Review meeting by

SUPERINTENDING ENGINEER,
Operation
Visakhapatnam

REVIEW
BOOKLET
ON 20.07.2021
WALTAIR SUBDIVISION
AGENDA POINTS OF REVIEW MEETING
ON 20.07.2021 OF WALTAIR SUB DIVISION

 Closing of Work Orders


 EPCCB (All Modules)
 Implementation of SOP Norms
 Release of HT services as per SAP
 KVAH billing in Cat-2 services for connected load >10KW
 Metering Exceptionals
a)MS, MB, DL & NC
b)UDC> 3billing months
c)Raising of short fall units against Voltages and Currents missing
d)Inspection of Port meter exceptionals
 Interruptions
 Network Maintainance works carried out
 Inspection of services
 Collections against UDC /BS srvices & TE/MP/BB/AL cases
 Requirement of material if any
PENDING WORK ORDER POSITION OF WTR SD AS ON 17.07.2021 (IN LAKHS)

                                 

2020-21 2020-21 2021-22 2021-22 Total Total Total

Sl PS PM PS PM PS PM PS & PM
Name of the AE Designation
No
Nos Amt Nos Amt Nos Amt Nos Amt Nos Amt Nos Amt Nos Amt

1 TULASI KIRAN KUMAR AE OPN D4 VSP 12 20.66 6 -109.59 16 2.99 8 5.64 28 23.65 14 -103.96 42 -80.31

2 MEDIDI RAJESH  AE OPN D5 VSP 12 16.68 13 -26.12 9 12.87 6 2.01 21 29.55 19 -24.11 40 5.45

3 DHANALAKOTA SURESH AE OPN MVP COLONY 16 17.32 0 0.00 26 10.71 14 2.29 42 28.03 14 2.29 56 30.32
S.S.S.H.K.K.
4 AE OPN SIRIPURAM 8 20.09 6 -66.62 10 6.62 13 1.83 18 26.71 19 -64.79 37 -38.08
CHAKRAVARTHY
5 V. APPARAO ADE OPN WALTAIR     1 5.89             1 5.89 1 5.89
- -
  WALTAIR SD 48 74.75 26 61 33.19 41 11.77 109 107.94 67 176 -76.73
196.44 184.66

07/25/2021
EPCCB Module -NSCs/ALPC
Section-Wise NSC and Load Changes requests (NONAGL)-BRT
NSC with Estimates Addi Load changes with estimates
Charges Intimation Service Release tion Charges Intimation Service Release
NSC Work al Work
with comp Loa comp
AA
out d
    Est Est Con WO Met O Est Est Con WO Met
esti Site Tot Rel Ser Tot with Site Tota Rel Ser Tota
Pre San s Iss Tur er App Pre San s Issu Tur er
mate Insp al Dep Req Rel al out Insp l Dep Req Rel l
p c Int ue nke fix rov p c Int e nke fix
s t Esti t
y al y
mat
es
1 MVP 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SIRIPU
2 RAM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
3 D4 0 0 0 0 0 0 0 0 0 32 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 D5 0 0 0 0 0 0 0 0 0 35 0 0 35 0 0 0 0 0 0 0 0 0 0 1 0 0 1
WALTAIR
SUBDIVISI
ON TOTAL 0 0 0 0 0 0 0 0 0 68 0 0 68 0 0 0 0 0 0 0 0 0 0 2 0 0 2

07/25/2021
EPCCB Module –CSC Requests

Section-wise CSC requests Pending Report


 Category
 Title Transfer  Meter related  CSC with estimates  Billing related Other Requests
Changes
 Sub
 Sect  WR  Tota  WR  Tota  WR  Tota  Charges  Work  WR  Tota  WR  Tota
 SNO Divisio  BRT  BRT  BRT  BRT  BRT
ion T l T l T l Intimation completion T l T l
n
 WR  Tota  WR  Tota
                   BRT  BRT            
T l T l
WALT
1 AIR MVP  0  0  0  0  0  0  0  0  0  0  0  0  1  0  1  0  0  0  0  0  0
SIRI
WALT PUR
2 AIR AM  0  0  0  1  0  1  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0
WALT
3 AIR D4  7  0  7  1  0  1  7  0  7  0  0  0  0  0  0  0  0  0  3  0  3
WALT
4 AIR D5  2  0  2  1  0  1  1  0  1  0  0  0  1  0  1  0  0  0  3  0  3
WALT
5 AIR Total 9 0 9 3 0 3 8 0 8 0 0 0 2 0 2 0 0 0 6 0 6

07/25/2021
EPCCB Module –M Billing

SPOT BILLING STATUS AS ON 07/2021 (Exception Meter Status- 02','03','05','11') Group - M


 Upload Services  Billing
  Self
  AGL,
Meter
HT
Readin
TVR,   Non IR Port
g   IR Port Services   Total Billed
Services
Net
Service
Metere
s
  NON   IR d&
 Sectio   Balanc
 S.No. IR Port Port   Billed   %
n Smart   Total e to be
Service Service (SMR) without Billed
Meters billed
s s IR
  IR
with   Balanc   Balanc   Before   After
  Billed Port
    Excepti e to be   Billed e to be due due   Total
with IR Billing
ons billed billed date date
(%)
(02,03,
    05 &
11)
1 MVP 12 600 51 0 663 582 18 0 100 12 0 657 6 663 100 0
SIRIPUR
2 1 1080 44 0 1125 1061 19 0 100 1 0 1120 5 1125 100 0
AM
3 D4 3 467 51 0 521 462 5 0 100 3 0 516 5 521 100 0
4 D5 0 472 37 0 509 462 10 0 100 0 0 505 4 509 100 0
WALTAIR SUB
DIVISION 16 2619 183 0 2818 2567 52 0 100 16 0 2798 20 2818 100 0
  TOTAL

07/25/2021
EPCCB Module –M1 Billing
SPOT BILLING STATUS AS ON 07/2021 (Exception Meter Status- 02','03','05','11') Group - M1
 Upload Services  Billing
  Self
  AGL,
Meter
HT
Readin
TVR,   Non IR Port
g   IR Port Services   Total Billed
Services
Net
Service
Metere
s
d&
 Sectio   NON   IR   Balan
 S.No. IR Port Port   Billed   % ce to
n Smart   Total
Service Service (SMR) withou Billed be
Meters
s s t IR billed
  Balan   IR   Balan
with   Before   After
  Billed ce to Port ce to
    Excepti   Billed due due   Total
with IR be Billing be
ons date date
billed (%) billed
(02,03,
    05 &
11)

1 MVP 2 14709 0 19 14730 14283 405 0 99.85 2 0 14170 541 14730 100 0

SIRIPUR
2 2 6017 0 0 6019 5937 80 0 100 2 0 6005 14 6019 100 0
AM

3 D4 8 14168 1561 8 15745 13878 288 0 99.99 8 0 15333 404 15745 100 0

4 D5 2 10170 0 1 10173 9927 243 0 100 2 0 10113 59 10173 100 0

WALTAIR SD 14 45064 1561 28 46667 44025 1016 0 99.95 14 0 45621 1018 46667 100 0

07/25/2021
Implementation of SOP Norms
Release of HT services as per SAP

PENDING AT RELEASE ORDER ISSUE

DATE
 Sl Divi- Secti DATE OF WORK  Date of  3months
REG. NO OF  Name of The Consumer  TYPE  Remarks
No sion on COMPLETION notice
REG.

VSP-1- 13.08.20 NEW


1 ZONE-1 MVP GVSSCL MD AND CEO 10.09.2020 15.09.2020 UCM Notice issued
00548 20 SERVICE

VSP-0- 30.10.20 Pusapati Seetha Rama NEW


2 ZONE-1 D4 22.01.2021 05.02.2021 UCM Notice issued
00637 20 Chandra Raju SERVICE

07/25/2021
KVAH Billing in Cat -2 services for connected load > 10KW

No KVAH SERVICES ABOVE 10KW AS ON 17.07.2021 OF ERO EAST


S.No. SUBDIV_NAM SECTION_NAME SCNO CONSUMER SCCA LOAD TYPE PHAS TVR_F LOAD_ SUBG STATU
E T E L T R S
AG YPE OUP
1 WALTAIR VISAKHAPATNAM-D5 1122051212068104' B V SURYANA 2 15 KW 3 N L M1 L
RAJU
2 WALTAIR MVP 112206B506062244' T.V.R.RAO 2 12.03 KW 3 N L M2 L

3 WALTAIR SIRIPURAM 1122080000389539' GHOUSE PASHA 2 30 KW 3 N H M F

4 WALTAIR VISAKHAPATNAM-D4 112204A104396388' CHAITANYA 2 11.43 KW 3 N L M1 L

5 WALTAIR VISAKHAPATNAM-D4 112204A104398601' CHAITANYA 2 11.83 KW 3 N L M1 L

07/25/2021
Metering Exceptionals- MS,MB,DL& NC

Section Wise Count wise Exceptions Report


 Exception Type
 Sect
Meter Change Not Nil
 Sln ion Stuckup Burnt UDC UDC Progess DoorLock
Effected Consumption
o. Nam
e 04- >1 Tot 04- >1 Tot 04- >1 Tot 04- 07- 13- >2 Tot 04- >1 Tot 02- 07- 13- >2 Tota 06- 13- >2 Tot
1 2 3 1 2 3 1 2 3 1 2 3
Dec 2 al Dec 2 al Dec 2 al Jun Dec 24 4 al Dec 2 al Jun Dec 24 4 l Dec 24 4 al
21
 1  MVP  12  0  0  0  0 12  0  0  0  0  0  0  0  0  0  0  0  0  4  0  0  0 4 95  1  0  0  0 96  195  67  11  0 273  144  72  0 6
 SIRI
PURA 24
 2 M  1  0  0  0  0 1  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0 21  0  0  0  0 21  33  0  0  0 33  133  11  0 5
2 27
 3 D4  4  0  0  0  0 4  0  0  0  0  0  0  0  0  0  0  0  0  9  1  0  0 10 58  0  0  0  0 58  67  0  0  0 67  165  10  0 1
6
 4 D5  9  0  0  0  0 9  0  0  0  0  0  0  0  0  0  0  0  0  6  0  0  0 6 25  0 1  0  0 26  1  0  0  0 1  3  6  0 9
WALTAI
R  Total :  2  1  20  29  74
  6  0  0  0  0  26  0  0  0  0  0  0  0  0  0  0  0  0  19  1  0  0  20 99  1  1  0  0 1  296  67  11  0  374  445 6  0 1

07/25/2021
Metering Exceptionals- UDC> 3 Billing Months

UDC>3 Billing months


UDC  
S No. Section
04-Jun 07-Dec 13-24 >24 Total Remarks

 1  MVP  4  0  0  0 4  

 2  SIRIPURAM  0  0  0  0  0  

 VISAKHAPATNAM-
 3 D4  9  1  0  0 10  

 VISAKHAPATNAM-
 4 D5  6  0  0  0 6  

WALTAIR  Total :    19  1  0  0  20  

07/25/2021
Metering Exceptionals- Final Reading differences with MRT and raising
of shortfall units

Status of Updation of Testing of Meters by MRT for FR Difference Services from 01-Jan-2014 to 17-Jul-2021
 Short Fall to be Raised by AAO
 Meter
 Final Reading Creeping/Readi
Difference ng Jumping
Services (updated by  To be Raised  Units raised Fully  Partial units Raised  Not Required  Balance
Section
MRT)

  SF  Raised
 SCs   Units  SCs   Units  SCs  SCs   Units  Dr RJ  SCs  Dr RJ  SCs   Units  SCs   Units
S No. Units Units

1 MVP 297 1647847 0 0 297 1647847 157 10531 51499 7 526 3795 133 1636789 0 0

2 SIRIPURAM 137 925322 0 0 137 925322 32 1261 8315 6 310 1373 99 923751 0 0

VISAKHAPAT
200 360986 0 0 200 360986 37 2426 11988 19 2487 14902 144 356073 0 0
NAM-D4
3
VISAKHAPAT
231 3679996 0 0 231 3679996 77 8580 59111 12 732 4051 142 3670684 0 0
4 NAM-D5

WALTAIR
865 6614152 0 0 865 6614152 303 22798 130913 44 4055 24121 518 6587298 0 0
  SD

07/25/2021
Metering Exceptionals- Raising of Shortfall units against Voltage and
Current missing

Current Missing Inspection Report as on 06/2021 and with All Services


No.of
Sub_divis Already To be Amount Amount
S.NO. Circle Division Section Services IR PORT Short fall
ion Inspected Inspected Assessed Collected
Units

VISAKHA
VISAKHA PATNAM 220 ALL 220 0
1 PATNAM ZONE-1 WALTAIR MVP 0 0 0

VISAKHA
VISAKHA PATNAM SIRIPUR 526 ALL 526 0
2 PATNAM ZONE-1 WALTAIR AM 0 0 0

VISAKHA VISAKHA
VISAKHA PATNAM PATNAM- 189 ALL 189 0
3 PATNAM ZONE-1 WALTAIR D4 0 0 0

VISAKHA VISAKHA
VISAKHA PATNAM PATNAM- 194 ALL 194 0
4 PATNAM ZONE-1 WALTAIR D5 0 0 0
WALTAIR SUBDIVISION TOTAL 1129 ALL 501 628     

07/25/2021
Metering Exceptionals- Raising of Shortfall units against Voltage and
Current missing

Voltage Missing Inspection Report as on 06/2021 and with All Services


Already To be No.of
Sub_divis Amount Amount
S.NO. Circle Division Section Services IR Port Inspecte Inspecte Short fall
ion Assessed Collected
d d Units

VISAKHA
VISAKHA PATNAM
1 PATNAM ZONE-1 WALTAIR MVP 36 ALL 36 0 0 0 0

VISAKHA
VISAKHA PATNAM SIRIPUR
2 PATNAM ZONE-1 WALTAIR AM 8 ALL 8 0 0 0 0

VISAKHA VISAKHA
VISAKHA PATNAM PATNAM-
3 PATNAM ZONE-1 WALTAIR D4 28 ALL 28 0 0 0 0

VISAKHA VISAKHA
VISAKHA PATNAM PATNAM-
4 PATNAM ZONE-1 WALTAIR D5 71 ALL 71 0 0 0 0
WALTAIR SUBDIVISION TOTAL 142 ALL 142 0 0 0 0

07/25/2021
33KV INTERRUPTIONS ABSTRACT FROM 01.06.2021TO 30.06.2021

Total Total
Sl. Subdivisi Duratio Duratio Duratio Durati Duratio Momen Duratio
Section BDs ELRs HTs ICFs LCs interru Duratio
No. on n n n on n tary n
ptions n

1 WALTAIR MVP 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00

2 WALTAIR SIRIPURAM 0 00:00 0 00:00 0 00:00 0 00:00 2 05:12 0 00:00 2 05:12

3 WALTAIR D4 0 00:00 0 00:00 0 00:00 0 00:00 1 04:23 0 00:00 1 04:23

4 WALTAIR D5 0 00:00 0 00:00 0 00:00 0 00:00 1 03:10 0 00:00 1 03:10

WALTAIR SUB-DIV 0 00:00 0 00:00 0 00:00 0 00:00 4 12:45 0 00:00 4 12:45

• LC taken by AE/M/APTRANSCO for rectification of hot line remarks at SS yard. (Alternate availed to
33/11KV KGH, RK Beach & Collector office SS at 06 Hrs from 132KV Pedawaltair SS)
D5

• LC taken by AE/M/APTRANSCO for rectification of hot line remarks at SS yard. (Alternate availed to
33/11KV GVMC & Pandurangapuram SS at 06:10 Hrs from 132KV Common point SS).
• Partial bus LC taken by AE/M/APTRANSCO for jumper cut rectification work at yard. (Idle)
SRPM

• LC taken for tree clearance work. (Alternate availed to 33/11KV Sivajipalem SS from 132KV Pedawaltair
from 18.06.2021)
D4
33KV INTERRUPTIONS ABSTRACT FROM 01.07.2021 TO 31.07.2021

Total Total
Sl. Subdivisi Duratio Duratio Duratio Duratio Momen Duratio
Section BDs ELRs HTs ICFs Duration LCs interru Duratio
No. on n n n n tary n
ptions n

1 WALTAIR MVP 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 1 00:55 1 00:55

SIRIPUR
2 WALTAIR 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 4 00:56 4 00:56
AM

3 WALTAIR D4 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 2 00:38 2 00:38

4 WALTAIR D5 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00

WALTAIR SUB-DIV 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 7 02:29 7 02:29

• Tripped on E/L. (Delay due to gale & rain) (Alternate availed at 15:15 Hrs from 132KV Pedawaltair-33KV
RCD feeder)
MVP

• Tripped on E/L. (Delay due to rain)

SRPM

• Tripped on E/L. (Delay due to line patroling done) (Alternate availed to 33/11KV Sivajipalem SS from
132KV Pedawaltair feeder at 03:55 Hrs)
D4
11KV INTERRUPTIONS ABSTRACT FOR THE MONTH OF JUNE 2021

Subdivisi Durati Durati Durati Momen Durati


Sl. No. Section BDs ELRs HTs LCs Duration interru Durati
on on on on tary on
ptions on

1 WALTAIR MVP 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00

2 WALTAIR SIRIPURAM 0 00:00 0 00:00 0 00:00 0 00:00 2 00:25 2 00:25

3 WALTAIR D4 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00

4 WALTAIR D5 0 00:00 0 00:00 0 00:00 4 01:00 5 00:40 9 01:40

WALTAIR SUB-DIV 0 00:00 0 00:00 0 00:00 4 01:00 7 01:05 11 02:05

07/25/2021
11KV INTERRUPTIONS FOR THE MONTH OF JUNE-
2021
Time of Interruption

33/11KV Sub Interrupti


Sl. No. Division Sub-Division Section 11KV feeder Duration Details
Station From To on Type

Tripped on E/L & O/L B-Phase.


11KV 17:34on06- 17:50on06-
1 ZONE-I WALTAIR D5 33/11KV KGH 00:16 Momentary (Delay due to coconut tree branches
Maharanipeta Jun-2021  Jun-2021 
fallen on line at Customs Office)

LC taken for maintenance work by


33/11KV New 11KV KGH 11:50on30- 12:05on30- TRE wing. (Alternate availed from
2 ZONE-I WALTAIR D5 00:15 Line Clear
KGH (Dedicated) Jun-2021  Jun-2021  33/11KV Collector Office SS at
11:55 Hrs)
LC taken for maintenance work by
33/11KV New 11:50on30- 12:05on30- TRE wing. (Alternate availed from
3 ZONE-I WALTAIR D5 11KV Paindorapeta 00:15 Line Clear
KGH Jun-2021  Jun-2021  33/11KV Collector Office SS at
11:55 Hrs)
LC taken for maintenance work by
33/11KV New 11:50on30- 12:05on30- TRE wing. (Alternate availed from
4 ZONE-I WALTAIR D5 11KV Tadiveedhi 00:15 Line Clear
KGH Jun-2021  Jun-2021  33/11KV Collector Office SS at
11:55 Hrs)
LC taken for maintenance work by
33/11KV New 11KV Kotha 11:50on30- 12:05on30- TRE wing. (Alternate availed from
5 ZONE-I WALTAIR D5 00:15 Line Clear
KGH Salipeta Jun-2021  Jun-2021  33/11KV Collector Office SS at
11:55 Hrs)

33/11KV 15:04on20- 15:09on20-


6 ZONE-I WALTAIR SIRIPURAM 11KV Kailasametta 00:05 Momentary Tripped on E/L.
Siripuram Jun-2021  Jun-2021 

33/11KV 11KV CBM 06:50on24- 07:10on24-


7 ZONE-I WALTAIR SIRIPURAM 00:20 Momentary Tripped on E/L.
Siripuram Compound Jun-2021  Jun-2021 

33/11KV New 11KV KGH 07:31on24- 07:37on24-


8 ZONE-I WALTAIR D5 00:06 Momentary LV tripped on E/L.
KGH (Dedicated) Jun-2021  Jun-2021 

33/11KV New 07:31on24- 07:37on24-


9 ZONE-I WALTAIR D5 11KV Paindorapeta 00:06 Momentary LV tripped on E/L.
KGH Jun-2021  Jun-2021 

33/11KV New 07:31on24- 07:37on24-


10 ZONE-I WALTAIR D5 11KV Tadiveedhi 00:06 Momentary LV tripped on E/L.
KGH Jun-2021  Jun-2021 

33/11KV New 11KV Kotha 07:31on24- 07:37on24-


11 ZONE-I WALTAIR D5 00:06 Momentary LV tripped on E/L.
KGH Salipeta Jun-2021  Jun-2021 

07/25/2021
11KV INTERRUPTIONS ABSTRACT FOR THE MONTH OF JULY 2021

Subdivi Durati Durati Durati Durati


Sl. No. Section BDs ELRs HTs LCs Duration Momentary interru Durati
sion on on on on
ptions on

WALTAI
1 MVP 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00
R

WALTAI SIRIPU
2 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00 0 00:00
R RAM

WALTAI
3 D4 0 00:00 0 00:00 1 00:09 0 00:00 2 00:17 3 00:26
R

WALTAI
4 D5 0 00:00 0 00:00 1 00:10 0 00:00 0 00:00 1 00:10
R
WALTAIR SUB-DIV 0 00:00 0 00:00 2 00:19 0 00:00 2 00:17 4 00:36

07/25/2021
11KV INTERRUPTIONS FOR THE MONTH OF JULY 2021 (Up to
16.07.2021)

33/11KV Time of Interruption


Sub- 11KV Interrupti
Sl. No. Division Section Sub Duration Details
Division feeder on Type
Station From To

Hand Tripped due


VISAKHAPA 33/11KV 11KV 04:21on01- 04:30on01- Hand to HG fuse
1 ZONE-I WALTAIR 00:09
TNAM-D4 Pedawaltair Chinawaltair Jul-2021  Jul-2021  Tripped replacement work
at SS 173.

VISAKHAPA 33/11KV 11KV VN 09:33on02- 09:45on02- Tripped on E/L.


2 ZONE-I WALTAIR 00:12 Momentary
TNAM-D4 Pedawaltair Palace Jul-2021  Jul-2021  (Delay due to rain)

VISAKHAPA 33/11KV 11KV VN 14:50on07- 14:55on07-


3 ZONE-I WALTAIR 00:05 Momentary Tripped on E/L.
TNAM-D4 Pedawaltair Palace Jul-2021  Jul-2021 

Hand Tripped for


11KV
VISAKHAPA 33/11KV RK 11:02on06- 11:12on06- Hand loads change over
4 ZONE-I WALTAIR Buddavarap 00:10
TNAM-D5 Beach Jul-2021  Jul-2021  Tripped to 33/11KV KGH
u Gardens
SS.

07/25/2021
OMS- Section Wise Feeder Interruption Analysis- June 2021
Interruption
SI.No Reason Type D4 D5 MVP SIRIPURAM Total Duration(DAYS:HRS:
MM)

1 Breakdown - Line related 0 0 0 1 1 0000 : 00 : 45


2 Breakdown - SS related 0 0 1 0 1 0000 : 00 : 14

3 Line Clear - Line maintenan 8 6 0 1 15 0000 : 16 : 46


ce

4 Line Clear - SS maintenance 0 10 1 0 11 0000 : 05 : 18

5 Incoming Supply Failure (ICF 2 31 0 0 33 0000 : 01 : 56


)

6 Momentary Interruptions ( 7 3 1 0 11 0000 : 00 : 51


MI)
  Total: 17 50 3 2 72  
OMS- Section Wise Feeder Interruption Analysis- July 2021
Interruption
SI.No Reason Type D4 D5 MVP SIRIPURA Total Duration(DAYS:HRS:M
M
M)

1 Breakdown - Line related 0 0 2 0 2 0000 : 00 : 38

2 Line Clear - Line maintenan 3 7 2 1 13 0000 : 04 : 17


ce

3 Line Clear - SS maintenance 8 5 0 0 13 0001 : 05 : 08

4 Incoming Supply Failure (IC 0 37 2 1 40 0000 : 10 : 41


F)

5 Momentary Interruptions ( 6 4 2 0 12 0000 : 01 : 00


MI)
  Total: 17 53 8 2 80  

07/25/2021
NETWORK MAINTAINANCE WORKS CARRIED OUT

07/25/2021
INSPECTION OF SERVICES

07/25/2021
COLLECTION AGAINST UDC SERVICES

UDC ABSTRACT REPORT AS ON :: 07/2021


 SUB_DIVI
 S.NO.  CIRCLE  DIVISION  SECTION  SERVICES  OB_AMT  DEM_AMT  DRJ_AMT  COL_AMT  CRJ_AMT  CB_AMT
SION

VISAKHAP
VISAKHAP ATNAM
1 ATNAM ZONE-1 WALTAIR MVP 229 1164261 151090 2 260476 29253 1025624

VISAKHAP
VISAKHAP ATNAM SIRIPURA
2 ATNAM ZONE-1 WALTAIR M 116 1099624 132011 0 540310 0 691324

VISAKHAP
VISAKHAP ATNAM VISAKHAP
3 ATNAM ZONE-1 WALTAIR ATNAM-D4 278 543482 106712 0 131007 0 519186

VISAKHAP
VISAKHAP ATNAM VISAKHAP
4 ATNAM ZONE-1 WALTAIR ATNAM-D5 167 304080 58132 0 39098 0 323114

WALTAIR SUB DIVISION TOTAL 790 3111448 447945 2 970892 29253 2559250

07/25/2021
COLLECTION AGAINST BS SERVICES

NB ABSTRACT REPORT AS ON :: 07/2021


 SUB_DIVI
 S.NO.  CIRCLE  DIVISION  SECTION  SERVICES  OB_AMT  DEM_AMT  DRJ_AMT  COL_AMT  CRJ_AMT  CB_AMT
SION

VISAKHAP
VISAKHAP ATNAM
1 ATNAM ZONE-1 WALTAIR MVP 76 115079 0 0 0 10 115069

VISAKHAP
VISAKHAP ATNAM SIRIPURA
2 ATNAM ZONE-1 WALTAIR M 30 31996 0 0 59 0 31937

VISAKHAP
VISAKHAP ATNAM VISAKHAP
3 ATNAM ZONE-1 WALTAIR ATNAM-D4 97 191939 0 75 0 0 192014

VISAKHAP
VISAKHAP ATNAM VISAKHAP
4 ATNAM ZONE-1 WALTAIR ATNAM-D5 157 213444 0 76 132 0 213388

WALTAIR SUB DIVISION TOTAL 360 552459 0 151 191 10 552409

07/25/2021
COLLECTION AGAINST TE/MP/BB/AL CASES

MATS Cases Collection Report for the Period From01-Jun-2021 To 30-Jun-2021

UNAUTHORISED USE
Addl Load Cases SHORTBILLING Total
OF ELECTRICITY
Section

Scs Amount Scs Amount Scs Amount Scs Amount

MVP 10 122390 0 0 1 100263 11 222653


SIRIPURAM 9 66331 5 69582 0 0 14 135913
VISAKHAPATNAM-D4 1 12659 0 0 3 42328 4 54987
VISAKHAPATNAM-D5 15 104780 1 12017 0 0 16 116797
Waltair Total 35 306160 6 81599 4 142591 45 530350

07/25/2021
COLLECTION AGAINST TE/MP/BB/AL CASES

MATS Cases Collection Report for the Period From 01-Jul-2021 To 17-Jul-2021

UNAUTHORISED USE
Addl Load Cases SHORTBILLING Total
OF ELECTRICITY
Section

Scs Amount Scs Amount Scs Amount Scs Amount

MVP 53 386222 0 0 1 9521 54 395743

SIRIPURAM 35 311583 2 34545 0 0 37 346128


VISAKHAPATNAM-
24 251370 0 0 0 0 24 251370
D4
VISAKHAPATNAM-
2 12977 1 21941 1 17706 4 52624
D5
Waltair Total 114 962152 3 56486 2 27227 119 1045865

07/25/2021
REQUIREMENT OF MATERIAL IF ANY