RIG LAYOUT BOHAI-85

FLARE PIT
Ancor
29,6 ft Ancor
WATER TANK
9,3 ft 92 ft

4 ft
0.95m POOR
MUD TANK #3 & MUD TANK #2 MUD TANK #1 9,2 ft BOY CHOKE
MIXING MANIFOLD
8 ft
22 ft
MU 53,1 ft
28 ft D
PU
MP SUB
RIG CARRIER STRUCTURE CAT WALK

178 ft CELL
C
AR
E
L
65 ft PIPE BOX
34 ft L PIP
A E
R BO
GENSET CAT MCC
PIPE BOX X
ACCU
FUE 18,5 ft 78 ft MULA
L 75 ft TOR
TA GENSET VOLVO
NK 24,85 ft
78 ft
COMPRESSOR 117 ft
TO
Ancor
anchor OL Ancor
BO DPS
X
DPS

DPS
PIPE BOX

MUSTER WELDING
COFFEE WATER RIG SUPT
POINT SHOP MEDICAL/AMBULANCE LOGISTIC TANK COMP.MAN RIG MANAGER
TANK MUSTER
WARE HOUSE

SHOP DRIVER/MATERIALMAN HSE OFFICER


#01
WARE WARE POINT
HOUS
E
HOUS
E HSE MECHANIC
#02
TOILET T.PUSHER DRILLER DRIVER CEMENTING
warehouse ELECTRIC SERVICE COMPANY 1 SERVICE COMPANY 2
MUD ENGINEER

PANEL