number of EGPRS UL TBF establishment requests on CCCH
C901190004 Number of GPRS UL TBF establishment requests on PCCCH
C901190005 Number of EGPRS UL TBF establishment requests on PCCCH
C901190006 Number of GPRS UL TBF establishment requests on PACCH
Number of GPRS UL TBF establishment failure due to Abis
C901190015
congestion
Number of GPRS UL TBF establishment failure due to RR
C901190016
congestion
Number of GPRS UL TBF establishment failure due to UPPB-DSP
C901190017
channel congestion
C901190018 Number of GPRS UL TBF establishment channel allocate success
C901200002 Number of GPRS UL TBF establishment requests on CCCH
C901200003 Number of EGPRS UL TBF establishment requests on CCCH
C901200004 Number of GPRS UL TBF establishment requests on PCCCH
C901200005 Number of EGPRS UL TBF establishment requests on PCCCH
C901200006 Number of GPRS UL TBF establishment requests on PACCH
Number of EGPRS UL TBF establishment failure due to Abis
C901200015
congestion
Number of EGPRS UL TBF establishment failure due to RR
C901200016
congestion
Number of EGPRS UL TBF establishment failure due to UPPB-
C901200017
DSP channel congestion
Number of EGPRS UL TBF establishment channel allocate
C901200018
success
Number of GPRS DL TBF establishment requests on
C901170002
CCCH/PCCCH
C901170003 Number of GPRS DL TBF establishment requests on PACCH
C901170004 Number of GPRS DL TBF establishment failure due to CPU
Number of GPRS DL TBF establishment failure due to not support
C901170005
DTM
Number of GPRS DL TBF establishment failure due to Abis
C901170007
congestion
Number of GPRS DL TBF establishment failure due to RR
C901170008
congestion
Number of GPRS DL TBF establishment failure due to UPPB-DSP
C901170009
channel congestion
C901170010 Number of GPRS DL TBF establishment channel allocate success
Number of EGPRS DL TBF establishment requests on
C901180002
CCCH/PCCCH
C901180003 Number of EGPRS DL TBF establishment requests on PACCH
C901180004 Number of EGPRS DL TBF establishment failures due to CPU

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 31


Improvement of TBF Establishment Success Rate Internal Use Only

Counter ID Counter Name

Number of EGPRS DL TBF establishment failures due to not


C901180005
support DTM
Number of EGPRS DL TBF establishment failure due to Abis
C901180007
congestion
Number of EGPRS DL TBF establishment failure due to RR
C901180008
congestion
Number of EGPRS DL TBF establishment failure due to UPPB-
C901180009
DSP channel congestion
Number of EGPRS DL TBF establishment channel allocate
C901180010
success

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 32

You might also like