1. SCOPE
The objective of the pneumatic pressure testing is to locate leaks in the welds
of the reinforcement plates to shell plates and pontoons of floating roof .This
is accomplished by applying a soap solution to a local area of the pressure
boundary surface and creating a differential pressure across that local area of
the boundary causing the formation of bubbles as leakage gas passes through
the solution.

2. PURPOSE
The purpose of this procedure is provide a guide line to carry out the
Pneumatic pressure test to check soundness of welds of the reinforcement
plates to shell plate and the welds of roof seam of cone roof tank.

3. REFERENCE CODE
1. API-650 (Latest edition) (7.3.4) Eleventh Edition
2.TABLE I-1021 of ASME Section V, July 1, 2008 Edition.

4. EQUIPMENT
4.1. The test scheme shall have suitable connections, necessary valve and
calibrated pressure gauge. The gauge shall have a range of 0 psi to 15
psi or equivalent Pressure limits such as 0 in.Hg to 30 in.Hg.

4.2. An air pressure can be created by any convenient method, such as


connection to a gasoline or diesel motor intake manifold or to an air
ejector or pump.

4.3. Gases: The test gas will normally be air; however inert gases may be
used.

4.4. Bubble solution: As per ASME-V, I-1032.

5. PERSONAL
The personnel shall be competent and have thorough knowledge in
performing this method.

Prepared by Concurred by Approved by

CONTRACTOR Hindustan Petroleum Crop. Ltd. Hindustan Petroleum Crop. Ltd


DOC NO

DATE

PAGE NO
02 OF 03
PROJECT TITLE
LONI REVAMPING PROJECT PROCEDURE FOR PNEUMATIC PRESSURE TEST

6. SURFACE PREPARATION
The surface to be examined and all adjacent areas shall be cleaned
thoroughly and free from all dirt, grease, lint, scale, welding flux, weld spatters,
paint, oil and other extraneous matter that could obstruct surface openings or
otherwise with the examination.
Prior to pneumatic pressure testing, joint shall be checked visually.

7. PROCEDURE
SHELL APPURTENANCES-
REINFORCEMENT PLATES TO SHELL PLATES WELDS
The temperature of the surface of the part to be examined shall not be
below 400F( 50C) nor above 1250F( 500C)
Make 6mm diameter-screw threaded Tell tale hole in the reinforcement
pads before its welding to shell and shell appurtenances.
The reinforcements pads shall be tested by applying up to 2 psi in the
pressure gauge between the tank shell and reinforcement plates on each
opening using tell tale hole
Use soap suds on welds between reinforcement plate to shell,
reinforcement plate to appurtenances to shell plate if any defect noticed.
Repair the defective weld and repeat the test till entire satisfaction.
Close the tell tale with a bolts or screw.

8. INDICATION OF LEAKAGE: The presence of continuous bubble growth on the


surface of the material indicates leakage through an orifice passage(s) in the region under
examination.

Prepared by Concurred by Approved by

CONTRACTOR Hindustan Petroleum Crop. Ltd. Hindustan Petroleum Crop. Ltd


DOC NO

DATE

PAGE NO
03 OF 03
PROJECT TITLE
LONI REVAMPING PROJECT PROCEDURE FOR PNEUMATIC PRESSURE TEST

A minimum light intensity of 1000 lux is required for conducting the


examination.

9. REPAIR/RETEST
Defects in welds shall be repaired by chipping, grinding or melting out the
defects from one side or both sides of the joints, as required and rewelding.
Only the cutting out of defective joints that is necessary to correct the defects
is required.
After repairing retest of Pneumatic pressure test shall be carried out.

10. CLEANING
After test the area shall be thoroughly cleaned for the further activities.

11. INSPECTION REPORT

The test shall be carried out in presence of the Engineer In charge /HCPL
Inspector.
Upon satisfactory inspection, a report shall be prepared as per HPCL
approved format.

12. SAFETY
Safety shall be followed as per HSE specification during test.

13. Acceptance Criteria:

The area under test is acceptable when no continuous bubble formation is


observed.

Prepared by Concurred by Approved by