You are on page 1of 3

DATE :

MATERIAL STOCK ANALYSIS


DOC. REV.
SUPPLY CHAIN & LOGISTIC

MATERIAL STOCK
ANALYSIS
A COMPHERENSIVE REPORT
SAJEED AHMED
11/26/2017
DATE : 26/11/2017
MATERIAL STOCK ANALYSIS
DOC. REV. 00
SUPPLY CHAIN & LOGISTIC

1. FINISHED PRODUCT

Approx. Avg. Cost 5.7 Million QR

250

FINISHED PRODUCT STOCK (QTY in Mton)


200
197

150
138

106 105 103 106


100

52 46
39 48 46
50 28 25
15
7
10
0
G.I. S.S. Gyp. G.I. S.S. Cable
G.I. S.S. G.I. Coil S.S. Coil Gyp. Steel Cladding T Grid &
Metal Metal Partitio Block Block Ladders Tray / Others
Beads Beads Mesh Mesh Ceiling Lintels System Tiles
Lath Lath n Ties Ties Trunkin
Column 1 106 52 28 25 46 7 39 105 103 15 138 48 197 46 10 106

NOTE: OTHER : Strut Channel/Threaded Rod / Access Panel /Angle Bars/ Tubes/Flat Bars / Expansion Cover /some non standard items.