This 3 sentence document provides the report details for Orientation Term I from March 21, 2016 to June 20, 2016 for PT. Ungaran Sari Garments' Industrial Engineering department, specifically for Pringapus 2. The report comes from the Industrial Engineering department of PT. Ungaran Sari Garments located in Semarang.
This 3 sentence document provides the report details for Orientation Term I from March 21, 2016 to June 20, 2016 for PT. Ungaran Sari Garments' Industrial Engineering department, specifically for Pringapus 2. The report comes from the Industrial Engineering department of PT. Ungaran Sari Garments located in Semarang.
This 3 sentence document provides the report details for Orientation Term I from March 21, 2016 to June 20, 2016 for PT. Ungaran Sari Garments' Industrial Engineering department, specifically for Pringapus 2. The report comes from the Industrial Engineering department of PT. Ungaran Sari Garments located in Semarang.