Natural Gas Processing Plants PDF
Natural Gas Processing Plants PDF
Processing
Plants
2
Contents.
3 Introduction
8 NGL plants
Introduction.
Helium plants
Non hydrocarbons Separation, purification, liquefaction
e.g. nitrogen, helium, carbon dioxide,
hydrogen sulphide, water, etc. NRU
Nitrogen rejection units
Methane (C1)
Ethane (C2)
NGL plants
Propane (C3) Natural gas liquids
Natural gas LPG NGL
ex well Butane (C4) LPG plants
Liquefied petroleum gas
Heavier fractions:
- Pentanes plus (C5+)
- Natural Gasoline
- Condensate
Extraction of hydrocarbons
and LPG plants.
Extraction of hydrocarbons
Due to their added value, heavier hydrocarbons LPG plants
are often extracted from natural gas and fractio- LPG (Liquefied Petroleum Gas) is widely used as To achieve high C3 recovery rates, Linde imple-
nated by using several tailor made processing alternative fuel for cars, but is also suitable as a ments an absorber column upstream of the de-
steps. chemical feedstock. It consists of propane and ethanizer. Here the FEED gas is scrubbed by
butane (C3/C4). using a light hydrocarbon reflux coming from
the top of the deethanizer. LPG is separated
For the recovery of LPG/C3+ the Engineering from the heavier hydrocarbons down-stream
Division offer an absorber process, which of the deethanizer using a destillation column.
guarantees recovery rates as high as 99.9 %,
while at the same time featuring low specific
energy consumption. Furthermore the toler-
able CO2 content of the feed gas is higher
than for conventional expander processes.
NG Sales gas
LPG
Absorber
C3+
7
References for
LPG/C3+ recovery plants.
LPG plant
in Constanta, Romania
FEED gas capacity: 160,000 Nm/h
Customer: Petrom S.A.
(member of OMV Group)
Start of production: 2009
NGL plants.
NGL plants
NGL consists of ethane and heavier hydrocarbons For the recovery of NGL/C2+ the Engineering
(C2+) and constitutes an ideal feedstock for steam Division offers a well proven expander process
crackers producing olefins. It has a higher sales enabling recovery rates up to 98 %. The cryo-
value compared to the pipeline gas itself, which genic process utilizes an expander to provide
justifies an extraction. the refrigeration duty, which is necessary for the
partial liquefaction of the natural gas upstream
of the destillation process.
NG Sales gas
C2
Refrigerant
Demethanizer Deethanizer
C3+
C2+ recovery and fractionation plant C2+ recovery and fractionation plant
in Rayong, Thailand in Krst, Norway
FEED gas capacity: 390,000 Nm/h FEED gas capacity: 670,000 Nm/h
Customer: Petroleum Authority Customer: Statoil for
of Thailand Statpipe Group
Start of production: 1997 Start of production: 1986
10
Extraction of non-hydrocarbons.
Natural gas is a mixture of gases containing Nitrogen rejection units (NRU) Helium recovery and liquefaction plants
primarily hydrocarbon gases. It is colorless and Nitrogen is removed from natural gas to reduce Helium is a rare gas, which is recovered from
odorless in its pure form. It is the cleanest fossil transportation volumes and increase heating natural gas when present in sufficient concen-
fuel with the lowest carbon dioxide emissions. value. In some cases nitrogen rejection units are trations. Linde Engineering offers a well-proven
Natural gas is an important fuel source as well integrated within LNG plants to limit the nitro- cryogenic process for the recovery of high purity
as a major feedstock for fertilizers and petro- gen content in the fuel gas or to recover meth- helium (> 99.999 %). High purity helium is used
chemicals. ane from tank return or end flash gas. for special applications such as space technology
or the realization of superconductivity.
The Linde Engineering Division typically using a
double column process for the removal of nitro- To attain high purity the raw helium is first re-
gen. This maximizes the heat integration of the covered from natural gas in a cold box. Down-
process. Depending on the nitrogen content of stream of the cold box it is purified in a pressure
the feed gas, an additional enrichment column swing adsorption (PSA) unit and than liquefied
may be foreseen upstream of the actual removal for storage at temperatures of about -270C.
process. The Engineering Division has technologies for
each process step and is in a position to offer
complete plants on a turn-key lumpsum basis.
Double column
NG
N2
CH4
11
References for
NRUs and helium plants.
NRU integrated in Pluto LNG plant Helium recovery and liquefaction plant
in Karratha, Australia in Darwin, Australia
FEED gas capacity: 78,000 Nm/h Production rate of liquid helium: 2,6 t/d
Customer: Woodside Burrup Pty. Ltd. Customer: BOC Australia
Start of production: 2010 Start of production: 2009
NRU integrated in Snhvit LNG plant Helium recovery and liquefaction plant
in Hammerfest, Norway in Skikda, Algeria
FEED gas capacity: 71,400 Nm/h Production rate of liquid helium: 10 t/d
Customer: Snhvit Group Customer: Helison S.p.A.
Start of production: 2007 Start of production: 2005
NRU
in Onslow, Australia
FEED gas capacity: 47,000 Nm/h
Customer: BHP Petroleum Helium recovery and liquefaction plant
Start of production: 1994 in Skikda, Algeria
Designing Processes - Constructing Plants.
Lindes Engineering Division continuously develops extensive process engineering know-how in the planning,
project management and construction of turnkey industrial plants.
More than 3,800 plants worldwide document the leading position of the Engineering Division in international plant construction.
HE/1.1.e/09
Engineering Division head office:
Linde AG
Engineering Division
Pullach, Germany
Phone: +49.(0)89.7445-0
Engineering Division Linde Impianti Italia S.p.A.
Fax: +49.(0)89.7445-4908 Linde Engenharia do Brasil Ltda. Linde Engineering India Pvt. Ltd. Linde Engineering Division
Schalchen Plant info@linde-le.com Rome, Italy Rio de Janeiro, Brazil Vadodara, Gujarat, India Beijing Representative Office
Tacherting, Germany Phone +39.066.5613-1 Phone +55.21.3545-2255 Phone +91.265.3056-789 Beijing, P.R. of China
Phone +49.8621.85-0 Fax +39.066.5613-200 Fax +55.21.3545-2257 Fax +91.265.2335-213 Phone +86.10.6437-7014
Fax +49.8621.85-6620 r.tikovsky@lindeimpianti.it jaime.basurto@linde.com sales@linde-le.com Fax +86.10.6437-6718
plantcomponents@linde-le.com linde@public.bta.net.cn
Linde Kryotechnik AG Linde Process Plants (Pty.) Ltd. Linde Engineerig Far East, Ltd.
Linde-KCA-Dresden GmbH Pfungen, Switzerland Johannesburg, South Africa Seoul, South Korea Linde AG Taiwan Branch
Dresden, Germany Phone +41.52.3040-555 Phone +27.11.490-0513 Phone +82.2789-6697 Engineering Division
Phone +49.351.250-30 Fax +41.52.3040-550 Fax +27.11.490-0412 Fax +82.2789-6698 Taipei, Taiwan
Fax +49.351.250-4800 info@linde-kryotechnik.ch lindepp@global.co.za hanyong.lee@linde.com Phone +886.2.2786-3131
lkca.dresden@linde-kca.com Fax +886.2.2652-5871
Cryo AB Linde-KCA Russia Branch Linde Engineering Division bernhard.puerzer@linde-le.com
Selas-Linde GmbH Gteborg, Sweden Moscow, Russia Bangkok, Thailand
Pullach, Germany Phone +46.3164-6800 Phone +7.495.646-5242 Phone +66.2636-1998 Linde Australia Pty. Ltd.
Phone +49.89.7447-470 Fax +46.3164-2220 Fax +7.795.646-5243 Fax +66.2636-1999 Chatswood N.S.W., Australia
Fax +49.89.7447-4717 gunnar.lenneras@cryo.aga.com dirk.westphal@linde-kca.com anuwat.krongkrachang@linde.com Phone +61.29411-4111
selas-linde@linde-le.com Fax +61.29411-1470
Linde Process Plants, Inc. Linde Arabian Contracting Co. Ltd. Linde Engineering Co. Ltd. willy.dietrich@linde.com.au
Cryostar SAS Tulsa, OK, U.S.A. Riyadh, Kingdom of Saudi Arabia Dalian, P.R. of China
Hsingue, France Phone +1.918.4771-200 Phone +966.1.419-1193 Phone +86.411.39538-800
Phone +33.389.70-2727 Fax +1.918.4771-100 Fax +966.1.419-1384 Fax +86.411.39538-855
Fax +33.389.70-2777 sales@lppusa.com linde-ksa@linde-le.com jochen.nippel@lindeleh.com
info@cryostar.com
Selas Fluid Processing Corp. Linde Engineering Middle East LLC Linde Engineering Co. Ltd.
Linde CryoPlants Ltd. Blue Bell, PA, U.S.A. Abu Dhabi, United Arab Emirates Hangzhou, P.R. of China
Aldershot, Great Britain Phone +1.610.834-0300 Phone +971.2.4477-631 Phone +86.571.87858-222
Phone +44.1.252.3313-51 Fax +1.610.834-0473 Fax +971.2.4475-953 Fax +86.571.87858-200
Fax +44.1.252.3430-62 john.mcdermott@selasfluid.com linde@emirates.net.ae hangzhou.leh@lindeleh.com
info@linde-lcl.com
Linde AG
Engineering Division, Dr.-Carl-von-Linde-Str. 6-14, 82049 Pullach, Germany
Phone +49.89.7445-0, Fax +49.89.7445-4908, E-Mail: info@linde-le.com, www.linde.com