Safety Plan
V12017
prepared for
Site-Specific Safety Plan
All the documents you need can be accessed through the menu below. Click on the icon to go to the section that applies to you. Once in the section you can easily click the back to top
to get back to the main menu again. These documents can be printed out and filled in, or they can be filled in and signed digitally. You will need to save a copy to your computer by
clicking File, Save As in the top left hand corner of the page. If you want to email it, open your usual email account and attach it as a file.
Plain Safe: A straight Site-Specific Health and Site/Job Hazard and Task Analysis/Safe Hazardous Products and
talking guide to... Safety Agreement Risk Register Work Method Statement Substances Register
Everything you need to know on Agreement between businesses Live document for PCBU 2 to record Job-planning tool for notifiable Records products, substances and
how to complete a Site-Specific working on a specific site on how significant hazards that cannot be works or other higher-risk activities. materials with hazardous ingredients.
Safety Plan. health and safety will be managed. eliminated. Keep updated. Use pre-work and update. Use pre-work then update.
Read pre-start Complete pre-start Complete pre-start Complete pre-start Complete pre-start
Emergency Response Onsite Training and Site Briefing/Toolbox Site Incident and Site Inspection
Plan Competency Register Meeting Minutes Injury Register Checklist - Generic
Work needing Task Analysis/Safe Records training, qualifications Records who was responsible for Records incidents that caused, or Tailored to meet specific
Work Method Statement or Permit and competencies of workers what and by when; proves that a could have caused, harm to people requirements of a job. Use pre-work
to Work. Use pre-work and update. on-site. Use pre-work and update. practice or hazard was discussed. on-site. For on-site reporting. and on-site as agreed by all parties.
Complete pre-start Complete pre-start After start After start After start
Type of business
Main contractor Client Principal Contractor Subcontractor Other
Type of business
Main contractor Client Principal Contractor Subcontractor Other
If yes, have you provided a copy of the notification (or receipt from WorkSafe)
with this agreement? Yes N/A
If yes, we agree to have the relevant safety data sheets available onsite. Yes N/A
Communication
How will you be
communicating health Type of communications Frequency
and safety information
and activities to your Toolbox talks Yes N/A
employees, subcontractors
and other PCBUs?
Project pre-start briefings Yes N/A
Other
Damage to plant/equipment/
Immediately Within 24hrs
machinery (serious)
We will report these
Our own system or paperwork PCBU 1s system and paperwork
incidents using
Other inspection
Training/experience/competency
We agree that every worker under our control on site will hold a current site
safety card. Yes N/A
We agree that every worker under our control on site will be given a job-specific
safety induction. Yes N/A
We agree that every worker under our control on site will be appropriately
qualified, competent, or fully supervised. Yes N/A
For the agreed activities set out on page two of this agreement, we will provide
Party 1 with evidence of competency (on-site training and competency register)
Yes N/A
for any workers participating in those activity types of activities (list below).
Environmental
Is there an environmental plan required for this site? Yes N/A
Is a resource consent required for any of the activities you will undertake
Yes N/A
on this site?
Will your activity potentially cause dirty water or wash-down runoff, silt or other Yes N/A
contaminants to be released?
If yes
2. Explain how potential for fire and explosion during refuelling will be controlled?
Subcontractors to Party 2
Subcontractors working on this site and not covered by this SSSP Agreement
Yes N/A
must supply their own agreement.
Emergencies
We agree that we will respond to any emergencies as outlined in Party 1s
Yes N/A
induction and emergency response plan.
If N/A, we agree to provide our own emergency response plan for this site. Yes N/A
PCBU 2 (Subcontractor)
We agree to act according to the content of the Site-Specific Safety Plan as outlined above.
Signed Date
Identified hazard or harm What is the initial risk Controls Level of control What is the residual risk For discussion at
e.g. Trip hazard on top step assessment? e.g. Build a ramp Use hierarchy of assessment? a toolbox talk/
Use risk assessment matrix controls table Use risk assessment matrix safety meeting?
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Catastrophic
(e.g fatal)
Moderate Moderate High Critical Critical
Moderate
(e.g Hospitalisation/Short or Long Low Moderate Moderate Moderate High
Term Disability)
Minor
(e.g First Aid)
Very Low Low Moderate Moderate Moderate
Superficial
(e.g No Treatment Required)
Very Low Very Low Low Low Moderate
This Task Analysis (TA) has an Emergency Response Plan Yes N/A Site name
Subcontractor
company name Site address
Step No.
Step No.
Step No.
Step No.
Step No.
Step No.
Step No.
Step No.
Date Identified Product or Substance Are safety data What is the related harm? What is the initial risk Is personal protective What other measures are required? What is the residual risk
DD/MM/YY e.g. petrol sheets held? e.g. risk of explosion assessment? equipment required? e.g. store in a locked space away from any assessment?
Use risk assessment matrix ignition source Use risk assessment matrix
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Yes No Yes No
Catastrophic
(e.g fatal)
Moderate Moderate High Critical Critical
Moderate
(e.g Hospitalisation/Short or Long Low Moderate Moderate Moderate High
Term Disability)
Minor
(e.g First Aid)
Very Low Low Moderate Moderate Moderate
Superficial
(e.g No Treatment Required)
Very Low Very Low Low Low Moderate
Name and ID No. Site card Key role or tasks Site induction Training/qualifications Experience Competence
First and last name type date (Any Site Safe training, trade and skills training, formal qualifications - certificates, No. of years Level of competence
DD/MM/YY licences, unit standards, etc) relevant to the key role or task experience relating to related to task
the key role or task
Types of qualifications, certificates, licences, unit standards, other: Competence designation LULU:
EWP (elevated work platform), PAT (powder actuated tool), FL (fork lift), FA (fall arrest), SCA (scaffold), DOG LULU - under supervision, is partially competent (line of sight); Indirect or occasional supervision, is
(dogman), LBP (Licensed Building Practitioner card type and number), CRA (crane specify type), MP partially competent (supervision nearby); Fully competent to work unsupervised; Competent to train.
(mobile plant specify type), RELECT (registered electrical worker), ELTAG (electrical testing and tagging),
STMS (site traffic management supervisor), TC (traffic controller), EXP (explosives), NZQA (trade or safety units)
Type of emergency
e.g. Fall from height while
Location
wearing a harness
PCBU1 PCBU2
Describe work activity
e.g. Working from MEWP Supervisor
and fall off
Name each person involved in the rescue Their role or responsibility in the rescue is to: List the training required Provide contact details
First name and last name e.g. release the bleed valve e.g. competence using MEWP Phone number
Site-Specific Briefing
Health and safety Issues raised from site safety inspection Actions By who and when
issues
Site activities/
safe work practices/
incident reports and
investigations discussed
Issues outstanding from previous briefings Actions By who and when
Day-to-day site
management issues/items
for discussion
a. Hazard board and signage up-to-date a. Proper lift assessment plan done a. Correctly stored
b. Environmental plans/measures b. Crane certification current b. Safety Data Sheet (SDS) available
c. Toolbox talk last date / / c. Slings/chains certified c. Operators using PPE
d. Safety inductions for all on site d. Operator procedures in place
12. PATs and Nailers
e. Safety notice board current e. Inspections being done
d. PAT tool WoF current and secure
f. Man cage available
2. Site facilities e. Staff trained in tool use (SWPS)
g. Emergency plan in place
a. Offices clean, adequate & good f. PAT signage on site
lighting 7. Compressed air equipment
b. Smoko sheds clean, potable water 13. Scaffolding
a. In good condition
c. Toilets clean, washing water g. Notifiable weekly Scaftag/current
b. Appropriate guards fitted
d. Tool/equipment sheds adequate h. Handrails/mid-rails
c. Trained user
i. Toe boards
3. General site tidiness and accessways 8. Excavations j. Platforms
a. Clear, safe access to work areas a. Correctly shored k. Ladders/stairs
b. Stairways and accessways clear b. Access controlled l. Base sound
c. Hoardings/fence and gates secure m. Work platforms clear
9. Hot Works
d. Loose materials secure from wind n. Platforms trip free
a. Hot work permits being issued
o. Planks tied down
4. Personal safety equipment
b. Fire extinguishers on hand
p. Headroom clear
a. Signage displayed and legible c. Operators using PPE
q. Ties/bracing adequate
b. Hardhats being worn
10. Electrical equipment/plant
c. Correct footwear being worn 14. Ladders
d. Glasses/ear muffs/vests/masks used a. Main board lockable/weatherproof
r. Good condition
b. Current tagged and damage-free
s. Secured top and bottom
5. First aid/fire prevention leads
c. Current tagged plant t. Stays to step ladders
a. First aid box Available
d. Current tagged lifeguards u. Working 2 steps down
b. Accident register
e. Leads safely placed 15. Fall hazards
c. Fire extinguishers Available
f. Electrical equipment/plant good
Current (12 mth) a. Floor edges Floor openings
condition
Sufficient number g. Electrical equipment/plant b. Lift shafts Stairs
d. Evacuation Procedure current appropriate guards on plant
All emergencies incl h. Adequate temporary lighting
Date and time Details Immediate action taken? Does this incident Should this incident be Is this incident the Signature and date
DD/MM/YY Name of person (injured and observer), description require a WorkSafe investigated by your subject of a toolbox DD/MM/YY
of incident, type of injury/disease (if any). How did it notification? company (PCBU 2)? talk?