You are on page 1of 1

04

03

02

01
Indice Data Modificare Proiectant Aprobat Consultant Aprobat CFR
Index Date Modification/Revision Designer Approved Consultant Approved CFR

GUVERNUL ROM NIEI PROIECT FINAN AT DE UNIUNEA EUROPEAN


ROMANIAN GOVERNMENT EUROPEAN UNION FINANCED PROJECT

C.N.C.F. "C.F.R." - S.A.


CLIENT / CLIENT
Data Semn tur
CONSULTANT / CONSULTANT Date Signature
Aprobat
Approved
Data Semn tur
PROIECTANT / DESIGNER Date Signature
Aprobat
Approved
Data Semn tur
CONSTRUCTOR/ CONTRACTOR Date Signature
Accepted
Acceptat

PROIECTANT DTE
DTE DESIGNER
Proiectat Proiectant
Designed Designer Razvan Secu 01.06.2015
Verificat Proiectant
Verified Designer Constantin Miculete 01.06.2015
Aprobat Sef proiect
Approved Project manager
George Vaduva 01.06.2015
Reabilitarea liniei de cale ferata a coridorului IV Pan European, pentru
circula ia trenurilor cu viteza maxim de 160 km/h,
Tronsonul : Co lariu

Section : Co lariu

STA TIE
PLAN ARMARE RADIER CULEE/ ABUTMENT PLAN RAFT REINFORCEMENT
POD / BRIDGE KM pr. 449+891,23 (KM ex. 456+278,23 / KM fisa 456+276)

Nr. / No
Codificare / Codification System
1:100 12

6 2 B C P V 0 0 7 0 0 1 2

You might also like