Trigger point as name suggests, to trigger some action, when some thing is not going as per
planned activity,
In PP, we use it for creating rework order/operation when during confirmation if you find a
product is to be reworked, then we use enter the qty is reworked qty field. System will create
rework order or rework operation as per you designed in Trigger point.
http://help.sap.com/saphelp_erp2005vp/helpdata/en/b1/c04654439a11d189410000e829fbbd/fra
meset.htm
Example REWORK
follows.
Production)
6. Enter change as +.
9. Goto Parameters.
10. In the Parameter enter in the group the created Reference op set group no.
11. Order type as PP01 and group counter as 1 and save the Trigger Point.
14 .Select the OP -
17. The system will says standard trigger point exists from which you can
select the created Trigger Point (EXx Production)and save.
18. MD02/MD04.
19. Convert the Planned Order into Production Order and Release the order.
21. For the last op enter the yield and rework qty
Regards,
R.Brahmankar