BILL OF QUANTITIES

PROJECT : Fuel Tank Storage


LOCATION : Lantawan, Basilan, Philippines
DATE :

ITEM No. DESCRIPTION QUANTITY UNIT


STRUCTURAL WORKS
A . 1 MASONRY WORKS
. 1 150mm Concrete Hollow Blocks 4,060.00 pcs
Sub-total Masonry Works 4,060.00 pcs
B. . 2 REBAR WORKS
. 1 Footing
a. 12mm bottom bars 102.10 kg
. 2 Column
a. 20mm main vertical bars 1,236.03 kg
b. 12mm tie bars 953.25 kg
. 4 Slab-on-fill
a. 12mm tansverse and longitudinal bars 199.09 kg
b. 12mm tansverse and longitudinal bars 60.46 kg
. 5 Slab
a. 16mm tansverse and longitudinal bars 1,596.33 kg
. 6 Wall
RC Wall - 1
a. 16mm vertical bars 323.97 kg
b. 12mm horizontal bars 178.70 kg
RC Wall - 2
a. 16mm vertical bars 662.66 kg
b. 12mm horizontal bars 377.31 kg
. 5 Consumables lot
Other items of work necessary to complete the intent of the plans and
specifications (specify)
a. G.I. Tie Wires 73.97 kg
Sub-total Rebar Works 5,763.87 kg
C . 3 CONCRETE WORKS
. 1 Footing 3.00 cu.m
. 2 Column 5.37 cu.m
. 3 Slab 15.13 cu.m
. 4 Slab-on-fill 5.58 cu.m
Sub-total Concrete Works 29.08 cu.m
D. . 4 STEEL WORKS
. 1 Truss
a. L x 65 x 65 x 6 2.04 kg
a. L x 50 x 50 x 6 1.28 kg
. 2 Purlins
a. 150 x 50 x 18 x 3 7.50 kg
. 3 Steel Pipe
a. PIPS80 12.80 kg
Sub-total Steel Works 23.62 kg
TOTAL FOR STRUCTURAL WORKS

Page 1 of 4
ITEM No. DESCRIPTION QUANTITY UNIT
TOTAL BID AMOUNT IN WORDS