Work before Desychronize

Outage Duration
Shut down Process and PTW
Boiler Works
ID Fan 1
ID Fan 2
PA Fan 1
PA Fan 2
SA Fan 1
SA Fan 2
Drag Link Chain Conv Coal Feeder 2
Drag Link Chain Conv Coal Feeder 1
Rotary Airlock Feeder 2
Rotary Airlock Feeder 1
Combustor - Cyclone
Refractory
Backpass
ESP
Boiler Drum
Superheaater
Shoot Blower
PS and Seal Pot Blower
Start Up Burner
Valves
HP Dosing Pump
Bed Material and AHP
Bed Material and Limestone
Ash Handling Plant
FLY ASH SILO 2
AHP Dust Collector
CEMS
Feed Water System
Boiler water drain
Feed Water system
Boiler Feed Water Pump 1
Boiler Feed Water Pump 2
Deaerator
Boiler Tube Thickness Measurement
Electrical Panel Work
MCC Panel Work
MV Panel 6.6 inspection
GCB Panel Circuit breaker inspection
Generator Control panel Inspection
FCMA Panel
ELECTRICAL STATION CONTROL PANEL (ESCP PANEL) Inspection
BUSDUCT
Steam Turbine Generator Work
Steam Turbin Cooling
Steam Turbine
ESV
Air Removal System / Vacuum pump
Condensate pump
Condenser
LP Heater 1
LP Heater 2
Generator
Turbine Gearbox
Lube Oil System
Turbine Control Valve
HP Bypass Valve
Gland Steam Condenser
LP Dosing Pump
Control System
Transformer Work
Switchyard Work
BOP
Cooling Tower
Instrument Air Compressor
DEMIN PLANT
Plant Modification Work
PTW Cancelation
Preparation for Start Up Work
Boiler
STG
START UP
Synchronization