ITEM NO.

FORMWORKS CREW SIZE


Formwork to footings
Formwork to isolated footings
Formwork to rafts
Formwork to rafts D>0.75m
Formwork to tie beams
Formwork to high level tie beams D>0.45m
Formwork to neck columns
Formwork to U/G water tank
Formwork to basement retaining walls
Formwork to columns (small size)
Formwork to columns (large size)
Formwork to D/S beam internal (shallow)
Formwork to D/S beam internal (deep)
Formwork to D/s beam external (shallow)
Formwork to D/s beam external (deep)
Formwork to lift walls single core
Formwork to lift walls multi core
Formwork to slab decking (10ft) hourdi
Formwork to slab decking (>10ft) hourdi D/S beams
Formwork to slab decking (>10ft) hourdi D/S beams
Formwork to slab decking (<10ft) hourdi
Formwork to staircase (non spiral)
Formwork to balcony parapets
Formwork to roof parapets
Formwork to
HOURLY PRODUCTION RATE PRODUCTION PER 8 HRS.