STAIRCASE 1 (GRIDLINE K-H/1A-1B) - 1 span

SPAN 1
DEAD LOAD LIVE LOAD
Slab
Length = 11 m Length = 11 m
Width = 1.2 m Width = 1.2 m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 66 kN
Total = 66 kN

Beam
Length = 11 m
Width = 0.3 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 49.5 kN

Total dead load imposed on structure = 57.750 kN (at GLB28 & L2B60)
Total live load imposed on structure = 33.000 kN (at GLB28 & L2B60)
STAIRCASE 2 (GRIDLINE H&K/4B-4E) - 2 spans

SPAN 1
DEAD LOAD LIVE LOAD
Slab
Length = 3m Length = 3m
Width = 1.2 m Width = 1.2 m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 18 kN
Total = 18 kN

Beam
Length = 1.5 m
Width = 0.2 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 4.5 kN

SPAN 2
DEAD LOAD LIVE LOAD
Slab
Length = 3.63 m Length = 3.63 m
Width = 1.2 m Width = 1.2 m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 21.78 kN
Total = 21.78 kN

Beam
Length = 1.5 m
Width = 0.2 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 4.5 kN

Total dead load imposed on structure = 9.000 kN (at CLB102 & CLB108)
= 12.195 kN (at C3 & C6)
= 9.075 kN/m (at L2 slab)
Total live load imposed on structure = 9.000 kN (at CLB102 & CLB108)
= 19.890 kN (at C3 & C6)
= 9.945 kN/m (at L2 slab)
STAIRCASE 3 (at Entrance 2) - 4 spans

SPAN 1
DEAD LOAD LIVE LOAD
Slab
Length = 2.935 m Length = 2.935 m
Width = 2m Width = 2m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 29.35 kN
Total = 29.35 kN

Beam
Length = 2.935 m
Width = 0.3 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 13.2075 kN

SPAN 2
DEAD LOAD LIVE LOAD
Slab
Length = 5.535 m Length = 5.535 m
Width = 2m Width = 2m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 55.35 kN
Total = 55.35 kN

Beam
Length = 5.535 m
Width = 0.3 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 24.9075 kN
SPAN 3
DEAD LOAD LIVE LOAD
Slab
Length = 5.535 m Length = 5.535 m
Width = 2m Width = 2m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 55.35 kN
Total = 55.35 kN

Beam
Length = 5.535 m
Width = 0.3 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 24.9075 kN

SPAN 4
DEAD LOAD LIVE LOAD
Slab
Length = 4.015 m Length = 4.015 m
Width = 2m Width = 2m
Thickness = 0.2 m IL = 5 kN/m2
γconcrete = 25 kN/m3 Total = 40.15 kN
Total = 40.15 kN

Beam
Length = 4.015 m
Width = 0.3 m
Depth = 0.6 m
γconcrete = 25 kN/m3
Total = 18.0675 kN

Total dead load imposed on structure = 21.279 kN (at CLB212)


= 61.408 kN (at S1 at Gridline 5A)
= 80.258 kN (at S1 at Gridline 5B)
= 69.238 kN (at S1 at Gridline 5C)
= 29.109 kN (at GLB129)
Total live load imposed on structure = 14.675 kN (at CLB212)
= 42.350 kN (at S1 at Gridline 5A)
= 55.350 kN (at S1 at Gridline 5B)
= 47.750 kN (at S1 at Gridline 5C)
= 20.075 kN (at GLB129)