Professional Documents
Culture Documents
Seminar
Presentation Outline
► TAHAL Group
Company Video
► TAHAL Romania
3
QUICK FACTS
► Established: 1952
► Privatization: 1996
4
TAHAL GLOBAL DEPLOYMENT
► Projects footprint: > 50 countries
► Headquarters: Amsterdam, Netherlands; Tel Aviv, Israel
► Headcount: appr. 650 employees
► 60 Years of agriculture, water resources & infrastructure development
5
FIELDS OF ACTIVITY
► Water resources ► Wastewater ► Drainage & ► Solid waste ► Natural gas systems
development systems irrigation projects treatment ► Offshore pipelines
► SCADA control ► Reuse for ► Agro-industry impact assessment plants and industries
systems agriculture ► Protected ► Pumped storage
► Training
6
TAHAL Romania
7
TAHAL Romania
8
Major projects by TAHAL Romania
9
Major projects by TAHAL Romania
10
Major projects by TAHAL Romania
11
Rehabilitation of irrigation
infrastructure…
12
Case Study- Rehabilitation of irrigation
systems in Serbia
13
Serbia
• Project overview:
– The largest irrigation project
in the country
– Project Value- 63 million
Euro
– 10,500 hectares
– Crops: Maize, wheat,
soybean, sunflower
– Design and implementation
of 7,000 irrigated hectares by
93 machines.
– Design and construction of 2
logistic centers including 2
silo systems with 45,000 ton
storage capacity
14
Rehabilitation of pump stations
and intakes
Agrobacka- Before
16
Agrobacka- After
Hectares irrigated Current capacity Hectares Irrigated
Pump Station Former capacity (m³/h) before upgrade (m³/h) after upgrade
Agrobacka 400 180 510 205
17
Jadran- Before
18
Jadran- After
Hectares irrigated Current capacity Hectares Irrigated
Pump Station Former capacity (m³/h) before upgrade (m³/h) after upgrade
Jadran 400 170 910 363
19
Karadjordjevo- Before
20
Karadjordjevo- After
Hectares irrigated Current capacity Hectares Irrigated
Pump Station Former capacity (m³/h) before upgrade (m³/h) after upgrade
Karadjordjevo 1200 0 1930 775
21
Mladi Borac- Before
22
Mladi Borac- After
Hectares irrigated Current capacity Hectares Irrigated
Pump Station Former capacity (m³/h) before upgrade (m³/h) after upgrade
Mladi Borac 700 310 1150 461
23
Irrigation canals rehabilitation
Before rehabilitation
25
Bush and sediment clearing
26
Earth works and bush clearing completed
27
Lining the canal with PVC
28
Lining the canal with PVC
29
Work completed- Ready for use
30
Key points learned
31
THANK YOU
32