The document shows engineering drawings with elevation measurements for a causeway project. Key elevations include the benchmark level at 0.1000, a reference elevation of 3.8000, and the maximum water level line at 7.00. Steel sheet piles and rail lines are shown at various depths below the benchmark and reference elevations.
The document shows engineering drawings with elevation measurements for a causeway project. Key elevations include the benchmark level at 0.1000, a reference elevation of 3.8000, and the maximum water level line at 7.00. Steel sheet piles and rail lines are shown at various depths below the benchmark and reference elevations.
The document shows engineering drawings with elevation measurements for a causeway project. Key elevations include the benchmark level at 0.1000, a reference elevation of 3.8000, and the maximum water level line at 7.00. Steel sheet piles and rail lines are shown at various depths below the benchmark and reference elevations.