Professional Documents
Culture Documents
Contents
o Production Schedule
o Script / Shooting Script
o Storyboard
o Props List
o Crew List
o Location Recces
o Clearances and Confirmations
o Contingency Plan
Production Schedule
Please include location, time of film, what you are filming and teams members
including actors
Date: 29/01/18
Monday Tuesday Wednes Thursd Friday Saturd Sund
ay ay ay
Pre Pre Film first Pre
producti producti set of producti
on on footage on
and pre
producti
on
College College College College
and
gossmor
e park,
Marlow,
3:30pm
Joe Joe Joe, Joe
needed needed lewis needed
and
louis
needed
Date: 05/02/18
Monday Tuesday Wednes Thursday Friday Saturday Sunday
edit edit Film edit
second
set of
footage
College College Gossmore College
park,
marlow,
3:30pm
Joe Joe Joe, lewis Joe
needed needed and louis needed
needed
Date: 12/02/18
Monday Tuesday Wednes Thursday Friday Saturday Sunday
Filming Filming filming
Gossmore Gossmore Gossmore
park, park, park,
marlow, marlow, marlow,
3:30pm 3:30pm 3:30pm
Joe, lewis Joe, lewis Joe, lewis
and louis and louis and louis
needed needed needed
Date: 19/02/18
Monday Tuesday Wednes Thursday Friday Saturday Sunday
Edit Final deadline
edits
College College
Joe Joe
needed needed
Music Video Shooting Script
Description of visuals Lyrics
The video will begin with drone shots of I'd say, see you later, if I thought I'd see you
the river and cinematic shots of the later
singer walking along the river during the And I'd tell you, that I loved you, if I did
slow instrumental beginning of the song. It's so strange, deciding, how to feel about it
It's such strange, emotion, standing there
Once the lyrics begin the video will cut beside it
to the singer in a tunnel which is where
the lip-syncing will begin, I will shoot the I'm home, with moonlight on the river, saying
lip syncing shots in the tunnel from many my goodbyes
different angles so that I can switch I'm home, there's moonlight on the river,
back and forth from the multiple angles everybody dies
to make the video more exciting and
less boring. I'd say, see you next time, if I thought there
were a next time
For the chorus I will cut back and forth Easy conversation, ain't exactly where we're at
from the singer and shots of the It's so strange, deciding, how I feel about you
moonlight shining on the river with white It ain't like, I ain't used, to going on without you
text coming across the frame that says
“moonlight on the river” I'm home, with moonlight on the river, saying
my goodbyes
Between the first chorus and the I'm home, there's moonlight on the river,
second verse there is another everybody dies
instrumental section which I will go back I'm home, with moonlight on the river, saying
to the cinematic and drone shots of the my goodbyes
singer walking along the river. I'm home, there's moonlight on the river,
everybody dies
I will do the same thing as above for the
second verse and chorus and then the
video will end using cinematic and
drone shots during the instrumental
ending of the song
Props List
Location Address: 40
Gossmore Ln, Marlow
Hazards Solutions:
May fall into river Keep a safe distance away from the
river
Clearances and Confirmations
You need confirmation emails from everyone that is featuring in your music
video. Please screenshot these emails including the dates and times they are
agreeing to paste them below.
Contingency Plan
What are your plans for if something goes wrong? What back up actors,
locations and equipment do you have?
I am aiming to film on the 31st January as it will be a full moons and the next
one after that is not until after the deadline so if the sky is not clear or the
weather turns out to not be great I can film on other days that I have put on
my production schedule but the only difference will be that the moon will not
be as clear or as big. I have sent a conformational email to a backup actor
in case Lewis is unavailable for any reason and I had a reply saying that he is
available.