You are on page 1of 30

PRECIOS

TOO ABARCA ahuatepec ABRIL MAT CRUZ

CLAVE MATERIAL U COSTO MARCA COSTO2 MARCA COSTO 3 MARCA COSTO MARCA COSTO MARCA ELECCION

MAT001 CEMENTO TON $2,100.00CONSTRURAMA $2,060.00 $2,000.00 CRUZ A $2,040.00 $1,800.00

MAT002 MORTERO $1,480.00

MAT003 CAL TON $1,364.00 $940.00 $1,250.00 $1,363.64 $40.00 $1,364.00

MAT004 ARENA M3 $166.67 $620.00 $166.67 $150.00 $166.67

MAT005 GRAVA M3 $216.67 $261.67 $216.67 $200.00 $216.67

MAT006 PIEDRA M3 $166.67 $1,300.00 $166.67

MAT007 BLOCK PZA $5.50 $5.40 $5.40 $5.60 $5.00

MAT008 TABIQUE PZA $1.80 $2.20 $1.60 $1.70 $1.80

MAT009 VARILLA #2 PZA $92.60 $150.00 $155.00

MAT010 VARILLA #3 PZA $85.00 $168.00 $85.00 $84.00 $7.10

MAT011 ARMEX 10X10 M $105.00 $17.50

MAT012 ARMEX 10X15 M $17.50 $20.00 $16.67 $16.33 $17.50

MAT013 PANEL #2 $340.00

MAT014 PANEL #3 PZA $350.00 $360.00

MAT015 MALLA PISO MT $45.00 $40.00 $45.00

MAT016 MALLA LOSA MT $80.00 $77.50 $80.00

MAT017 ESTRIBOS KG $20.00 $19.00 $17.00 $17.00 $20.00

MAT018 ALAMBRE QUEMADO KG $19.00 $17.00 $16.00 $22.00

MAT019 CLAVO KG $20.00 $20.00 $20.00

MAT020 AGUA M3 $0.30

DUELA DE 10"X 2.5MTS PZA $85.00

POLIN 10X10 PZA $100.00

ACEITE QUEMADO $5.00

MICROLASTI $75.00

FESTERFELT $160.00
MANO DE OBRA
CLAVE
CUA00 PEON $180.00
CUA11 ALBAIL $220.00
CUA001 2 PEONES $360.00
CUA002 PEON , ALBAIL $580.00
PRECIOS
CUA003 CABO DE OFICIOS $500.00
PRECIOS

OBSERVACIONES

3 mtrs3

85 12MTS

MULTIPLICAR X 6 PRECIO PZA


PRESUPUESTO

Partida No Concepto U C PU importe


1 Limpieza M2 110.00 $5.44 $598.16
preliminares 2 Trazo M2 110.00 $2.55 $280.11
3 Excavacion en terreno tipo B a mano de 0 a 2 mts de profundidad. M3 88.00 $188.31 $16571.36
SUBTOTAL $17449.64
4 Plantilla de cimentacin con concreto de 100kg/cm2 y 2cm de espesor. M2 77.00 $76.40 $5882.87
5 Cimentacin de mampostera. M3 55.00 $923.41 $50787.68
6 Relleno de cepas con material producto de excavacin. M3 30.80 $108.32 $3336.26
7 Cadena de desplante de 15X20cm con concreto de 150kg/cm2. M2 110.00 $219.75 $24172.92
Albailera
8 Impermeavilizacin de cadena de desplante de 15X20cm. M 60.50 $133.21 $8058.98
9 Muro de tabique. M2 275.00 $124.23 $34163.13
10 Cadena de 15X20cm con concreto de 150kg/cm2. M 110.00 $105.44 $11597.90
11 Castillo de 10X10 con concreto de 150kg/cm2. M 96.00 84.64596 $8126.01
subtotal $126401.84

total $143851.47
MORTEROS
LOGOTIPO UNIDAD M3
CONCEPTO Elaboracin de mortero cemento arena prop. 1:5
FECHA
CLAVE MORT001 REALIZO:
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD P.U. IMPORTE
Cemento Gris TON 0.260 $2,000.00 $520.00
Arena M3 1.200 $150.00 $180.00
MATERIALES
Agua M3 0.285 $0.30 $0.09

SUBTOTAL $700.09
$0.00
MANO DE
OBRA

SUBTOTAL $0.00
Medios manuales y/o herramientas % 3.00 $0.000 $0.00
HERRAMIENTA

SUBTOTAL $0.00
C.I.
TOTAL $700.09

MORTEROS
LOGOTIPO UNIDAD M3
CONCEPTO: Elaboracin de mortero cemento cal-arena- prop. 1:1:8
FECHA
CLAVE MORT001 REALIZO:
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD P.U. IMPORTE
Cemento Gris TON 0.193 $2,000.00 $385.20
Cal TON 0.114 $1,250.00 $142.88
MATERIALES Arena M3 1.192 $150.00 $178.79
Agua M3 0.331 $0.30 $0.10

SUBTOTAL $706.96
$0.00
MANO DE OBRA

SUBTOTAL $0.00
Medios manuales y/o herramientas % 3.00 $0.000 $0.00
HERRAMIENTA

SUBTOTAL $0.00
C.I.
TOTAL $706.96
CONCRETOS
LOGOTIPO UNIDAD M3
CONCEPTO: Elavoracin de concreto con resistencia de 150kg/cm2.
FECHA
CLAVE MORT001 REALIZO
TIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE
MAT001 Cemento Gris TON 0.323 $2,000.00 $646.00
MAT003 Grava M3 0.480 $216.67 $104.00
MATERIALES Arena M3 0.670 $150.00 $100.50
Agua M3 0.210 $0.30 $0.06

SUBTOTAL $850.56
$0.00
MANO DE OBRA

SUBTOTAL $0.00
Medios manuales y/o herramientas % 3.00 $0.000 $0.00
HERRAMIENTA

SUBTOTAL $0.00
C.I.
TOTAL $850.56

CONCRETOS
LOGOTIPO UNIDAD M3
CONCEPTO: ELABORACION CONCRETO DE RESISTENCIA DE 100 KG/CM2
FECHA
CLAVE CONC001 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANIDAD P.U. IMPORTE
MAT001 Cemento Gris TON 0.260 $2,000.00 $520.00
MAT003 Grava TON 0.680 $216.67 $147.33
MATERIALES Arena M3 0.500 $150.00 $75.00
Agua M3 0.195 $0.30 $0.06

SUBTOTAL $742.39
$0.00
MANO DE OBRA

SUBTOTAL $0.00
Medios manuales y/o herramientas % 3.00 $0.000 $0.00
HERRAMIENTA

SUBTOTAL $0.00
C.I.
TOTAL $742.39

CIMBRAS
LOGOTIPO UNIDAD M
CONCEPTO: Cimbra para dadenas y castillos con acabado comn.
FECHA
CLAVE CIMB001 REALIZO:
TIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE
Duela de 10" X2.5m. PZA 0.140 $85.00 $11.90
Poln PZA 0.010 $100.00 $1.00
MATERIALES Alambre quemado KG 0.129 $22.00 $2.84
Clavos de 2 1/2" KG 0.050 $20.00 $1.00
Aceite quemado LTS 0.020 $5.00 $0.10
SUBTOTAL $16.84
MANO DE OBRA $0.00
SUBTOTAL $0.00
Medios manuales y/o herramientas % 3.00 $0.000 $0.00
HERRAMIENTA

SUBTOTAL $0.00
C.I.
TOTAL $16.84

CUADRILLAS
LOGOTIPO UNIDAD J
CONCEPTO: Cuadrilla de Peones
FECHA
CLAVE CUA 001 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
MANO DE JOGPO000 Cuadrilla de Peones J 1.000 $306.000 $306.000
OBRA JOGPO000 Cabo de Oficio J 0.100 $680.000 $68.000
TOTAL $374.00

CUADRILLAS
LOGOTIPO UNIDAD J
CONCEPTO: Cuadrilla de Albailes
FECHA
CLAVE CUA 002 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
JOGPO000 Cuadrilla de Peones J 1.000 $306.000 $306.000
MANO DE $374.000
JOGPO000 Albail J 1.000 $374.000
OBRA
JOGPO000 Cabo de Oficio J 0.100 $680.000 $68.000
TOTAL $748.00
MANO DE OBRA
CLAVE OCUPACION COSTO SDB
PEO1 Peon $180.00 $306.00
ALB1 Albail $220.00 $374.00
CABO1 cabo de Oficio $400.00 $680.00

LOGOTIPO UNIDAD
CONCEPTO:
FECHA
CLAVE CIMB001 REALIZO:
TIPO CLAVE DESCRIPCION Unidad Cantidad P.U. IMPORTE

MATERIALES

MANO DE OBRA

SUBTOTAL

HERRAMIENTA

SUBTOTAL
C.I.
TOTAL
LIMPIEZA
UNIDAD M2
CONCEPTO: Limpieza y deshierbe en terreno con maleza de hasta 1
metro de altura incluye apile de hierba y material en lugar.
LOGOTIPO FECHA
CLAVE PRE001 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD precio IMPORTE
MATERIALES $0.00
SUBTOTAL $0.00
MANO DE CUA001 Cuadrilla de Peones J 0.012 $360.00 $4.32
OBRA
SUBTOTAL $4.32
Medios manuales y/o herramientas % 3.00 $4.32 $0.13
HERRAMIENTA

CD $4.45
C.I. (10%) 0.445
SUBTOTAL $4.89
FINANCIADA (1%) $0.05
SUBTOTAL $4.94
UTLDD. (10%) $0.49
TOTAL $5.44

TRAZO Y NIVELACION
LOGOTIPO CONCEPTO: UNIDAD M2
Trazo y nivelacin en terreno plano por medios maniales, para
desplante de estructura, estableciendo ejes auxiliares pasos y
referencias. incluye material y mano de obra.

CLAVE PRE002 REALIZO FECHA


TIPO CLAVE DESCRIPCION UNIDAD Cantidad precio IMPORTE
MAT003 Calhidra TON 0.0002 $940.00 $0.19
Barrote de 1 1/2" X 4 " X 8' PT 0.0027 $6.10 $0.02
MATERIALES Duela de 3/4 " x 4 " x 8 PT 0.018 $7.10 $0.13
Hilo plastico M 0.350 $0.10 $0.04
Varilla 1/2" TON 0.0002 $3690.00 $0.74
SUBTOTAL $1.11
MANO DE CUA002 Cuadrilla de Albail J 0.001 $748.00 $0.898
OBRA
SUBTOTAL $0.90
Medios manuales y/o herramientas % 3.00 $0.027 $0.08
HERRAMIENTA

CD $2.08
C.I. (10%) $0.21
SUBTOTAL $2.29
FINANCIADA (1%) $0.02
SUBTOTAL $2.31
UTLDD. (10%) $0.23
TOTAL $2.55
EXCABACIN
LOGOTIPO UNIDAD M3
Excavacin a mano n terreno tipo "B" seco en cepas de
CONCEPTO: hasta 2m. D e altura; incluye afloje, extraccin, amacice,
limpieza de plantilla y taludes, medida en banco.
FECHA
CLAVE CIM001 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
MATERIALES $0.00
SUBTOTAL $0.00
MANO DE CUA000 Cuadrilla de peones J 0.400 $374.00 $149.60
OBRA
SUBTOTAL $149.60
Medios manuales y/o herramien % 3.00 $149.600 $4.49
HERRAMIENTA

CD $154.09
C.I. (10%) $15.41
SUBTOTAL $169.50
FINANCIADA (1%) $1.69
SUBTOTAL $171.19
UTLDD. (10%) $17.12
TOTAL $188.31
PLANTILLA DE CIMENTACION
LOGOTIPO UNIDAD M2
CONCEPTO: Plantilla de cimentacin de 100kg/cm2 con agregado de 3/4 y
un espesor de 2cm, incluye material y mano de obra.
FECHA
CLAVE ALB001 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALES CONC001 Concreto 100 kg /cm2 M3 0.051 $742.39 $37.86
SUBTOTAL $37.86
MANO DE CUA002 Albailes J 0.032 $748.00 $23.936
OBRA
SUBTOTAL $23.94
Medios manuales y/o herramientas % 3.00 $23.936 $0.72
HERRAMIENTA

CD $62.52
C.I. (10%) $6.25
SUBTOTAL $68.77
FINANCIDA (1%) $0.69
SUBTOTAL $69.46
UTLDD. (10%) $6.95
TOTAL $76.40

CIMIENTO DE MAMPOSTERIA
LOGOTIPO UNIDAD M3
Cimentacin de piedra brasa asentada con mortero cemento
CONCEPTO: cal.arena prop. 1:1:6, incluye acarreo a 1ra estacin.
FECHA
CLAVE ALB002 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALES MORT001 Mortero 1:1:6 M3 0.315 700.09 220.53
MAT006 Piedra brasa de 3ra M3 1.500 166.67 250.01
SUBTOTAL $470.53
MANO DE CUA002 Albailes J 0.370 $748.000 $276.760
OBRA
SUBTOTAL $276.76
Medios manuales y/o herramientas % 3.00 $276.760 $8.30
HERRAMIENTA

CD $755.59
C.I. (10%) $75.56
SUBTOTAL $831.15
FINANCIDA (1%) $8.31
SUBTOTAL $839.47
UTLDD. (10%) $83.95
TOTAL $923.41
RELLENO DE CEPAS
LOGOTIPO Relleno de cepas con material producto de excavacin UNIDAD M3
CONCEPTO: compactado con pizn a mano en capas de 10cm. I ncluye
volteo con pala. FECHA
CLAVE ALB003 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MATERIALES Agua M3 0.113 $0.30 $0.03
SUBTOTAL $0.03
MANO DE CUA 001 Peones J 0.230 $374.00 $86.020
OBRA
SUBTOTAL $86.02
HERRAMIENTA Medios manuales y/o herramientas % 3.00 $86.020 $2.58

CD $88.63
C.I. (10%) $8.86
SUBTOTAL $97.50
FINANCIDA (1%) $0.97
SUBTOTAL $98.47
UTLDD. (10%) $9.85
TOTAL $108.32

CADENA DE DESPLANTE
LOGOTIPO
Cadena de desplante de 15x 20 con concreto de 150 kg/ cm2 UNIDAD M
CONCEPTO: con agregado de 3/4 y refuerzo con 4 varillas del #3 y estribos
del no.2 a cada 20cm.
FECHA
CLAVE ALB004 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
CONC001 Concreto 150kg/cm2 M3 0.03 $850.56 $25.52
MAT002 Agua M 0.05 $0.30 $0.02
MATERIALES
MAT012 Armex para cadena M 1.100 $17.50 $19.25
Cimbra de madera M 1.000 $16.84 $16.84
SUBTOTAL $44.78
MANO DE CUA 002 Albailes J 0.085 $748.00 $63.58
OBRA
SUBTOTAL $63.58
Medios manuales y/o herramientas % 3.00 $63.580 $3.03
HERRAMIENTA

CD $111.39
C.I. (10%) $111.49
SUBTOTAL $222.88
FINANCIDA (1%) $2.23
SUBTOTAL $225.11
UTLDD. (10%) $22.51
TOTAL $219.75
IMPERMEABILIZACION DE CADENA DE DESPLANTE
LOGOTIPO
Impermeavilizacin de cadena de desplante de 15X20 a base UNIDAD M2
CONCEPTO: de 2 capas de emulsin asfaltica y 1 capa de fieltro asfltico
con riego de arena, incluye limpieza y acarreos a 1ra estcin.
FECHA
CLAVE ALB005 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
Microlastic LTS 0.35 $75.00 $26.25
MATERIALES Festerfelt PZA 0.48 $160.00 $76.80
$0.00
SUBTOTAL $103.05
MANO DE CUA 002 Albailes J 0.008 $748.00 $5.775
OBRA
SUBTOTAL $5.77
Medios manuales y/o herramientas % 3.00 $5.775 $0.17
HERRAMIENTA

CD $109.00
C.I. (10%) $10.90
SUBTOTAL $119.90
FINANCIDA (1%) $1.20
SUBTOTAL $121.10
UTLDD. (10%) $12.11
TOTAL $133.21

MURO DE TABIQUE
LOGOTIPO
Muro de tabique rojo recocido 5X11.5X23cm. De 11.5cm de UNIDAD M2
CONCEPTO: espesor acabado comun hasta 3.5 m. de altura, junta de 2cm
aprox. de espesor, inc. material y acarreo hasta 1er estacin.
FECHA
CLAVE ALB005 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD CANTIDAD PRECIO IMPORTE
MAT008 Tabique rojo de 5X11.5X23 M2 12 $1.70 $20.40
MORT002 Mortero prop. 1:1:8 M3 0.0358 $706.96 $25.31
MATERIALES
MAT002 Agua M3 0.048 $0.30 $0.01
Andamios USO 0.036 $8.28 $0.30
SUBTOTAL $45.72
MANO DE CUA 002 Albail y pen J 0.085 $580.00 $49.30
OBRA CUA003 Cabo de Oficio J 0.010 $500.00 $5.00
SUBTOTAL $54.30
HERRAMIENTA Medios manuales y/o herramientas % 3.00 $54.30 $1.63

CD $101.65
C.I. (10%) $10.17
SUBTOTAL $111.82
FINANCIDA (1%) $1.12
SUBTOTAL $112.94
UTLDD. (10%) $11.29
TOTAL $124.23

CADENA
LOGOTIPO UNIDAD M
Cadena de cerramiento de 15x20cm con concreto de 150
CONCEPTO: kg/cm2 con agregado de 3/4 y refuerzo de armex de
10X15cm.
FECHA
CLAVE ALB004 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
CONC001 Concreto 150 kg/cm2 M3 0.03 $850.56 $25.52
MAT002 Agua M3 0.05 $0.30 $0.02
MATERIALES
MAT012 Armex para cadena M 1.100 $17.50 $19.25
CIMB001 Cimbra acabado comn M 1.000 $16.84 $16.84
SUBTOTAL $61.62
MANO DE CUA 002 Albailes J 0.032 $748.00 $23.94
OBRA
SUBTOTAL $23.94
Medios manuales y/o herramientas % 3.00 $23.94 $0.72
HERRAMIENTA

CD $86.27
C.I. (10%) $8.63
SUBTOTAL $94.90
FINANCIADA (1%) $0.95
SUBTOTAL $95.85
UTLDD. (10%) $9.59
TOTAL $105.44

CASTILLO
LOGOTIPO UNIDAD M
Castillo 10X10 con concreto de 100kg/cm2 y refuerzo de
CONCEPTO: acero de armex colocado a cada 3m. Aprox.
FECHA
CLAVE ALB004 REALIZO
TIPO CLAVE DESCRIPCION UNIDAD Cantidad IMPORTE
CONC001 Concreto de 100kg/cm2 M3 0.01 $850.56 $8.51

MATERIALES MAT002 Agua M3 0.05 $0.30 $0.02


MAT012 Armex para castillo M 1.100 $17.50 $19.25
CIMB001 Cimbra acabado comn M 1.000 $16.84 $16.84
SUBTOTAL $44.61
MANO DE CUA 002 Albailes J 0.032 $748.00 $23.94
OBRA
SUBTOTAL $23.94
Medios manuales y/o herramientas % 3.00 $23.936 $0.72
HERRAMIENTA

CD $69.26
C.I. (10%) $6.93
SUBTOTAL $76.19
FINANCIDA (1%) $0.76
SUBTOTAL $76.95
UTLDD. (10%) $7.70
TOTAL $84.65
EXPLOSIN DE INSUMOS

CONCEPTO CODIGO CANTIDAD RENDIMIENTO PRECIO


PRELIMINARES CUA001 330 0.012 $374.00 $1,481.04
CUA002 330 0 $500.00 $0.00
% 330 $0.13 $42.77
$1,523.81
TRAZO MAT003 110.00 0.0002 $940.00 $20.68
CUA002 110.00 0.0012 $748.00 $98.74
CUA003 110.00 0 $500.00 $0.00
110.00 $0.08 $8.89
$128.30
EXCAVACION CUA001 88.00 0.4 $360.00 $12,672.00
CUA003 88.00 0 $500.00 $0.00
% 88.00 $4.49 $394.94
$13,066.94

PLANTILLA CONCRETO MAT001 2.20 0.323 $1,800.00 $1,279.08


MAT005 2.20 0.48 $216.67 $228.80
MAT004 2.20 0.67 $166.67 $245.67
MAT020 2.20 0.21 $0.30 $0.14
MO CUA002 77.00 0.032 $580.00 $1,429.12
CUA003 77.00 0 $500.00 $0.00
% 77.00 $0.72 $55.29
$3,238.10

CIMIENTO MAMPOSTEPIEDRA MAT006 55.00 1.5 $166.67 $13,750.28


MORTERO MAT001 14.52 0.26 $1,800.00 $6,795.36
MAT003 14.52 Err:509 $1,364.00 Err:509
MAT004 14.52 1.2 $166.67 $2,904.01
MO CUA002 55.00 0.37 $580.00 $11,803.00
CUA003 55.00 0 $500.00 $0.00
% 55.00 $8.30 $456.65
Err:509
EXPLOSIN DE INSUMOS

CONCEPTO CODIGO CANTIDAD RENDIMIENTO PRECIO


RELLENO DE CEPAS MAT020 30.80 0.113 $0.30 $1.04
CUA001 30.80 0.23 $360.00 $2,550.24
CUA003 30.80 0 $500.00 $0.00
% 30.80 $2.58 $79.48
$2,630.77

CADENAS DESPLANTECONCRETO MATOO1 3.30 0.323 $1,800.00 $1,918.62


MAT005 3.30 0.48 $216.67 $343.20
MAT004 3.30 0.67 $166.67 $368.50
MAT020 3.30 0.21 0.3 $0.21
CUA002 110.00 0.085 $580.00 $5,423.00
CUA003 110.00 0 $500.00 $0.00
%

ALBAILERIA CODIGO CANTIDA RENDIMIENTO PRECIO TOTAL

CEMENTO
CAL
GRAVA
ARENA
AGUA
PIEDRA
TABIQUE
ARMEX CADENA
ARMEX CASTILLO
ALAMBRE QUEMADO
PEON
ALBAIL
2 PEONES
PEON, ALBAIL
EXPLOSIN DE INSUMOS

CABO DE OFICIOS
HERRAMIENTAS
EXPLOSIN DE INSUMOS

Partida No Concepto U C PU importe


preliminares 1 limpieza M2 330 10.1588 3352.404
2 trazo M2 110 11.39184 1253.1024

3 Excavacion en terreno tipo M3 88 83.93 7385.84


EXPLOSIN DE INSUMOS

SUBTOTAL 11991.3464
ALBAILERIA 4 PLANTILLA DE CIMENTACIOM2 110 33.19251 3651.17623
5 CIMIENTO DE MAMPOSTERM3 48.4 845.3306 40913.9997
6 RELLENO CON MATERIAL P M3 30.8 95.7359 2948.66572
7 CADENA DE DESPLANTE DEM2 110 121.7945 13397.3946
8 IMPERMEABILIZACION DE CM 60.5 140.6306 8508.15033
9 MURO DE TABIQUE M2 275 192.5777 52958.8718
10 CADENA DE 15X 20 CONCREM 110 105.1259 11563.8486
11 CASTILLO DE 10X10 CONCRM 96 76.2309 7318.16629
subtotal 122378.258
EXPLOSIN DE INSUMOS

13
subtotal 27277.6111

total 161647.216
GENERADORES
PROY. LOCALIZACION
NO. CONCEPTO U EJE TRAMOLARGO ANCHO ALTO No PIEZASRESULTADO
Limpieza y deshierbe en terreno A 1-2 25 1 25
con maleza de hasta 1 metro de B 1-2 25 1 25
M2
altura incluye apile de hierba y 1 A-B 30 1 30
material en lugar. 2 A-B 30 1 30
TOTAL 110

Trazo y nivelacin en terreno plano A 1-2 25 1 25


por medios maniales, para
B 1-2 25 1 25
desplante de estructura,
M2
estableciendo ejes auxiliares pasos
1 A-B 30 1 30
y referencias. incluye material y
mano de obra. 2 A-B 30 1 30
TOTAL 110
Excavacin a mano n terreno tipo A 1-2 25 1 0.8 20
"B" seco en cepas de hasta 2m. D e B 1-2 25 1 0.8 20
altura; incluye afloje, extraccin, M3
amacice, limpieza de plantilla y 1 A-B 30 1 0.8 24
taludes, medida en banco. 2 A-B 30 1 0.8 24
TOTAL 88
Plantilla de cimentacin de A 1-2 25 0.7 0.05 17.5
100kg/cm2 con agregado de 3/4 y B 1-2 25 0.7 0.05 17.5
M2
un espesor de 2cm, incluye material 1 A-B 30 0.7 0.05 21
y mano de obra. 2 A-B 30 0.7 0.05 21
TOTAL 77
Cimentacin de piedra brasa A 1-2 25 0.5 12.5
asentada con mortero cemento B 1-2 25 0.5 12.5
M3
cal.arena prop. 1:1:6, incluye 1 A-B 30 0.5 15
acarreo a 1ra estacin. 2 A-B 30 0.5 15
TOTAL 55
Relleno de cepas con material A 1-2 25 0.28 7
producto de excavacin B 1-2 25 0.28 7
compactado con pizn a mano en M3
capas de 10cm. I ncluye volteo con 1 A-B 30 0.28 8.4
pala. 2 A-B 30 0.28 8.4
TOTAL 30.8

Cadena de desplante de 15x 20 con A 1-2 25 1 25


concreto de 150 kg/ cm2 con B 1-2 25 1 25
agregado de 3/4 y refuerzo con 4 M3
varillas del #3 y estribos del no.2 a 1 A-B 30 1 30
cada 20cm. 2 A-B 30 1 30
TOTAL 110
A 1-2 25 0.55 13.75
Impermeavilizacin de cadena de
B 1-2 25 0.55 13.75
desplante de 15X20 a base de 2
capas de emulsin asfaltica y 1 M2
capa de fieltro asfltico con riego de 1 A-B 30 0.55 16.5
arena, incluye limpieza y acarreos a
1ra estcin. 2 A-B 30 0.55 16.5
TOTAL 60.5
A 1-2 25 2.5 62.5
Muro de tabique rojo recocido
5X11.5X23cm. De 11.5cm de B 1-2 25 2.5 62.5
espesor acabado comun hasta 3.5 M2
m. de altura, junta de 2cm aprox. de 1 A-B 30 2.5 75
espesor, inc. material y acarreo
hasta 1er estacin. 2 A-B 30 2.5 75
TOTAL 275
Cadena de cerramiento de A 1-2 25 1 25
15x20cm con concreto de 150 B 1-2 25 1 25
M2
kg/cm2 con agregado de 3/4 y 1 A-B 30 1 30
refuerzo de armex de 10X15cm. 2 A-B 30 1 30
TOTAL 110
A 1-2 3 7 21
Castillo 10X10 con concreto de B 1-2 3 7 21
100kg/cm2 y refuerzo de acero de M
armex colocado a cada 3m. Aprox. 1 A-B 3 9 27
2 A-B 3 9 27
TOTAL 96
Programa de Obra
Cdigo Concepto
U. Cant. P.U. Imprte. Rndmto. Inicia

Limpieza y deshierbe en
PRE001 terreno con maleza de hasta 1
metro de altura incluye apile de m2 110 $5.44 $598.16 83.333 10/17/2011
hierba y material en lugar.

Trazo y nivelacin en terreno


plano por medios maniales,
PRE002 para desplante de estructura,
estableciendo ejes auxiliares m2 110 $2.55 $280.11 833.33 10/18/2011
pasos y referencias. incluye
material y mano de obra.

Excavacin a mano n terreno


tipo "B" seco en cepas de hasta
CIM001 2m. D e altura; incluye afloje,
extraccin, amacice, limpieza m3 88 $188.31 $16,571.36 7.5 10/19/2011
de plantilla y taludes, medida
en banco.

Plantilla de cimentacin de
100kg/cm2 con agregado de
ALB001 3/4 y un espesor de 2cm, m2 77 $76.40 $5,882.87 31.25 11/29/2011
incluye material y mano de
obra.

ALB002 Cimentacin de piedra brasa m3 55 $923.41 $50,787.68 5.405 11/2/2011


asentada con mortero cemento
cal.arena prop. 1:1:6, incluye
acarreo a 1ra estacin.

Relleno de cepas con material


producto de excavacin
ALB003 compactado con pizn a mano m3 30.8 $108.32 $3,336.26 4.348 11/24/2011
en capas de 10cm. I ncluye
volteo con pala.

Cadena de desplante de 15x 20


con concreto de 150 kg/ cm2
con agregado de 3/4 y refuerzo
ALB004 con 4 varillas del #3 y estribos m 110 $219.75 $24,172.92 11.765 11/14/2011
del no.2 a cada 20cm.

Impermeavilizacin de cadena
ALB005 de desplante de 15X20 a base m2 60.5 $133.21 $8,058.98 129.534 11/23/2011
de 2 capas de emulsin asfaltica
y 1 capa de fieltro asfltico con
riego de arena, incluye limpieza
y acarreos a 1ra estcin.
Muro de tabique rojo recocido
ALB006 5X11.5X23cm. De 11.5cm de m2 275 $124.23 $34,163.13 23.529 11/24/2011
espesor acabado comun hasta
3.5 m. de altura, junta de 2cm
aprox. de espesor, inc. material
y acarreo hasta 1er estacin.

Castillo 10X10 con concreto de


ALB008 100kg/cm2 y refuerzo de acero m 96 $84.65 $8,126.01 31.25 11/24/2011
de armex colocado a cada 3m.
Aprox.

ALB007 Cadena de cerramiento de m 110 $105.44 $11,597.90 31.25 12/6/2011


15x20cm con concreto de 150
kg/cm2 con agregado de 3/4 y
refuerzo de armex de 10X15cm.

$163,575.4
Programa de Obra
Perido 1 Perido 2 Perido 3 Perido 4 Perido 5 Perido 6 Perido 7
Fin Duracin Fza. Tbjo.
L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S L MM J V S

10/18/2011 1.3 1 CUA001

10/18/2011 0.13 1 CUA002

11/30/2011 12 3CUA001

11/4/2011 2 1CUA002

11/21/2011 10 2CUA002

12/1/2011 7 1CUA001

11/22/2011 9 1CUA002

11/23/2011 0.47 1CUA002


12/7/2011 12 2CUA001

11/27/2011 3.1 1 CUA002

12/9/2011 4 1CUA002

$5,021.11 $8,285.68 $30,340.78 $32,855.37 $22,922.01 $35,882.99 $28,264.69


$163,572.63
Estimacin 1 Perido del: 17/10/20011 al: 10/22/2011
Esta estimacin
Descripcin U Cntdd. P.U. Imprte. Cant. % Imprt.
Limpieza, deshierve y desenraice
del terreno con maleza de 1m de
altura, incluyematerial y apile de
hierba en el lugar m2 110 7.19 791 110 100.00 791.26

Trazo y nivelacin en terreno plano


por medios manuales, para
desplante de estructura, m2 110 68.96 7585.54 110 100.00 7585.54
estableciendo ejes auxiliares, pasos
y referencias, incluye material y
mano de obra.

Excabacin a mano en terreno tipo


B seco en cepas de hasta 2 m de
profundidad, incluye afloje, m3 88 258.43 22741.42 15 17.05 255.68
estraccin, amacice,limpieza de
plantilla y taludes, medida en
banco.
Estimacin 2 Perido del: 21/10/20011 al:

Excabacin a mano en terreno tipo


B seco en cepas de hasta 2 m de
profundidad, incluye afloje, m3 88 258.43 22741.42 45 51.136364 2301.14
estraccin, amacice,limpieza de
plantilla y taludes, medida en
2 banco.
10/22/2011
Acumulado Por Ejercer
Cant. % Imprt. Cant. % Imprt.

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 73.00 82.95 6055.6818

al: 11/3/2011