STYLE : OPWF6066
No. Process SMV Target MP Calc

1 L/S S/N Join Shoulder Including Bagout Manual 37.76 650 1.03

2 L/S S/N T/S Shoulder 1/4" 20.08 650 0.55

3 C/S D/N Attach Sleeve into Armhole 1/4" 39.93 650 1.09

4 L/S S/N T/S Sleeve into Armhole 1/4" 35.34 650 0.96

5 C/S D/N T/S Join Side Seam Long Sleeve 1/4" 36.21 650 0.99

6 L/S S/N Staystitch on Neck Collar 13.04 650 0.35

7 L/S S/N Join Collar to Body 34.24 650 0.93

8 L/S S/N Close Collar to Body with Nose 44.07 650 1.20

9 L/S S/N Join Cuff into Sleeve (R+L) 69.29 650 1.89

10 L/S S/N Prefold Bottom Hemming 1/4" 35.38 650 0.96


11 Make Button Hole on Neck (1), Slit (2), Cuff (2), and Button 37.92 650 1.03

12 Attach Buttons on Neck (1), Slit (2), and Cuff (2) 34.25 650 0.93

13 Trimming Long Sleeve 99.36 650 2.70

TOTAL 14.61
N DAILY

Dipinjam (Out from Actual today Shortage


MP Req
this line) Opr MP

MP Req Act MP Delta M/C AVB Remaks

1
1

15
MAN POWER ASSEMBLY UPDATE ON DAILY

Date :
Absensi
Meminjam (add to
Line Spv Total MP
this line)
A S Dr Ct kluar Tot Abs

STYLE : OPWF6066
No. Process SMV Target MP Calc

1 L/S S/N Join Shoulder with Folder 0.1 cm 32.14 650 0.87

2 C/S D/N T/S Attach Sleeve into Armhole 0.6 cm 39.93 650 1.09

3 L/S S/N T/S Sleeve into Armhole 0.6 cm 35.34 650 0.96

4 C/S D/N T/S Join Side Seam Long Sleeve 0.5 cm 36.21 650 0.99

5 Press Side Seam After Joining Process (R+L) 24.00 650 0.65

6 L/S S/N Staystitch on Neck Collar 13.04 650 0.35

7 L/S S/N Join Collar to Body 34.24 650 0.93

8 L/S S/N Close Collar to Body continue T/S nose collar stand 37.01 650 1.01

9 L/S S/N Attach Cuff into Sleeve 69.29 650 1.89

10 L/S S/N Prefold Bottom Hemming 0.5 cm with folder 35.38 650 0.96
11 Make Buttonholes on Neck Collar (1), Slit (2), Cuff (2) 29.60 650 0.81

12 Attach Buttons on Neck Collar (1), Slit (2), Cuff (4) 39.70 650 1.08

13 Trimming Long Sleeve 99.36 650 2.70

TOTAL 14.30
N DAILY

Dipinjam (Out from Actual today Shortage


MP Req
this line) Opr MP

MP Req Act MP Delta M/C AVB Remaks

OPR 7

1
1

15
MAN POWER ASSEMBLY UPDATE ON DAILY

Date :
Absensi
Meminjam (add to Dipinjam (Out from Actual today Shortage
Line Spv Total MP MP Req
this line) this line) Opr MP
A S Dr Ct kluar Tot Abs

STYLE : KOHLS SPORT SHIRT 276RR


No. Process SMV Target MP Calc MP Req Act MP Delta M/C AVB Remaks

1 L/S S/N Join Shoulder Including Bagout Manual 37.76 600 0.95 1

2 L/S S/N T/S Shoulder 1/8" 20.08 600 0.50 1

3 C/S D/N Attach Sleeve to Arm Hole 1/4" 39.93 600 1.00 1

4 L/S S/N T/S Arm Hole 1/4" 35.34 600 0.89 1

5 C/S D/N Join Side Seam 1/4" Long Sleeve 36.21 600 0.91 1

6 L/S Staystich at Neck Seam 13.04 600 0.33 Opr 2

7 L/S Join Collar to Body 34.24 600 0.86 1

8 L/S S/N Attach Gross Grain to Neck Collar 41.38 600 1.04 1

9 L/S Close Collar with Nose 44.07 600 1.11 1

10 L/S S/N Attach Cuff to Sleeve 69.29 600 1.74 2

11 L/S Prefold Bottom Hemming 1/4" 35.38 600 0.89 1

12 Make Button Hole at Neck (1), Slit (2), Cuff (2) 29.60 600 0.74 1

13 Attach Buttons at Neck (1), Slit (2), Cuff (4) 45.50 600 1.14 1

14 Trimming Long Sleeve 99.36 600 2.50 2

TOTAL 14.60 15.00