Professional Documents
Culture Documents
Vigilance Corner List of Registers PDF
Vigilance Corner List of Registers PDF
Sl. No Date Instructions issued on the Inspection of work Contractor / Compliance Final remarks of site Engineer with
with Signature and designation contractor's report by Signature, designation & date
representative contractor /
acknowledgeme contractor's
nt with representative
Signature, Name with Signature,
& Date Name & date
1 2 3 4 5 6
2. Hindrance Register
Sl. No. Nature of Hindrance Date of Date of Period Over laping Weightage of Net effective Remarks and Sign. of Site Contractor /
Occurance clearance period if any hindrance days of references Engineer contractor's
hindrance with date representativ
e Signature
with Name &
date
1 2 3 4 5 6 7 8 9 10 11
3. Drawing Register
Sl. Date of Source of Bill/ Manufactur Quantity Progressive Date of Qty. Qty. Net Qty Progressi Balance Items of Sign. of Sign of Remarks
No. Receipt Receipt Challan turer Test Received Total of Issue Issued Returned issued ve Total at the work for Site Contractor
no. Ceritifcate (bags) Receipts (Bags) at the end (Bags) of issue end of which Engineer with date
reference (Bags) of the (Bags) the day Issued with date
Day (Bags)
(Bags)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
5. Steel Register
Sl. No Date of Source of Qty Cum Qty Date of Qty Cummula Balance Item of Sign. Of Sign. Of Manufactu Remarks
Receipt Receipt & Received Received Issue issued tive qty at the end work in Site contractor re Test
Ch. No. (MT) (MT) (MT) issued of the Day which Engineer with date certificate
/Bill No. (MT) (MT) consumed with date details
1 2 3 4 5 6 7 8 9 10 11 12 13 14
6. Sieve Analysis of Stone Aggregate Nominal Size
Sl. No. Date Weight of Size of Weight %age of Cummula %Age of Specified Sign. Of Sign. Of Remarks/action
sample in Sieves retained on weight tive %age weight %age of contractor Site taken
Gms each Sieve retained of weight passing weight with date Engineer
Retained Passing with date
1 2 3 4 5 6 7 8 9 10 11 12
Sl. No. Date Source Height of Height of %age Silt Acceptabili Sign. Of Sign. Of Location Remarks/
of Silt after sand after Content ty as per Site contractor where action
material Setting setting V1/V2x100 specificatio Engineer with date sand taken
(V-1) (V-2) n with date used
1 2 3 5 6 7 8 9 10 11 12
8. Slump Test
Sl. No. Date of Item of work and Vibrators used Quantity of Height of Slump (mm) Acceptibilit Sign. Of Site Sign. of Remarks
Testing location Yes / No water added specimen after y of result Engineer contractor
per bag of removal of or action with date with date
cement mould in (mm) taken
(Litres)
1 2 3 4 5 6 7 8 9 10 11
9. Cube Test
Sl. No. Date of Grade of Mark of 7 days Test Result 28 days Test Result Required Approx. Item of Sign. Of Contractor
Collectio Mix Specimen specified qty work Site /
n strength represent from Engineer contractor'
ed by where the with date s
Specimen sample is representa
collected tive
Signature
with Name
& date
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
10. Density Test by Core Cutter Method
Sl. Location Core Weight of Weight of Weight of Volume of Bulk Moisture Dry Degree of Acceptabi Sign. of Contractor /
No (C.H.) / Cutter Core Cutter Empty Wet Soil (in Core Density Content of Density compacti lity limit Site contractor's
Area Nos. + Weight of Core gram) W= Cutter (in (gram/cc) compaction gram/cc on W4/W5 Engineer representativ
Represented Soil (in cutter (in W1-W2 CC) V W3= W/V layers (M) W4 = W3/ with date e Signature
by the Test gram) (W1) gram) (1+M) with Name &
(W2) date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
11. Test for Thickness and Density of the Compacted Layer (By Sand Replacement Method)
for Asphalt Concrete / Bitumen Macadam / CC Pavement
Lab Test Density in gms/CC ………..
Sl. Date of Qty. Location Thickness of Layer Weight of Initial Weight of Weight of Predetrmi Density = Remarks / Sign. Of Contractor / Action
No Test represent of holes materials weight of sand sand ned bulk A.d. Acceptabi Site contractor's Taken
ed by the removed sand filling in remaining density of W-(W1+W2) lity Engineer representati
test from the taken in cone of in sand ve Signature
carpet Cylinder cylinder cylinder with Name &
Hole date
Sl. No Date of Qty. Location Thickness of Layer Wt. of Moisture Initial weight Wt. of Wt. of Wt. of Wt. of Volume of Bulk Dry Degree of Remarks / Sign. Of Contractor / Action
Test represente of holes (mm) Material Content of sand sand after sand in sand in sand in hole in Density Density compactio Acceptabi Site contractor's Taken
d by the from the %age taken in the filling in hole & cone in hole in CC in in n lity Engineer representati
test hole Cylinder hole in cone in gms gms gms/CC gms/CC with date ve Signature
before filling gms gms with Name &
in hole in date
gms
Sl. Date of Date of Wt. (in No. of Size in Compressive Average Specified Acceptability Sign. Of Site Contractor / Action
No collection of testing Kg) Specimen Cms/Area in Strength Strength in Compressive Engineer with contractor's Taken /
sample Cm2 obtained fro Kg/Cm2 Strength in date representati Remark
individual Kg/Cm2 ve Signature
bricks with Name
in Kg. per & date
Cm2
1 2 3 4 5 6 7 8 9 10 11 12 13