KEY PLAN :
G F E D C B A QIBLA
KIT.
LIVING/DINING
PR.
PR. PR.
PR.
FCU:-TFC-H-120 LM
DN KIT. E1-L01-APT-103
PR. SHAFT PR.
CORRIDOR
103
103
KIT. 108 AIR FL:-588 L/s
108 1B-C BOU :- 2550
1B-C
STAIRCASE E1-2 STAIRCASE E1-1
SHAFT
FCU:-TFC-H-120 LM UP UP
E1-L01-APT-108 REFUSE
AIR FL:-588 L/s ROOM
BOU :- 2590
LIVING/DINING
BTU METER
LIVING/DINING
INSTALLATION DETAIL
CORRIDOR
TELECOM
ELEC. ROOM
ROOM
MEP VOID LIFT E1-1
FIRE/SERVICE MEP
LIFT SHAFT
WIC. WIC.
BEDROOM MEP BEDROOM
SHAFT
WMC
BALCONY
LIFT LOBBY
BALCONY
104 BATH
1B-F
BATH
104
106 FCU:-TFC-H-140 LM 105
FCU:-TFC-H-90 LM
106 E1-L01-01 E1-L01-02 105
1B-E AIR FL:-625 L/s AIR FL:-360 L/s 1B-E
BOU :- 2500 BOU :- 2500
BATH BATH
LIVING/DINING
WIC. WIC.
107 LIVING/DINING
107
KIT. FCU:-TFC-H-120 LM
WIC. WIC.
E1-L01- APT-104 BATH
FCU:-TFC-M-85 KIT. FCU:-TFC-H-120 LM AIR FL:-588 L/s
FCU:-TFC-H-120 LM
E1-L01-APT-107 E1-L01- APT-105 BOU :- 2650
E1-L01- APT-106
AIR FL:-588 L/s
DRAWER