You are on page 1of 5

z i n g t h e I m p act Profile of

x im i Case Study

M a s t ru c t ability Owner

n
Mercy Health Partners

C o
of
Facility
®
St. Vincent Mercy Heart Center

E
(Toledo, Ohio)
Case Study of Mercy Health Partners’
St. Vincent Regional Heart Center Completion Date
Summer 2007

R
Owner’s Representative
George Karagiorge

U
By David I. Ruby, P.E., S.E., SECB and Jay Ruby, P.E.
Construction Manager

T
Step 1: Design t
righ Team Formation
The Lathrop Company

T
his article is the third in a series on
p y (Maumee, OH)
Constructability. In the first two arti- Co
Constructability involves the process of
cles, Constructability was defined and thinking through the complete project prior Structural Engineer of Record

C
the stages of Constructability outlined. The im- to beginning the actual design. It requires con- Ruby+Associates, PC
pact of integrating this philosophy is maximized sideration of the entire construction process, (Farmington Hills, MI)
when it is initiated at the onset of a project, dur- beginning in the conceptual design stage.

e
Steel Fabricator

U
ing the planning and conceptual design phases. Constructability usually requires that Art Iron, Inc.

n
The case study reviewed here features the process the Owner go beyond conventional approaches

i
(Toledo, OH)

R
for accomplishing this, and presents the tremen- to project execution by expanding front-end
Steel Erector

z
dous impact that this process delivered for Mercy planning and investing additional money to
Health Partners at their new regional heart cen- allow the design team the time and effort to Gurtzweiler

T a
ter in Toledo, Ohio. address the interrelationship of materials, (Toledo, OH)
Architect

g
equipment and the construction trades. It

S
Case Study: is the Owner who initiates and provides this Martell Associates

a
St. Vincent opportunity for thoughtful initial design Healthcare Architects, Inc.
decisions, and these initial design decisions (Toledo, OH)
Mercy Heart Center

m
establish the principles and the fundamentals
Using Constructability principles, the Mer-
Mechanical Engineer
that will influence the entire design and
DJRM
cy Heart Center Design/Build team success- construction process, and ultimately the
(Toledo, OH)
fully completed the structural steel erection quality of the constructed project.
for the new Regional Heart Center in Toledo, input (not only at the milestones of signifi-
Ohio by implementing a unique structural cant design completion). In addition, design
“This delivery method is better
steel frame in record time, with lower costs documents, subcontractor qualifications, site
and faster than any other method
than the conventional Design/Bid/Build (D/ constraints, weather impact and schedule con-
we’ve ever used.”
B/B) method could ever have achieved. Design George Karagiorge cerns can be evaluated and incorporated into
of the four-story, 144,000 square foot facility Director of Facilities the design during the early stages, up to and
conceived by the Mercy Health Partners be- Mercy Health Partners
including design development.
gan in January 2005 with the initial architec- The construction professional as a member
tural concept drawings. Erection of the main
To benefit from Constructability as a design of the design team assists in reviewing alternate
steel framing was completed in October 2005
philosophy, the Owner (or other entity at risk) framing schemes, fundamental design ideas
— ten months from architectural concept to
should seek to engage a construction profes- and concepts, potential cost and schedule im-
final bolt-up. sional in the planning and concept stages of pact of design options and serves as a sound-
a project. Such an infusion ing board for the entire design team, as well
of construction knowledge as the Owner, while addressing the construc-
Typical Members of the and experience expands the tion process. Research by the Construction
Constructability Design Team decision matrix and fosters Industry Institute (Constructability Improve-
o Architect many more alternatives, fa- ment During Conceptual Planning, Source
o Structural Engineer cilitating more informed ini- Document 4, March 1986) indicates that this
o Mechanical Engineer tial design decisions. Adding involvement drives cost reductions between 6
construction expertise to the and 23 percent and benefit/cost ratios of up to
o Civil Engineer
design process delivers more 10 to 1, in addition to significant reductions
o Geotechnical Engineer accurate and up-to-date cost in the project schedule. Addition of steel con-
o Owner or Owner’s Representative and material information, struction experience early in the design pro-
o General Contractor recognizes conflicts of trades, cess for the Mercy Heart Center resulted in
o Steel Fabricator / Erector addresses material and skill significant savings in the structural steel costs
o Constructability Consultant availability and provides for for the building.
continuous value engineering continued on next page

Posted with permission by STRUCTURE® magazine  November 2006  www.STRUCTUREmag.org


The Mercy Heart Center design team in- the project. Inserting construction knowledge pertise. This knowledge and experience was
cluded a structural steel fabricator and a and expertise can avoid such excesses, but only a major contributor to the success of Mercy
Structural Engineer of Record (SER)/Con- when this expertise is engaged in the planning Heart Center design team.
structability Consultant, as well as the typical and design teams, and project constraints are The Mercy Heart Center is a new building
team members. The Architect, Mechanical addressed early in the design process. added to an existing medical campus. The new
Engineer (ME) and SER/Constructability As an active team member, the SER assists facility included two wings, one 4-story and one
Consultant worked hand-in-hand in the de- with initial building development, bay spac- 1-story with a basement. The existing campus
velopment of bay spacing, framing schemes, ing or lateral support element placement, and was to continue in service without disruption
®
floor-to-floor heights and the location and evaluation of framing options to maximize in- during construction of the new facility.

E
nature of the lateral load-resisting system. terior space and maintain space use flexibility. During the initial project planning meet-
The fabricator provided input on material When doing this, the SER incorporates: ings, the design team learned that the Mercy

R
availability, preferred practice and schedule o Site conditions and constraints Heart Center was landlocked and suggested
impact; and the General Contractor, Geotech- o Building Code Requirements that Mercy Health Partners consider future
nical Engineer and the SER/Constructability o Owner’s program, wants and needs expansion possibilities during facility design

U
Consultant jointly developed the foundation o Proposed building usage and access to minimize expansion costs later. The Geo-
and subgrade framing schemes. o Architectural considerations technical Engineer predicted minimum bear-
t
righdecisions impact the proj-

T
All such design ing capacity for shallow foundations for both
p y
Step 2: Data Gathering and Co schedule; knowing the structural
ect cost and the 1-story and the 4-story wings. The SER/
considerations (and their related cost ramifica- Constructability Consultant recommended
Recognizing Constraints

C
tions) during the initial planning and design consideration of enlarged deep foundations
In a traditional Design/Bid/Build project, process provides the opportunity for the ex- for the 1-story wing, designed to accommo-
the role of the SER may be limited to com- ploration and identification of options, facili- date future expansion, since the cost to in-

e
U
pleting the design of a structure as defined by tating better, informed decisions. crease the size of the deep foundations would

n
the Architect, often with minimal involvement While this is the role that the SER plays be minimal and deep foundations were re-
during concept development and minimal op-

i
R
during project planning and design, the quired for the basement. The general con-

z
portunity to fully understand or to influence Constructability Consultant adds another tractor developed the confirming cost and
the final design concept. This may lead to un- dimension — knowledge of the construction schedule data, and Mercy Health Partners

T a
necessary cost and schedule implications for process and fabrication and installation ex- proceeded with this inexpensive means to ac-
commodate the potential future expansion.

g
S a Step 3: Structural Program
Development

m The determination of the appropriate


framing system for a structure drives the
lower boundary of the economics and con-
structability that can be realized as the de-
sign progresses.
During the framing option evaluation
for the Mercy Heart Center, the SER/Con-
structability Consultant, Fabricator and
General Contractor studied the impact of
future expansion for the 1-story wing. The
team developed the costs for designing and
building today’s structure to accommodate
future expansion plans, considering material
and fabrication requirements. Given the data
developed, Mercy chose to have the 1-story
structure designed to accommodate an ad-
ditional three stories. The columns were ex-
tended and prepared for future splices, and
connection angles were attached to the girder
beams, facilitating minimal disruption when
the expansion is performed.
All of these upfront design decisions proved
to be very prudent. The “future” expansion
was ultimately completed as the original con-
The lateral load resisting system chosen by the Structural Engineer and endorsed by the fabricator struction project was underway. This was
consisted of field welded moment frames in both directions, maximizing flexibility for space done without impact to the overall construc-
utilization and simplifying shop drawing preparation and approval. The structural steel frame tion schedule because the design/construc-
was designed and fabricated with simple framing, using similar members, allowing the fabricator tion team had made accommodations for it
to standardize the fabrication process. Connections were designed based on fabricator/erector in the original design.
preferences and other economic factors.

Posted with permission by STRUCTURE® magazine  November 2006  www.STRUCTUREmag.org


®

R E
U
h t
yrig

T
Cop

U C i n e

S T R
Note: This project was designed and fabricated
during the period when steel was subject to
surcharge pricing and delivery allocation.
Therefore, the cost implications of over-ordering
m
g a
sisted of field welded moment frames in both
directions. This scheme provided maximum
z
During construction, sequencing was extremely complex. The site was very tight, with no lay down or storage areas, and minimal space for the crane and for

a
receiving material. The structure had to be built using the just-in-time delivery method. Construction expertise during the planning stages facilitated execution
of this critical aspect of the project.

flexibility for space utilization, simplified shop


drawing preparation and the approval process,
The framing option evaluation must
consider the relative costs of options and
steel were severe, and the fabricator had and allowed the fabricator to standardize the schedule impact given:
additional pressure to accurately estimate facility fabrication process: o Architectural requirements
steel quantities. o Columns, although spliced
where necessary, remained the  Architectural features
same size for the full height of  Integration – structure/architecture
Step 4: Design process
the column, o Fabrication considerations
The Mercy Heart Center design team jug- o Girder beams generally
gled multiple considerations: the floor uses, remained the same size,  Connection options
operating and prep rooms, intensive care, o Typical moment connections  Material availability
recovery and examination rooms and the cir-  Shipping and receiving
were detailed with standardized
culation of the new facility. In addition, the extended shear plates,  Site lay down and yard area

team accommodated needs for future expan- o Filler beams were dropped two  Maximum size, weight and/or length

sion in establishing the bay spacing and final- inches to eliminate copes and o Construction considerations
izing the lateral load resisting scheme. This framed with single angles, and
forward thinking was put to the test when o The connection design was  Site considerations
Mercy Health Partners moved the third floor performed by the SER based on • Access
operating rooms of the 4-story wing to the fabricator/erector preferences • Lay down area
second floor of the 1-story wing well into the and other economic factors. • Trade coordination
project. The expansion of the 1-story wing and The shop drawings were prepared using the • Security
the relocation of the operating rooms were ac- SDS2 computer detailing program. Through • Work constraints or restrictions
complished with minimal design impact. the AISC CIS/2, the SER’s model output was  Equipment availability
The project delivery schedule on the project imported by the detailer into SDS2. The de-  Labor availability and overtime
also was compressed, which impacted the de- tailer then assigned the connection attributes required to staff the project
sign process. Material was ordered using the based on the SER’s connection design and the
structural model, prior to completion of final shop drawings were prepared with minimal
design check and the design of the connec- coordination issues.
tions. The lateral load-resisting system chosen
by the SER and endorsed by the fabricator con-

Posted with permission by STRUCTURE® magazine  November 2006  www.STRUCTUREmag.org


The specifications and the drawings should the raising gang, the plumbing and detail
During the design process, clearly differentiate between the separate seg- gangs bolt, plumb, weld, etc. the structure
the SER considers: ments of the industry. That way the individual in the same sequence. The metal deck and
o Framing contractors will be able to clearly define the shear studs are installed closely behind the
 Material Availability (shapes, scope of work upon which to quote, and ulti- detail gang, followed by placing the concrete
grades, sizes) mately, to perform. Team work is an essential slab. The other trades follow with everyone
 Fabrication element of construction. The ideal structure working the project plan, on schedule and
• Types of connections from a constructor’s view point will allow each within budget. ®
• Modular or sub-assemblies trade to perform the work in an efficient, or- For this to happen, much planning is re-

E
• Camber derly manner and leave the jobsite never to quired, focusing on the construction se-
• Superelevation return. This is a concept that is attainable quence. Everyone on the Design Team and

R
• Maximum size, weight on most projects with proper planning. The the Construction Team must plan their work,
and/or length SER should review the nature of the struc- and then work the plan. Adequate access roads
 Construction ture and its lateral-load resisting system with must be available throughout the jobsite for

U
• Types of connections the Owner’s representative (Construction equipment to operate, adequate on-site stor-
• Modular of sub-assemblies Manager, General Contractor) to facilitate a age must be available to facilitate just in time
t
righand sequenced project.

T
• Special installation considerations properly planned delivery of materials, and labor and equipment
y
• Camber Cop must be available to meet project needs.
• Superelevation Installation Process During the construction of Mercy’s Heart

C
• Maximum size, weight While planning and scheduling are ex- Center, this was expertly demonstrated. The
and/or length tremely important in saving money and time, site was very tight, with no lay down or stor-
age areas and minimal space for the crane and

e
o Member Selection sequence of construction is the key to imple-

U
o Detail Development mentation of these, and this is driven by the for receiving material. The structure had to be

n
o Connection Design execution of Step 2. In structural steel, like built utilizing the just-in-time delivery meth-

i
R
manufacturing, the most efficient process is od. The structural steel frame was designed

z
“just in time” delivery of material. The objec- and fabricated with simple framing, using
similar members, and connections that could

T
tive is to minimize the handling of the struc-

a
Step 5: Design completion tural steel, allowing sections to be fabricated, be quickly and safely installed to minimize
equipment and raising gang hours.

g
delivered to the site, and erected in sequence.

S
Contract Bid Documents During erection, the crane progresses from The SER/Constructability Consultant ac-

a
Without experience, “one does not know one end of the building to the other, setting complished this by providing the fabricator
what one does not know.” The problem with each piece of steel in sequence — with no with a preliminary design with member size op-

m
experience is that it takes so long to acquire. comeback work. After the material is set by tions shown in lieu of specific sizes (in Step 2).
Therefore, involving a Constructability Con-
sultant in the preparation of the Contract
Bid Documents delivers tremendous benefits
to the Owner. Coordination begins with the
Architect and the SER and other design disci-
plines, and continues among all disciplines as
the bid packages are developed.
The Contract Bid Documents should clear-
ly explain the Owner’s vision, objectives and
goals, outline the design criteria for the struc-
ture and contain sufficient information for
a qualified steel contractor to properly price
the structure, and upon award, to build the
structure according to the assumptions made
at the time of bidding. Sufficient information
should be provided within the documents to
allow the sharing of the risks and rewards for
creating the structure.
Bid package development
should define:
o Structural assumptions
and requirements
o Special installation
conditions or considerations
o Special fabrication or
installation tolerances
o Project-specific and site-
specific Specifications and
Special Conditions Using Constructability principles, the Mercy Heart Center Design/Build team shaved 16 weeks from the
schedule and 140 tons of steel from the structure of the four-story, 144,000 square foot facility.

Posted with permission by STRUCTURE® magazine  November 2006  www.STRUCTUREmag.org


The fabricator grouped member sizes
based on mill rolling requirements,
cost, shop fabrication practice and
the building installation schedule.
The members were grouped as col-
umns, girders, filler beams and base
plates. The SER’s computer model
was revised using the grouped mem- ®
ber sizes, reanalyzed to account for

E
any additional stiffness and issued to
the fabricator for construction.

R
Coordination among the trades
extended beyond the foundations
and structural steel:

U
o The design of the light-gauge
cold-formed exterior wall
ht
yrig

T
system was designed to be
compatible with the shop Cop
installed slab edge angle. The

C
exterior wall system was
designed and detailed with
adjustable connections that

e
U
accounted for the plumbness of

n
the structural steel and any

i
R
variation in floor elevation.

z
o Areas of the metal deck were
left open to provide access

T
Facing a very tight construction schedule, Mercy Health Partners incorporated a Structural Engineer and Fabricator/
to the basement for delivery
and installation of the masonry

g a
Erector into the planning team. Design began in January 2005 with the initial architectural concept drawings. Erection
of the main steel framing was completed in October 2005 - ten months from architectural concept to final bolt-up.

S
partition walls. Mission accomplished.

a
o The pedestrian bridge between Final Step: Conclusion
the Mercy Heart Center and
Mercy Health Partners is an advocate for innovative designs and creative thinking to drive the ever-

m
an existing parking garage was
fully assembled, with the floor changing healthcare industry. For years, Mercy has partnered with seasoned hospital contractors to build
and roof deck to be installed in a construction team to optimize project budgets and schedules.
one piece; however, because of Mercy’s Heart Center project was the first time Mercy partnered with a Structural Engineer and
the geometry, the bridge lift was Fabricator/Erector. As the Owner’s representative, George Karagiorge faced a very tight construction
eccentric. The SER analyzed the schedule. With the structural steel designer and the fabricator involved from the beginning of the design,
lift and determined that the the team incorporated “Constructability” concepts to streamline fabrication and expedite erection,
addition of load to one end delivering a better-designed structure in less time, for less money.▪
would allow the bridge assembly
to be lifted in a level position the Just The Facts
first time it was pitched. Design/Build Method Design/Bid/Build Method
Design Time (10) weeks Design Time (10) weeks
Bid / Estimate Time (0) weeks Bid / Estimate Time (4) weeks
David I. Ruby, P.E., S.E., SECB, F.ASCE, Award Time (0) weeks Award Time (1) week
is a Principal with Ruby + Associates Prepare ABM (1) day Prepare ABM (3) weeks
PC, in Farmington Hills, Michigan. Mr.
Order Material (1) week Order Material (1) week
Ruby specializes in steel designs that speed
Detail Shop Drawings (6) weeks Detail Shop Drawings (8) weeks
and ease constructability. David can be
reached via email at druby@rubyusa.com. Approval Review Time (1) week Approval Review Time (3) weeks
Incorporate Design Changes (1) week Incorporate Design Changes (4) weeks
Jay Ruby, P.E., is an Associate and Project
Fabricate Steel (8) weeks Fabricate Steel (9) weeks
Manager with Ruby+Associates, PC. He
has extensive experience in building design Erect Steel (8) weeks Erect Steel (9) weeks
and a practical understanding of construc- Total Duration - 35 weeks & 1 day Total Duration - 52 weeks
tion methodology for hangars/aviation, Real Time Schedule Savings – 17 weeks
industrial, healthcare, institutional and Dollars & Sense
educational facilities. Jay can be reached
$2,345,000.00 $2,800,000.00
via email at jruby@rubyusa.com.
$16.28 / SF $19.44 / SF
772 Tons 910 Tons
$3,037.57 / Ton $3,076.92 / Ton

Posted with permission by STRUCTURE® magazine  November 2006  www.STRUCTUREmag.org