Professional Documents
Culture Documents
Power
Internal wiring Unshielded KS3 0.2
Coordinated SPDs None PSPD 1
Telecom
Internal wiring Unshielded KS3 1
Coordinated SPDs None PSPD 1
Special hazard: average hZ 1
PROBABILITIES - Z2
Table A.1
Table B.2
Table B.7
EQ B.5
REFERENCE
Table A.2
Table A.3
Table A.4
Table B.8
Table B.4
Table A.1
EQ B.7
Table B.8
Table B.9
REFERENCE
Table A.2
Table A.3
Table A.4
Table B.8
Table B.4
Table A.1
EQ B.7
Table B.8
Table B.9
REFERENCE
Table C.3
Table B.1
Table B.6
Table C.5
Table C.4
EQ B.6
Table B.5
Table B.3
Table B.5
Table B.3
Table C.6
Table C.2
Table C.1
Reference
EQ A.2
EQ A.7
EQ A.9
EQ A.11
EQ A2
EQ A.9
EQ A.11
EQ A2
Reference
EQ A.4
EQ A.6
EQ A.8
EQ A.10
EQ A5
EQ A.8
EQ A.10
EQ A5
Evaluation of Risk R2
TYPE OF DAMAGE SYMBOL EQUIATION Z1 Z2 TOTAL
D1
1. R2 is greter that Rt hence the protection for loss of service to Public is required.
2. the risk for structure is mainly due to faliures due to internal systems due to LEMP.
Solution:
1. Providing Class 11 coodinated SPD system and reduce RC and RM.
D1
Note: 1. If selected few people in the Zone the value get reduced. This is the case for
lifts and overhead storage tanks.