The document analyzes the rate per quintal for wrought iron and mild steel ladders, grills, gratings, window guards, doors, staircases, and railings including the cost of screws, welding rods, and installation. It lists the Central Schedule of Rates (CSR) rate of Rs. 6894.90 per quintal, adds 23% construction premium to get Rs. 8480.73 per quintal total rate, then reduces the rate by Rs. 846.30 per quintal due to a steel price amendment to get the balance rate of Rs. 7634.43 per quintal.
The document analyzes the rate per quintal for wrought iron and mild steel ladders, grills, gratings, window guards, doors, staircases, and railings including the cost of screws, welding rods, and installation. It lists the Central Schedule of Rates (CSR) rate of Rs. 6894.90 per quintal, adds 23% construction premium to get Rs. 8480.73 per quintal total rate, then reduces the rate by Rs. 846.30 per quintal due to a steel price amendment to get the balance rate of Rs. 7634.43 per quintal.
The document analyzes the rate per quintal for wrought iron and mild steel ladders, grills, gratings, window guards, doors, staircases, and railings including the cost of screws, welding rods, and installation. It lists the Central Schedule of Rates (CSR) rate of Rs. 6894.90 per quintal, adds 23% construction premium to get Rs. 8480.73 per quintal total rate, then reduces the rate by Rs. 846.30 per quintal due to a steel price amendment to get the balance rate of Rs. 7634.43 per quintal.
Analysis of rate for Wrought iron and mild steel ladders, framed grills, grating etc.
with ends of bars
welded or forged, framed window guards, barred iron doors, stair case, iron railing including cost o or screws or welding rod, complete fixed in position.
Unit: Qtl.
CSR/18.4 Rate as per CSR
Add 23% C.P.
Total Rate:
Less due to reduction of rate of steel as per amendment.
(Rs 4500-3694 = 806/-) = Rs. 806 x 1.05 = 846.30/- Balance: Say Rs. 7634/- per Qtl. SDE Divisional Engineer (C-3 GMAD 6894.90