2505 STONE MASONRY securely rammed into place.

The larger
WALLS stones shall not bear on the spalls used
(a) General for filling the voids. The top and ends of
Stone masonry walls may be plain packed the wall shall be neatly finished with
stone walls with dry joints or otherwise selected coping stones.
mortared stone walls with stones bedded The appearance of the completed wall
in cement mortar as indicated on the shall present an even and tight surface.
Drawings, as specified or as may be (c) Cement mortared stone walls
ordered. The walling shall be constructed as
The minimum mass of each stone used specified in (b) above, with the exception
shall be 10 kg and its minimum dimension that the stones shall be wetted and set in a
75 mm. 6:1 sand:cement mortar. The exposed
(b) Plain packed stone walls parts of the stones on the wall faces shall
A foundation trench shall be excavated be cleaned of all mortar by washing or
down to rock or to material with an wire brushing. The mortar shall be flush
adequate bearing capacity at a minimum pointed to the satisfaction of the Engineer,
depth of 300 mm below ground lever. who may require a capping and end
Larger selected stones shall be used for treatment of the same mortar.
the foundation layer. Flat and stratified Weep holes shall be provided as
stones shall be laid with the largest prescribed and shall be cleaned of mortar
dimension in the horizontal plane. Stones or any other clogging material that may
shall be packed individually to stagger the have entered during construction.
joints and to provide a minimum of voids,
and shall be firmly bedded against The walling shall be protected from the
adjoining stones. The spaces between the elements and kept moist for a minimum
larger stones shall be filled with spalls period of four days after completion.