Basement Ground floor Mezzenine Floor 1st floor
As on
As on As on As on As on
date As on
date date date date Total
Total Total Total Total Completi Date % of
Sl no. Items description Unit Completi Completi Completi Completi Quantity Remarks
Quantity Quantity Quantity Quantity on Completi
on on on on (Approx)
(Approx) (Approx) (Approx) (Approx) Quantity on
Quantity Quantity Quantity Quantity
(Approx)
(Approx) (Approx) (Approx) (Approx)
Internal Electrifications
1 Light point wiring Nos. 439 390 574 445 250 220 613 1876 1055 56.24%
2 Power Point wiring Nos. 131 409 82 164 786 0 0.00%
3 DB Fixing Nos. 16 16 24 4 12 56 16 28.57%
4 Cable tray installation Mtr 837 325 558 100 279 300 1974 425 21.53%
5 Raceway installation Mtr 1700 480 1145 540 150 300 3295 1020 30.96%
6 LT Cable laying Mtr 1365 2275 455 910 5005 0 0.00%
7 SITC of Panels Nos. 12 20 4 8 44 0 0.00%
8 Earthing strip works Mtr 1200 560 1500 500 1000 4200 560 13.33%
9 SITC of UPS Nos. 8 0 0 0 8 0 0.00%
10 Light fixtures fixing Nos. 439 574 236 613 1862 0 0.00%
ELV
CCTV Cable laying Mtr 2250 6600 1450 2250 12550 0 0.00%
11 Cable laying for CCTV Points Nos. 45 132 29 45 251 0 0.00%
12 Cable laying for FIDS Points Nos. 3 60 1 19 83 0 0.00%
14 FIDS Cables Mtr 150 3000 50 950 4150 0 0.00%
13 Cable laying for Data Points Nos. 13 157 27 37 234 0 0.00%
16 Data Point cable laying Mtr 650 7850 1350 1850 11700 0 0.00%
14 Cable laying for Voice points Nos. 18 123 33 30 204 0 0.00%
18 Voice point cable laying Mtr 900 6150 1650 1500 10200 0 0.00%
15 Cable laying for Wifi point Nos. 5 4 3 0 12 0 0.00%
20 Cable laying for Wifi Mtr 250 200 150 0 600 0 0.00%
16 Cable laying for Access control points Nos. 5 17 3 11 36 0 0.00%
22 Cable laying for Access control points Mtr 250 850 150 550 1800 0 0.00%
17 Cable laying for Spekaer Points Nos. 47 118 47 80 292 0 0.00%
24 Cable laying for speaker points Mtr 150 4800 1140 2060 8150 0 0.00%
FAS
18 Fire survival Cables for DETECTORS points Nos. 318 60 336 8 106 22 257 1107 90 8.13%
19 Fire survival Cables for MCP points Nos. 14 16 4 9 43 0 0.00%
20 Fire survival Cables for Hooter points Nos. 15 16 4 9 44 0 0.00%
21 Fire survival Cables for Control Module Nos. 30 29 12 22 93 0 0.00%
22 Fire survival Cables for Monitor modules Nos. 5 10 5 15 35 0 0.00%
23 Cables for FAS Panel Nos. 0 1 0 0 1 0 0.00%
24 Fire survival Cables Mtr 4680 3405 1090 2820 11995 0 0.00%
HVAC
24 Chilled Water piping Mtr 1364 360 2273 455 909 5000 360 7.20%
25 Ducting Sq mtr 5500 4800 5909 1182 2364 13000 4800 36.92%
27 AHU Nos. 6 10 2 4 22 0 0.00%
28 FCU Nos. 5 9 2 4 20 0 0.00%
26 Drain Piping Mtr 1636 2727 545 1091 6000 0 0.00%
30 HRU Nos. 5 5 0 0.00%
Ventilation System
27 Power Cable laying of Tube Axial flow Fan point Nos. 11 19 4 8 42 0 0.00%
28 Power Cable laying of Pressurisation Fan point Nos. 2 3 1 1 6 0 0.00%
29 Power Cable laying of Exhaust Air Fan point Nos. 4 6 1 2 13 0 0.00%
30 Power Cable laying of Inline Fan point Nos. 2 3 1 1 6 0 0.00%
31 Power Cable laying of PROPELLER FAN point Nos. 2 4 1 1 8 0 0.00%
Fire Fighting
32 Hydrant Piping Mtr 1036 280 1727 160 345 691 3800 440 11.58%
33 Sprinkler Piping Mtr 3682 620 6136 1227 2455 120 13500 740 5.48%
43 Sprinkler Nos. 1370 2283 457 913 5022 0 0.00%
44 FHC Nos. 11 18 4 7 40 0 0.00%
45 ABC Type Fire Extinguisher Nos. 25 41 8 17 91 0 0.00%
46 Co2 Type Fire Extinguisher Nos. 25 41 8 17 91 0 0.00%
47 Foam Type Fire Extinguisher Nos. 2 2 0 0.00%
48 Clean agent 2.0 kg Fire Extinguisher Nos. 25 41 8 17 91 0 0.00%
49 4 Way Fire Brigade Connection Nos. 3 3 0 0.00%
50 Gas Supression System Job 1 0 0.00%