Drawings depicting details of damp proof courses, weepholes, lintels, oof tes to walls, et are supplemented by specifications
used to transiate designs nto physical reality. Detaling is therefore an important link between good design and quality construction.
‘The construction details that follow are examples of sound acceptable practice
EXTERIOR '
FBS, FBX or FBA bricks + on enat coment plaster
0mm cavity
Flr nigh on 26mm
‘coment eroes
Galvanised wire wall es
with rip or buttery wire
‘oi every 5 brick potesen: ‘T5mm conerete suface bed
(Open perpends at 900mm 250 micron dpm
interval to form weepholes ssuemas
Extemal ground evel filin ayers or 150mm max
‘cranked DPC sandwiched
between 2 half beds of|
mortar
‘Cavity filed with solid mortar
Foundation wall be | ‘upto DPC
TNX bricks
‘Concrete stip foundation
to comply with SABS 0400
‘SCALE 1:10
$00 minim |
" Be(cLiyprick
inteRIon
FOR APPLICATION
INWET CLIMATES.
EXTERIOR
(Outer face of nner leat
rektorce reinforcement’ + cof brickwork to be bagged
in every § brick courses & painted with no, 2 coats
of bituminous paint
FBS, FBX or FBA bricks
‘& mortar mix cass I
(One cost cement plaster
3 Floor rsh on 26mm
2
‘coment screed
Extemal ground level —> Lar ete
250 micron dpm
Foundation walliobe Compacted & graded ground
INE bic fil layers or 150mm max
Brickwork renforcament
in end walingis bul
1.5m height max
CConerete strip foundation
to comply wih SABS 0400
PIECE
= NEP bricks
‘mortar mie clas I
1 coat cement plaster ———_ i ‘sandicement
recrtnan isco
zenmecnentst
+ 25mm foor screed
<¢— 5mm concrete surface bed
250 micron dpm folded up
4 Graded 8 compacted ground
filin layers of 150mm max
tenet et
+ 200x600mm
‘ancente foundation
SCALE 1:10
2Clay Brick Technical Guide
Environment ena
NFP bricks.
Mortar moe class I
1 coat coment plaster —_________»| sandicement
Floor irish laid on
25mm cement seed
<— 26mm foor sereed
4 75mm concrete surtace bed
260 micron dpm folded up
+ Graded & compacted ground
filintayers of 150mm max
. s
ncn et
8 Concrete foundation
‘ung ada mo ew
owe enbdiet mtr
Bee ee(cLiyprick
90-140
NFP bricks
mortar mox class 1
1 coat cement plaster —___p. sandicement
— No dpe necessary here
Floor finish laid on
‘25mm cement soreed 1
‘SCALE 1:10
TO:
EXTERIOR
‘One coat cement plaster
Hardwood glazing bead set
in sealant and pinned to
hardwood sash
Polysuiphide sealant
‘Quarry tile si
Cement mortar bed
‘or quarry tile sil
‘SCALE 1:10
‘76mm concrete surface bed
<— 280 mieron dpm
Graded & compacted ground
fin layers of 180mm max
INTERIOR
——> + Typical hardwood window
‘sash section
‘Typical hardwood window
sill section
36x3 galvanised weather strip,
£250 micron dpc tucked under
‘weather strip built into timber frame
NFP bricks
}<—— one coat cement plaster
SeSIZ Clay Brick Technical Guide
Environment ena
EXTERIOR INTERIOR
Facebrick reveal ———>
Polysulphide seaiant ea Galvanised steel window frame
Quarry tile sil ~ <+— Internal tie sil
+—— Paster reveal
250 micron dpc tucked
under window frame
Cement mortar
+ 1 coat cement plaster
FBA, FBS or FBX bricks Bnicktorce every sth
brick course
7. NEP oe
SCALE 1:10
i
ey
EXTERIOR | INTERIOR
Hardwood acing bead Barner window
setin sealant and pinned to sash section
harawoed sash
— Typical hardwood window
F acebrick reveal silsecton
Polysuiphide sealant - 3839 galvanised ms weather strip
‘Quarry tie sit ——7* ; cutbriek
Cement mortar bed r 250 micron dpe tucked
for quay tie sil | under weather strip bul
into timber frame
FBA, FBS or FBX bricks ———~~
NFP bricks
Bow
[Seace 120]
[seace es] BPMs carrt per
Bee eeLAYBRiCK
INTERIOR
EXTERIOR |
Ferien: —» [MMI | ——sFirionad
Polysulphide sealant | a Galvanised steel window frame
Hardwood sill and scoria moulding
Quarry tile sil -, —
750 micron dpe tucked under
window frame
(Cement mortar
cavity
FBA, FBS or FBX bricks
NFP bricks
}<—— one coat cement plaster
Wire ties every Sth course
Horizontal -1000mm max apart
Vertical - 600mm max apart
(25 ties per sam)
1 140 [50] 110 |
EXTERIOR INTERIOR
Pastered reveal —————_> } + Plastered reveal
Haréod si and ——_ Hardwood window frame
‘sash sections | ae
4 — Hardwood sill and sootia
Polysuiphide sealant __
moulding
uary tile sit
Galvanised weather strip
250 micron dpe tucked
under weather strip in
timber frame
Cement mortar
NEP bricks
|
SCALE 1:10 |
mel
NFP bricks
One coat cement plaster
kore reinforcement
Lhe ‘every 5th brick course
SeSIZ Clay Brick Technical Guide
Environment ena
EXTERIOR INTERIOR
Plastered reveal ————» | «Plaster reveal
Polysulphide sealant Galvanised steel! window frame
Quarry tie sill ~*~ ) <—— Piastered internal window sill
250 micron dpc tucked
under window frame
Cement mortar
1 coat cement plaster
FBA, FBS or FBX bricks Brickforee every Sth
brick course
osc
EXTERIOR | INTERIOR
Face reved | << Prsstere reveat
Polysulphide sealant | | + Galvanised stee! window frame
Bullnose external sil =, 4 Terrazzo tile sill
250 micron dpc tucked
under window frame
100mm dpc overlap
Cement mortar
FBA, FBS or FBX bricks NFP bricks
Brickforce reinforcement |< One coat cement plaster
‘every Sth brick course
SCALE 1:10
Bee ee(cLiyprick
EXTERIOR BH INTERIOR
Fovewih ees! [J] Posted vent
Pepe seat —— fe tensed ste indo tae
250 micron dpc tucked
under window frame
Ne
‘Cement mortar
cosy
Fad FoBer Fox wet za
+ One coat cement plaster
Wall ties every 5th course
SCALE 1:10 Horizontal - 1000mm max apart
Vertical - 500mm max apart
os oe (25 0s persam)
nan
EXTERIOR INTERIOR
Galvanised steel window —————> Putty glazing to window
Polysulphide sealant Ceramic tile sill
One coat cement plaster — |
260 micron dpc tucked
Under stee! window frame
Cement mortar 400mm minimum dpe overlap
to form sill
NEP brickwork
External plaster sito ———+]
be painted and sealed —
)
‘SCALE 1:10
Se‘Clay Brick Technical Guide
Environment ena
EXTERIOR | INTERIOR
roca ovest RI] |< sted
Polyaipie seat Be [rr stig won
Fecetvck exe sit — il Hardwood si nd
—- ute
250 micron dpe tucked
under window frame
‘Cement mortar NFP bricks
FBA, FBS or FBX bricks Cavity
|< one coat cement plaster
sao aie cae
I i at
ba Fe Vertical - 500mm max apart
No 2s sot red nto
‘concrete clu strap bent
‘Sounto ree! bree course
renvoreadconerete column
SS
‘OUTSIDE ELEVATION
Note: Ste straps ae tobe built into mortar be
16332..400 gaanised ms sap
12mm soboard between
Bee eeEXTERIOR
NFP bricks
ms wall tie
cavity
250 micron vertical dpc
INTERIOR
"te ean external wal, provston must be made for movement ji
(1anm bitumen imprognated wotboard)
PLAN
‘SCALE TA)
(cLiyprick
12mm softboard between brickwork and concrete
Plaster and paint fnish
Polysulphide sealant to contro! joint 71 \
Reinforced concrete column
16 x 32 x 400 galvanised ms straps shot
pinned to concrete and laid in mortar bed
every fourth course
Polysulphide sealant to contro joint /v-joint
Posh ean
‘oom ms couel les
Pyne saint
‘nmin cove cred no
‘ue coum onal
iL Toaleech
Environment ena
FBS, FBX or FBAbricks
DPC must project to
face of facebrick
DPC to be laid
directly on brickwork
INCORRECT
EIe3
me
NFP Brks
| | ee
face of plaster
FBA, FBS or FBX bricks
INCORRECT
FBS, FBX or FBA bricks
DPC must project to
face of facebrick
DPC must be sandwiched
between 2 layers of mortar
CORRECT
Bee
‘Clay Brick Technical Guide
face of facebrick
Crack will develop
in line with OPC
INCORRECT
Ps
Plaster drip
ae
I] DPC to end flush
with brickwork face
DPC to be laid directly
(on brickwork
[E24 Fos or Fax
bricks
INCORRECT
i] Plaster
NEP bricks
Horizontal vjoint
in plaster
(n0 sealant needed)
CORRECT(cLiyprick
EXTERIOR
Concrete roof tiles roof _p
pitch min 17.5 degrees
4mm diam double strand
galvanised roof anchor
built in min 300mm
minimum 4 brick courses
above opening brick lintel
FBA, FBS or FBX bricks
NFP bricks
R8 rod reinforcement
id brick
Polysulphide sealant eng OR COLES
| <——— 1 coat cement plaster
SCALE 1:10 im a Steel window frame
Sec
EXTERIOR INTERIOR
NFP bricks + Minimum 4 brick
courses above opening
Polysulphide sealant
, R8 rod reinforcement every
Keyed drip brick course above opening
MV +——— ne coat cement plaster
NFP bricks
[sens v0] ———
SeSIZ Clay Brick Technical Guide
Environment ena
EXTERIOR INTERIOR
Minimum 4 brick. <1 coat cement plaster
‘courses above opening
Steel hangers built
RB rod reinforcement into brickwork above
‘on every course above lintel (every 4th brick horizontally)
Polysulphide sealant Brick on edge lintel
FBA, FBS or FBX bricks ———
<—_—— NFP bricks
S| |}+—_—— Stee! window frame
Bri
EXTERIOR me oe INTERIOR
Wall tie with drip or
250 mic DPC
butterfly wall tie sandwiched between 2
half beds of mortar
Open perpends at
900mm intervals <+— 1 coat cement plaster
Cavity above lintel Steel hangers built
to be filled with grout into brickwork
Cut brick lintel + hFP bricks
Polysulphide sealant a <———— Steel window frame
Keyed joint a
FBA, FBS or FBX bricks
Bri
Bee ee(cLiyprick
EXTERIOR INTERIOR
R@ rod reniforcement on
every brick course above lintel
250 micron dpe
minimum 4 brick courses
above opening
Steel hangers built into
brickwork above cavity
above lintel to be filled
with grout / mortar
|< 1 coat cement plaster
Reinforced concrete lintel
to engineers specifications
Brick on edge / soldier course
brick lintel
Polysulphide sealant
FBA, FBS or FBX bricks
|
‘SCALE 1:10 |
=
+ NFP bricks
i+————— Steel window frame
EXTERIOR aa INTERIOR
|
160 reinforced concrete slab
‘Square recessed tooled joint ‘8mm bitumen
lmpregnated softboard
Cavity above intel 1 be
filed with grout 175 gypsum plaster-board
‘comice if required
8 rod reniforcement on
‘every brick course above lintel NFP bricks
‘Open perpends at
‘900mm intervals
250 micron dpe
‘minimum 4 brick courses
above opening
Polysuiphide sealant
Cut brick titel
1 oat cement plaster
SCALE 1:10
‘Steel window frame
‘Note: This dotall is suitable for a mult-story building whore thore is
‘no protection from rain tothe area above the window
Se‘Clay Brick Technical Guide
Environment ena
EXTERIOR
‘Comugated sm —>-
roof sheeting
‘4mmidiam double strand
galvanised roof anchor
‘Steel hangers built into
built in 600mm minimum
brickwork above
8 rod reinforcing every
brick course above lintel
Cut brick on edge
Minimum 4 brick courses
Cavity above lintel to above opening
be filed with grout
4 coat cement plaster
a i
NFP bricks
FBA, FBS or FBX bricks
Polysulphide sealant
Pee
EXTERIOR
‘4mm diam double strand
galvanised roof anchor
built in 300mm minimum
RB rod reinforcing every
brick course above lintel
Gypsum plasterboard ceiling
NFP bricks 75 gypsum plasterboard comice
Polysulphide sealant Minimum 4 brick courses
x above openin
Keyed drip _—
| | <— _ nF bricks
| |< Aaminium window frame
<+—— 1 coat cement plaster
Bee ee
8(cLiyprick
EXTERIOR
FBA, FBS or FBX bricks
‘12mm softboard between brickwork and concrete
Bituminous paint to .c. column face and brick closures
Mild stee! wall ie Polysulphide sealant to control joint
Ruled vjoint
cavity
250 micron vertical dpe
Reinforced concrete column
NFP bricks
16 x 32 x 400 galvanised ms straps shot
INTERIOR pinned to concrete and laid in mortar bed
‘every fourth cowiree
joints
EXTERIOR
4mm diam double strand
galvanised roof anchor
builtin 300mm minimum
Steel hangers built into
brickwork above
Minimum 4 brick
Brick on edge lintel courses above opening
FBA, FBS or FBX bricks
R8 rod reinforcing
every brick course
above lintel
Polysulphide sealant
<— 1 coat cement plaster
NEP bricks
SCALE 1:10
SeClay Brick Technical Guide
Environment ena
NOTES.
" Ct