You are on page 1of 1

Flow chart for material and personnel movement during

production activities in SDU plant


Ground

RM issue Dispensed
Issue primary Packaging Post staging of
floor

from RM material Dispatch the


packaging material issue dispensed
warehouse to Dispensing transfer products to
material from from PM material in post
dispensing through lift with market
RM warehouse warehouse staging area
area polybag cover
2nd production floor

Transfer the
material
Compression/ Process/
through lift to Primary
encapsulation/ granulation in
primary packaging
coating process area
packaging
room

Transfer the
Secondary finished
packaging products to FG
warehouse