The document is an as-built drawing of the cross section of the main road for a section of the Cileunyi-Sumedang-Dawuan toll road construction project in Indonesia between stations 9+750 and 10+350. It was produced by the project implementation unit for the Cisumdawu toll road on November 8, 2011 under contract number KU.08.08/PJBHC/228.
The document is an as-built drawing of the cross section of the main road for a section of the Cileunyi-Sumedang-Dawuan toll road construction project in Indonesia between stations 9+750 and 10+350. It was produced by the project implementation unit for the Cisumdawu toll road on November 8, 2011 under contract number KU.08.08/PJBHC/228.
The document is an as-built drawing of the cross section of the main road for a section of the Cileunyi-Sumedang-Dawuan toll road construction project in Indonesia between stations 9+750 and 10+350. It was produced by the project implementation unit for the Cisumdawu toll road on November 8, 2011 under contract number KU.08.08/PJBHC/228.
DIRECTORATE GENERAL OF HIGHWAYS DEVELOPMENT OF CILEUNYI - SUMEDANG - DAWUAN TOLL ROAD (PEMBANGUNAN JALAN TOL CISUMDAWU PHASE I STA 9+750 - STA 12+000 AND STA 13+100-STA 17+200) AS BUILT DRAWING OF CROSS SECTION MAIN ROAD STA 9+750 - STA 10+350 CONTRACT : KU.08.08/PJBHC/228 DATE : NOVEMBER 8TH, 2011 SATUAN KERJA PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU