You are on page 1of 2

APPENDIX D

The following flowchart is an example of the typical steps required for Category 2 watermain breaks.
Note: The sequence of actions may be varied as appropriate for the specific situation. Any additional
directions given by the Ministry and/or the local Medical Officer of Health must be followed.

You might also like